Sökresultat:
491 Uppsatser om Slope calculation - Sida 11 av 33
En energiutredning och miljöklassning av Hemsta 12:16
The purpose of this study was to implement an energy analysis and environmental evaluation of the property Hemsta 12:16 in Gävle. Based on two different methods, Energy Balance calculation and Environmental Building, the result of the property's energy use, energy performance and environmental impacts are presented. Except that, measures to reduce final energy consumption are presented. The proposed measures can reduce energy usage by 100 400 kWh / year, which represents a decrease of 18% of the present energy usage. This would represent a total savings of 63 000 SEK per year. In addition, the environmental performance is improved by adopting the suggested measures..
Simulering av elektriska förluster i en vindkraftpark : Utveckling av programvaran Wind Farm ElectricSystem Calculator (WFESC)
When planning new wind farms, the cost for the internal electrical grid is estimated to account for 8-9 % of the total investment cost. On top of that, the cost for accumulated reduced income over several years (due to electrical losses), has to be added. The economic lifespan is relatively long (about 20 years) which means that an error in the loss calculation could lead to a bad decision basis. The accumulated reduced incomes due to electrical losses can be higher than the initial investment cost for the internal electrical grid.Today, Statkraft Sweden is using a template number when estimating the electrical losses in a wind farm. The actual losses are probably lower than the template number which could lead to an unnecessary high loss cost when planning a new wind farm.The aim of this M.Sc.
Total Cost of Ownership -Revealing the true cost of owning and operating equipment
Abstract Title: Total Cost of Ownership ? Revealing the true cost of owning and operating equipment. Authors: Anna Bladh Anna Ström Tutors: Michaela Boye, Parts and Service, PTD, Alfa Laval Göran Berg, Parts and Service, PTD, Alfa LavalCharlotta Johnsson, Department of Automatic Control, LTH, Lund UniversityBertil I. Nilsson, Department of Industrial Management and Logistics, LTH, Lund UniversityCarl-Henric Nilsson, Department of Business Administration, Lund University Core issue: ?Which costs should be included in a general Total Cost of Ownership model regarding centrifuges, and what input variables are needed in order to calculate those costs in a user-friendly way and with a maintained level of accuracy?? Purpose: The theoretical purpose of the thesis is to identify the cost items that have the greatest impact on a TCO calculation for a centrifuge.
CE-ma?rkning av produkter under byggproduktfo?rordningen
The purpose of this study is to achieve an understanding of how a CE- marking process is conducted and to identify the relevant factors that must be considered in such a process. We have conducted our study at Lo?vhults Svets & Smide AB (Lo?vhults) in Skruv, Sma?land Sweden, which are manufacturing brackets for small covering constructions.To understand how a CE-marking process is conducted several documents and provisions have been reviewed to achieve a basic understanding and insight of the subject. It thus led to that guideline ETAG 015 were studied and the factors to be considered in the CE-marking of brackets were identified. Together with Jan-A?ke Johansson at Lo?vhults we agreed on four different brackets to investigate for a potential CE-marking.
En utvärdering av Audiolet för portandet avett röst-drivet program till webben
We where asked to write a webapplication, with similar functionalityas an existing desktop application. The application can todayrecord sounds from a person, mix it together at the optimal place withanother, similar sound and play back the result.The application used mathematical calculation that the developerswhere not familiar with, therefore it was decided to focus on the partsthat involved recording and playing sound, to pave the way for anyfuture implementation.The follwing prototypes where implemneted:1. Read a sound clip from a file.2. Splicing of two sound clips at different points in the clips.3. Generate the sound of a guitar.The result of this evaluation is that web browsers today are notready for this type of application, but that there is potetial as soonas W3C have standardised the use of a microphone as a source to theexisting DSP functions..
Samarbete mellan lantbruksföretag : möjligheter och problem
Nowadays, cooperation is necessary and this study tries to illuminate the possibilities and problems about cooperation in fiction between 7 small/midsize farms in Skåne. Conventional Farming is done with grain and sugarbeets as specialization. Calculation of machine costs have been done and compared in the study, both for the farms in thorough and the fictitious operation companies. Business ratios as depreciation/ha, interest/ha and maintenance/ha have been calculated.
In this essay we present a proposal about how a practical implementation can be done. In the proposal there is an example how the distribution of work can be done.
LCC-analys av FTX-system : En jämförelse av centralt- och lägenhetsplacerat
This report is the result of a thesis conducted at the consulting firm Bjerking AB andis the final part of the Bachelor Programme in Construction Engineering at Universityof Uppsala. The work aims to investigate the costs and how the choice of ventilationsystem affects building projects during a long-term period. This report covers costssuch as investment, maintenance and energy but also how they affect residents andbuilders. Building regulations for energy consumption are expected to be tougher;therefore a comparison of two different heat recovery ventilation systems(HRV-system) was made. One system is based on a centrally placed unit that coversthe whole buildings ventilation through vertical shafts.
