Sökresultat:
34 Uppsatser om Ruby on Rails - Sida 2 av 3
FÖRBÄTTRAD MONTERING OCH DESIGNAV BAGAGELUCKA
This thesis includes a mechanical engineering design work performed incollaboration between ÅF and Halmstad University. The work is done by FredyOlsson?s methods of Principle- and Primary Construction and David Ullman?stheories of Design for Assembly.The group was commissioned by ÅF to produce a concept to narrow down theassembly time of today?s luggage doors by reducing the numbers of adjustmentoptions. They also wanted it to be easier to mount the assembly by making itpossible to adjust the door in a closed position. Today luggage door takes, with its10 adjustment possibilities, around 4 hours each to assemble and ÅF wanted anassembly time around 10 minutes per door.Initially a preliminary study was made where the group began reviewing today'sconstruction and mounting of rails and doors on buses.
Programmering till webben : Vad du ska utveckla din webbplats i för programmeringsspråk och varför?
This work is done to try to solve a scientific computer problem and its basis derived from the web, as there are a variety of ways to program to it. The most common languages used by developers, both private and corporate are PHP, .NET and Ruby. But why do companies or a private developer choose a specific programming language? Is it because it is better and has more features than the others, or because they are forced? This essay uses a questionnaire and through tests sees which is best and which one is the most popular/used. To illustrate the problem, a survey is conducted and sent to several companies and asked them to answer the questions regarding the issue.
Personsäkerhet vid väderskyddsbyggande : En kartläggning över dagsläget och problematiken med frånvaron av föreskrifter i branschen
This paper, Personal safety when working with weather encapsulation constructions, is focused on weather encapsulation constructions and how the absence of Swedish standards and regulations is affecting the safety for the workers. The usage of weather encapsulation construction is increasing in Sweden therefore the needs for standards and regulations are becoming more and more urgent. The risks involving the rising and the demolition of the weather encapsulation construction and when the construction is transported along its rails are treated in the paper. Since there are no regulations companies have had to solve the safety issues without instructions, the paper regards how the companies have solved this problem without the support of formal institutions..
Identifikation av produktionsstörningar och obalanser vid tillverkning av golvskenor
Our report procedure identification of instability and disturbance in an automatic manufacturing line of processing and assembling of chair sliding rails at Sapas manufacturing department in Vetlanda.To obtain a stabile ground we have mapped the material flow to receive a comprehensive view and to visualise connections.We have examined cycle times at different stations in purpose to identificate bottlenecks. The result of our examination showed that the bottleneck of the line was the brush station. This leads to that the expected bottlenecks identificated by Sapa gets a delay time and by that a longer cycle time.Interruptions has a clear negative influence at the line performance so we have also assemble data through the operators report list and compiled these in order to find out the interruptions effect on the line. The outcome during our assembled period was that the reported interruptions corresponded about 30 percent of the total available production time. This has a clear negative effect on the line productivity and efficiency as we have calculated in order to get the present status..
En analys av fem skriptspråk - Egenskaper och utveckling
SammanfattningSkriptspråk har under det senaste decenniet fått en ökad spridning, både gällande användare och gällande användningsområden. Från att huvudsakligen ha använts till enklare dagliga administratörsuppgifter används idag skriptspråken inom många områden där tidigare enbartsystemspråk var ett alternativ. Denna uppsats undersöker och granskar fem skriptspråk: PHP, Perl, Ruby, Tcl och PostScript. Målet är att undersöka språkens egenskaper och se på skillnader språken emellan. Vi jämför också skriptspråken mot systemspråket C, som dock inte granskas för sig.
