Sök:

Sökresultat:

1707 Uppsatser om Shower water heat exchanger - Sida 7 av 114

Naturlig förekomst av arsenik och avskiljning av arsenik från grundvatten : test av olika filtertekniker avsedda för enskilda brunnar

During the last few years the presence of high arsenic (As) concentrations in ground water has been of major concern both internationally and in Sweden. Much evidence has been reported about toxic effects caused by arsenic. The carcinogenic effects and the possibility to measure the toxic impacts at low concentrations made the World Health Organisation (WHO) to reduce the guideline value from 50 to 10 ?g l-1 in 1993. In Sweden the corresponding reduction was implemented in 2003. Several surveys in Sweden have shown that high arsenic concentrations may occur in ground water.

Datormodellering av en värmelagrande betongväggs inverkan på det termiska klimatet i ett växthus

This report describes the building of a computer model that makes it possible to simulate the thermal climate in a greenhouse. The computer model is built on the physical theory of heat exchange that occur in a greenhouse, such as radiation and convective heat exchange. The model also includes the heat storage that is active in a greenhouse.The computer model is used to simulate the thermal climate in a greenhouse under three periods, winter, spring and summer. It also investigates which effect a concrete wall has on the thermal climate in a greenhouse. The purpose of putting a concrete wall in the greenhouse model is to investigate the possibility to store heat during the day and then use this heat when the temperature drops during the night.The result from the simulations shows that a concrete wall levels the big difference in temperature that normally occurs under a day in a greenhouse.

Värmepumpars inverkan på elkvaliten

Modern technology and fast development of heat pumps, the hunt for savings in energy consumption and the strive for environmentally friendly energy sources, convenience, and financial profit, have made heat pumps a reasonable alternative for the heating of houses.When the heat pump starts it will consume a considerable amount of current, which may result in a short-lived voltage-drop if the power grid is weak compared to the start-up current.The company Fortum Distribution which owns and administrates electrical network is interested in an investigation that deals with heat pumps affect on the quality of electricity.The purpose of this investigation is to study fast electrical fluctuations (flicker) as a result of start-up currents for single as well as multiple heat pumps on the same electrical station and from this evaluate whether there will be any problems installing heat pumps..

ENERGIÅTERVINNING I GRANSHOT® - PROCESSEN

Uvån Hagfors Teknologi AB (UHT) has developed a process ? GRANSHOT® ? for quicksolidification of metals in water baths. In the process liquid metal is splintered ? granulated ?into small drops. The drops are rapidly cooled in a water bath where all the heat energy from theliquid metal is transferred into the water.

Värmestyrning I Handske

This rapport is result of a project. The purpose of which was to design a circuit that is used in a heat glove. The heat glove is the technical aid which provides heat inside a glove.It is specially suited for old people who have problems with cold hands because of decreased blood circulation.There already was an old circuit in the glove that gives a constant current which develops heat from battery to glove through a circuit. The temperature is between 32 and 34 degrees.The problem with the existing circuit was to regulate the temperature. There is only on/off switch and there is no way to adjust desirable value of the temperature.In order to solve the problem the old circuit was investigated.

Framtidens Hus

The company Sol & Energiteknik wanted to examine the possibility to make a standardhouse totally energy independent. Based upon this I have, during the spring of 2007,examined the possibilities available at the market today through litterature studies, contactwith several companies and reading reports at the internet.The first thing to examine has been to determine the energy consumption for a standardhouse, and find out if there are better technologies to be used for energy conservation.My conclusion in this matter is that there are possibilities today for building a house moreenergy efficient.When I had reached the point at which my design for the house was decided, I also hadto choose the different products to use to produce energy as well as to store that energy.To produce heat and electricity to the house I decided to use a wind turbine and a solarwater heater.The most difficult part of designing a house that is energy independent is that theproduced energy must be stored somehow. Storing the heat is relatively easy beacuse theheat can be stored in a large water tank. The electricity is a bigger problem beacuse itmust be stored in batteries, which today are too expensive to be used in a standard house.In the future producing and storing hydrogen might be used to produce electricity, buttoday that technology is both expensive and not tested enough.My final conclusion is that a standard house can not be built to be totally energyindependent today, unless it is very expensive to connect the house to the electricitynetwork. As an alternative solution I came up with a proposal for a house which isconnected to the electricity network and have some amount of own produced energy.This house prooved to be a good investment if you choose to build it today, and it couldbe a very good investment in the long run beacuse energy prices increase every year..

Low Temperature Waste Heat Solutions : with proposals for energy technological actions based on Scania?s building 64

The report comprises two separate parts:part 1:  Temperature needs for district heating in the paint shop for axles in building 210part 2:  Energy and low temperature waste heat solutions in heating and cooling systems for   building 64 with surroundingsThe paint shop for axles in part 1 has air quality requirements in places for coating of axles. Toachieve desired air properties there are different process ventilation systems, which consist ofventilation coils for heating and cooling, plus air humidifier. The ventilations coils for heating usedistrict heating. Today the ventilation coils use water of 100°C to achieve necessary air demands inthe coating boxes. This part of the report investigates whether the existing system would achievethe air requirements with a water temperature of 75°C instead of 100°C in the ventilation coilsduring the coldest parts of the year.

Värmesystemsutveckling

In cooperate with Asko Cylinda we have developed a new heat system too short the process time and reduce the energy consume in a dishwasher and still have it too be a class AAA. The environment and quality is important for the company too still be the number one on the market, If they want too keep that position the product developed of new innovations will be very important. The systems we have developed are more effective and reduce energy up too 25 %. The process time is reduced too less than two hours, from the today two and half-hour. The solutions are too heat up the rinse water and the dishwater at the same time, with a new heating system and it make are solutions unique and effective. Its good for the dish and the environment.

Underlag för BREEAM-certifiering : Kristianstad Nya Galleria

The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.

Avvikelser i energiprestanda

Calculated and measured energy in residential buildings is going to differ. The reason to this may be due to many factors. In this study there is a study on how these factors affect the energy use in a building. To get an insight in what defines energy, there is first a description of energy supply both worldwide and used in Sweden, followed by a description of the energy balance. In this study energy will be studied in residential buildings only.

Vattenskydd och krisberedskap hos allmän dricksvattenproduktion : Skydd av täkter, tillgång till reservvattentäkter och andra nödvattenlösningar hos svenska vattenproducenter

The objective of this report was to analyse and compare vulnerability and preparation in Swedish municipal drinking water production, in case the commonly used water sources were inoperative. Methods used were a questionnaire and a less extensive study of regulations for water protection areas. The questionnaire was answered by 41 Swedish municipalities. A handful of them were companies co-owned by a few municipalities. Only one out of four municipalities had source protection areas to all their water sources and for many sources the protection was not satisfactory.

Bygga hus i traditionell härjedalsstil

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Energideklarationer - Marknad och Kundkytta

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Utredning av primärluftförvärmning till två avfallseldade pannor

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Driftoptimering av torkmaskin : Driftoptimering av torkmaskin 3 vid Billerudkorsnäs Karlsborg AB

The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.

<- Föregående sida 7 Nästa sida ->