Design och utveckling av kommersielltbabypaket för blivande föräldrar
This project is implemented as a thesis at the Royal Institute of Technology in the master?s degree program Integrated Product Design and Industrial Design Engineering. The project has involved development and efficiency of a free starter package for expectant parents with useful content consisting of useful products for both before and after childbirth. Areas that have been investigated include packaging development, service design and appropriate content for the package.During the work, theory about packaging design, materials, manufacturing techniques and logistics have been processed to base the further work on. The project process has involved competitor analysis and interviews with store owners and customer surveys, that have been conducted to identify areas for improvement of the current solution.
KORTSIKTIG PRODUKTIONSPLANERING I MINDRE FJÄRRVÄRMESYSTEM : En studie vid Strängnäs Energi AB
District heating covers around 80 % of the heating demand in apartment buildings and 10 % in single-family homes in Sweden. In the year 2010 the total input of energy to the Swedish district heating grids was about 70 TWh, which corresponds to 11 % of the total energy input to the whole energy system in the country. Through the combined production of heat and power the CHP-plants often reaches an efficiency of 90 % from energy in the fuel to produced heat and power. In order to keep the efficiency high it is important for the owners of the plant to have good knowledge about the plants performance at different operation points. Strängnäs Energi AB initiated this diploma work together with FVB Sverige ab in order to come up with a program for short term planning of the production of heat and power at the company´s CHP-plant.The work consists of three main parts.
Möjliga alternativ för att ersätta direktverkande el i flerbostadshus
I have in my thesis, examined the possibilities in terms of energy for a condominium association.To have an effective and good energy is becoming increasingly important with today's rising electric and oil prices. In my thesis I have used the condominium association Kärralyckan, which is situated in Falkenberg. The buildings at Kärralyckan are built in the mid-1970s, and are heated by electric radiators. The tap water is heated by an electric boiler.Based on that calculation I can show the various energyststem. The different solutions have been developed by contact manufacturers and installers through phone calls and e-mail.According to the results shows that geothermal heating has been a great solution for Kärralyckan.
Pottaskeframställning och tjärbränning i Femsjö socken från år 1700 till 1900 :
Femsjö is a small parish situated in Hylte municipality, Växjö diocese. The parish has a total area of 8230 ha of which 5000 ha are covered with forest. There have not been any large industries in the parish offering work opportunities for the inhabitants, so they have had to generate income from their land and the forest. Instead of going to the bank to get a bank loan the people of Femsjö parish went out in to the forest and harvested trees for timber and extra cash revenue. Production of pine tar and potash were two other ways that the residents of Femsjö parish could earn extra money for the household in order to keep starvation away.
Projektering av platsbyggd villa
SammanfattningDetta examensarbete är ett utformningsprojekt av en platsbyggd villa. Frågeställningen tillprojektet var hur man kan utforma en villa.Jag har undersökt vilka A-ritningar, K-ritningar samt statiska beräkningar som behövs för attproducera en platsbyggd villa.Resultatet visar färdiga ritningar till bygghandlingar vilket betyder enplans villa medattraktiv/öppen planlösning och en stark byggnadsstil med tydliga inflytanden av funkisstil.Detta tydliggörs genom pulpettaken, och fasaden som är delvis liggande panel, delvis vitputsad.Yta: 153 kvmAntal rum: 6, varav sovrum: 3.
Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.
The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building.The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization.The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis.The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building. The following issues have been dealt with in the report;- Did the building in the project manage the requirement to achieve an energy consumption that is 25% lower than the requirements in BBR?- What technical measures/system was selected in the building?- What kind of cooperation was the project based on?- What is required for consultancy companies and real estate owners to become members of the Green Building?The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m2, year.
Kundlönsamhet: en fallstudie av handelsföretaget Wiberger
The aim of this thesis is to examine the customer profitability in a wholesale company. A case study of Eugen Wiberger AB has been conducted. Firstly the authors have examined the current perception of the company regarding their customer profitability and the results of their calculation of the customer profitability. Secondly an Activity-Based Costing analysis has been performed and has been compared to the perception in the case company. The conclusions are that the smaller customers are the least profitable, and in some cases unprofitable, whereas the larger customers are profitable.
Glukos och leucin som potentiellt hjälpmedel i återuppbyggandet av muskelglykogen efter hårt arbete hos travhästar
The aim of the project was to study the effect of oral administration of glucose and leucin on the resynthesis of muscle glycogen after intense exercise in Standardbred trotters.
In a crossover design, 11 Standardbred trotters performed a standardized exercise test on two occasions in order to deplete muscle glycogen. The exercise test comprised a warm up period, 7 repeated bouts of exercise on an uphill 500 m slope, and a recovery period. After the exercise test horses received: 1) a solution of glucose and leucine via a nasogastric tube at 0 minutes and at 240 minutes post exercise and a single bout of glucose at 120 minutes post exercise or 2) water (placebo) at 0, 120 and 240 minutes. Blood samples for measurement of glucose and insulin concentrations were collected at rest, when the horses returned to the stables directly after exercise and throughout the 6 hour recovery phase. During the first recovery hour, samples were collected every 15 minutes and then every 30 minutes over the next 5 hours.