Utveckling av publiceringsverktyg för hantering av webbplatser
I dagens samhälle finns det en stor variation på golv och golvmaterial. Till dessa finns det en stor variation av de produkter och metoder som används för att hålla dessa golv funktionsdugliga. Samtliga golv och produkter ger upphov till miljöpåverkan av olika storlek och sort.Denna studie är skriven på uppdrag av avdelningen för industriell miljöteknik, Institutionen för ekonomisk och industriell utveckling (IEI) Linköpings Universitet, som vill veta vilken miljöpåverkan Twister?-metoden har. Detta sker genom en livscykelanalys.En livscykelanalys ställer en produkt eller tjänst miljöpåverkan utifrån helhetsperspektiv innefattande materialframställning, tillverkning, användning och resthantering.
Utveckling av fastighetsmäklartjänsten : a Ruby-to-LLVM compiler prototype
The ability to tackle NP-hard problems has been greatly extended by the introduction of Metaheuristics (see Blum & Roli (2003)) for a summary of most Metaheuristics, general problem-independent optimisation algorithms extending the hill-climbing local search approach to escape local minima. One of these algorithms is Iterated Local Search (ILS) (Lourenco et al., 2002; Stützle, 1999a, p. 25ff), a recent easy to implement but powerful algorithm with results comparable or superior to other state-of-the-art methods for many combinatorial optimisation problems, among them the Traveling Salesman (TSP) and Quadratic Assignment Problem (QAP). ILS iteratively samples local minima by modifying the current local minimum and restartinga local search porcedure on this modified solution. This thesis will show how ILS can be implemented for MSA.
Regeringens transportinfrastruktursatsningar : En studie av tågtrafikens utrymme i regeringsanslagen för transportsektorn
In the government's bill on infrastructure for 2010-2021, the government presents that road investments should be prioritized before investments in the railway. The grants for operation and maintenance of the railways are much higher then in the last government's bill. Furthermore the current founding of investment in railways is higher then for road investment which is in opposite of the bill on infrastructure's directives. Therefore the purpose with my thesis is to find which factors that can explain how come the government has chosen to take these actions. As a model to help me achieve my purpose I have been using a modified version of the DBO-theory, where the basic factors to explain an action is Desire, Belief and Opportunities.
Byggkostnader inom mjölkproduktionen - jämförelse av olika stallstorlekar och byggnadstekniska utföranden
Investment costs for eight different type housing systems for dairy cows has been calculated in order to compare the building costs as a function of herd size, shelter type and automatization. A commercial calculation programme for building was used and complemented with prices of equipments specific for dairy cow building.
Herd sizes were 120, 250 and 400 cows. The milking equipments were automatic milking system (AMS), parallel parlour with 32 stalls (2x16) and rotary parlour with 24 stalls. Shelter was either insulated equipped with automatic cable driven scrapers on solid alleys, automatic feed wagon on rails, or uninsulated with manual manure handling and a tractor driven mobile mixer wagon on a drive-through feeding table.
Building cost per cow or per kg milk was calculated using an average life time and 6 % interest rate and annual milk yield is 9 500 kg/cow and year.
Structure effect 3-4 % higher for an insulated structure than in an uninsulated for 400 and 120 herd respectively. This is much lower compared to what is normally argued.
Mekanisering av häststall
Mechanization of Swedish agriculture started in the beginning of the twentieth century, to be able to have more animals without raising the number of employers. The horse business has not by far kept up with these cost savings solutions. Cleaning out stables and feeding horses are the most time-consuming tasks in horse stables today. The most common way to clean out the stable is still by shovel and wheelbarrow. The clean out process can easily be mechanized through semi- permanently beds with movable walls between the boxes so that the litter can be removed by a tractor or a loader.
Helandet av Stockholms sår : En analys av projektet Västra City
Over the years, what people have considered as the center of Stockholm City has gone from the medieval Stortorget in Old Town to the contemporary Sergels Torg. But more recently it has become unclear how the area really works. It is difficult to say where the actual central part of Stockholm lies, because while the Central Station is where the majority of people arrive into town, it is not necessarily close to Sergelstorg (considered the center of town) or other attractive commercial areas. There's also another issue with where the center of Stockholm is located. The railways and roads running along Klarabergs Viaduct acts as a divide between the areas of Kungsholmen and Norrmalm; these rails, roads and water separate the two areas from each other. In response to this problem of area division, a plan is being made to construct a new district near the center to mend the gap between the districts. The idea is that the center of Stockholm city will become more lively and attractive. The plan includes building new housing, commercial areas and a larger terrace called Mälarterrassen. In addition, improved mobility within the area is being planned by having better public transportation lines like City banan and tram named Spårväg City construction, as well as more pedestrian areas shall make the area become a district to thrive in.How the area will actually operate in the future is still unclear and many questions still exist about how the area will be able to compete and, above all, integrate with the other districts. The parts considered to be most important for the area is the scale of residential property and an attractive area that keeps people in the area and to encourages them to pass through the area. Perhaps the best solution would be to have something special planned in this area that can attract people in the community ? a city park, for example?.
Vägghängd duschpall : Utveckling av duschpall för Etac Supply Center AB
This degree project has been carried out by Oscar Adolfsson and Marcus Blomqvist, during the spring of 2010, both studying to become Bachelor of Science in Innovation and Design Engineering, at Karlstad University. The degree project includes 22,5 credits.The work is done on behalf of Etac Supply Center AB in Anderstorp. Etac is a company developing and manufacturing home health care products, with operation in Sweden, Norway, Denmark, England and Germany, and with sales worldwide. Bo Lindqvist, R & D manager has been the contact person at Etac.During the project the students has had a workplace at Semcon Caran AB in Karlstad. Semcon has also been helpful as a sounding board.The objective of the work has been developing a new, wall mounted shower chair, assigned for persons with difficulty to stand up while showering.Etacs requirement of the shower chair is that it should be able to support a user with a weight of 100 kg, the chair shouldn?t have any outrigger, optional should be armrests and backrest.
När tågen slutat gå : förvandling av övergiven räls till publikt promenad- och parkstråk
Abandoned and unused railway structures often possess
great potential if they are reclaimed and reused for new
purposes. The thesis focuses on the global trend of
restoring and revitalizing these areas, converting them
into park areas, rail trails and green corridors in the city
landscape, while preserving their ecological, social, esthetic and historic values.
These rail areas were often abandoned when industries
moved out from the cities, either to industrial areas or
abroad. The use of railways for transporting industrial
goods was also replaced to a large extent my motorized
road vehicles in the mid 20th century, leaving the rails
under-utilized. Because of their location and intrinsic
values, they can be reused for important functions, such
as green areas in the city environment, providing space for
recreational activities and exercise and social meetings and
interactions.
I have closely investigated the three park areas High Line in New York, Promenade Plantée in Paris and Schöneberger
Südgelände in Berlin, which have all gone through this
transformation in recent years. I have summarized my
conclusions in three key concepts to consider: design for
social values, preserve the architectural history, and leave
room for future evolution.
The final part of my work is a design program for an
abandoned railways area in Stockholm: Eriksdal railway
area.
Spridning av bekämpningsmedel i banvall : Modellutveckling och känslighetsanalys
The stability of railway embankment is essential for safe transport. In order to ensure safe transport, water should be allowed to freely drain. Furthermore, as the engine driver has to be able to see signs, and people working on the embankment are supposed to easily see flaws on the rails to ensure safety for the passing trains, plants should not be allowed to grow on the embankment. In Sweden there are 12 000 kilometers of railway tracks and 25?30 % of them are treated for weed control every year.
Reglering av turbins ledskenor i vattenkraftverkmed hjälp av elektriska ställdon
Hydropower is the largest renewable energy source available in today's society. Operation and production is handled by high-tech electronics. This thesis is done on behalf of Statkraft Sweden AB who wants to explore the possibility of replacing the hydraulic cylinder with an electric actuator, generally as well as a case of a small power station on the river Nissan. Whether it is the chaplain or francis turbine vanes are actuated by hydraulic cylinders. Because of Gustavsberg hydropower is inconstant operation, this report is based on power calculations, which are read and computed according to the available hydraulic diagram.