Sökresultat:
1114 Uppsatser om Road improvement - Sida 6 av 75
En jämförande studie av fem lastbilsmonterade flishuggar
The study was carried out as a time study of five wood chippers placed on trucks,so?called huggbilar. They are trucks with built?in wood chipper, chip bowl and crane pulling a chip trailer. The system is used for chipping wood fuel, transporting, and delivering the chips to heating plants.
Ständiga förbättringar i lagerverksamhet på Nedis AB
The thesis has been carried out at Nedis AB in Jönköping. The aim was to develop proposals on approaches that could help the company to continually improve their warehouse operations by eliminating unnecessary operations, making the warehouse more structured and how they better could use the staff's suggestions for improve-ment. The collection of data consists of observations, interviews with a total of nine people from the staff of Nedis AB and a benchmarking conducted at Husqvarna AB. A number of shortcomings and weaknesses in procedures at the warehouse were iden-tified. Packing stations were not standardized and they were seen as poorly structured and messy.
Utformning av sidoområden med hänsyn till vägens livscykelkostnad
Single vehicle accidents are one of the most common types of accidents that occur on the Swedish road network. Depending on the design of the road, the presence of a crash barrier and embankment on the roadside, the outcome of a roadside collision can lead to serious injuries and even deaths.The aim of this project is to investigate the possibility of improving road safety by designing the optimal roadside area based on the results of a life cycle cost analysis (LCC).The questions that have been answered during the duration of this project are:1) Describe the current technical solutions for roadside area design and the various barrier types used in Sweden.2) Complete an existing mathematical model that has been developed by Hawzheen Karim, for calculating life-cycle costs for various roadside areas.3) Calculate and compare the life cycle costs for the side area with a barrier and without a barrier.By performing an analysis of the documentation on the current guidelines and rules for shaping the roadside, was it possible to describe the current technical solutions for the formation the roadside as well as the current roadside barriers in use today. A mathematical model for calculating the life cycle costs of different barrier types had already been developed by Hawzheen Karim. This model was supplemented so that it could calculate life-cycle costs of the roadside region with and without a barrier. After the model was completed, an analysis was performed to obtain life-cycle costs of a roadside with and without a barrier.The result showed that there is a clear relationship between the slope inclination, fill height, and the rate at which the costs rise.
Systematiskt förbättringsarbete : En fallstudie vid Parker Hannifin Corporation, QCDEurope, Tema Ingenjörsfirman AB
Background and aim: Organizations must be able to manage change in order to survive in today?s competitive society. To continue to develop and reach better results is fundamental. Case Company Parker Hannifin Corporation, Quick Coupling Division Europe, Tema Ingenjörsfirman AB, Skövde has an ambition to have an organization that manage changes and continuously improve its performance. That is the reason why this examination work arises.
Value stream mapping i praktiken : En fallstudie på Light My Fire
Titel: Value stream mapping in practice ? A case study at Light MyFireAuthors: David Rydman and Tomas ÖnnemarMentor: Veronica Ülgen SvenssonExaminer: Åsa GustafssonBackground: Companies push their prices in today's markets to be competitive, which means that companies need to find ways to reduce costs while maintaining profits. (Cudney, 2009) According to Bergman and Klefsjö 2007, the basic rule of quality improvement says "there is always a way to achieve higher quality at a lower cost". One way is to improve a company's processes to get a more efficient flow and improvements that may cut costs. (Bergman & Klefsjö, 2007) Why it's important to look at the processes are that they often contain waste that can be eliminated.
Vindskador vid stickväg i 1:a och 2:a gallring i Boxholm, Östergötland : i stormen Pers fotspår
Wind damages next to strip roads in 1st and 2nd thinning in Boxholm, Östergötland
Anneli Fransson, SLU, inst f sydsvensk skogsvetenskap, Examensarbete no 108
Wind damage is something we are all familiar with since the storms Gudrun (2005) and Per (2007). Research about strip roads and wind damage is very limited. It is commonly known that the trees next to the strip roads more often fall whit heavy winds, and the purpose of this thesis was to verify this statement. Data was collected from first- and second thinnings at Boxholms Skogar AB, Östergötland. In first thinnings data was collected from both spruce and pine stands and second thinnings only data from spruce stands was collected.
Att umgås eller inte umgås, det är frågan! : Socialt umgänge och utveckling hos människor med psykosdiagnos
Background: A common view about people with diagnosed psychosis is that they are socially withdrawn and that they neither cope nor want to engage in social relationships. Newly published specialist books on this subject also support this view.Aims: To unveil further dimensions of the phenomena by explorative analyzing consumers? own depictions about their ?social relationships".Method: The material is taken from a larger study that followed consumers regularly during a lapse of 3 years. Within this material 15 interviews from three respondents were chosen, a selection which gives maximal spreading concerning age, sex and background. The interviews where analyzed by methods based on Grounded Theory.Results: Three main dimensions were identified: supportive relationships, difficulties and social withdrawal.
Effektiv betong för småhusproduktion : Betong med högt luftinnehåll för platta på mark
This Masters thesis work describes a comparison between two different methods for estimation of the down channel (base station to mobile subscriber) in Wide-band Code Division Multiple Access (WCDMA). The first estimation method, Optimal Feed-forward Channel Estimation (OFCE), is a conventional method that bases the estimates on data that is known to both sender and receiver, so called pilots. The second method, Decision Directed Channel Estimation (DDCE), is an elaboration of OFCE. It also uses user data for estimation. Simulations show that DDCE, in comparison to OFCE, does not attain an improvement in signal-to-noise-ratio (SNR) for high bit error rates (BER).
Ständiga förbättringar inom verksamhetsprocesser : en studie mellan läkemedel- och kärnkraftindustri
The purpose of thesis was to investigate and compare how two companies within pharmaceutical industry and nuclear power industry are currently working with quality development regarding continuous improvement and Lessons Learned in business processes. In addition, a simple comparison was made with the automotiveindustry.McNeil AB are improving their processes continuously and are according to the findings of this report performing well in their pursuit of world-class pharmaceutical production. They have a well functioning process regarding improvements proposed in weekly improvement meetings engaging all employees. However, during interviews it was made clear that the functionality of the process which administer improvement proposals generated in addition to, or beside the weekly improvement meetings, were inadequate. McNeil AB is proposed to administer this through an IT solution instead of by paper and e-mail, that simplifies the process of adding, implementing and follow up an improvement proposal.The nuclear power plant Ringhals AB recently made major improvements in their business processes as well as the plant itself.
Riskbedömning och riskhantering i samband med vägbyggen
The aim with this thesis is to investigate the risk management at the department Road construction, The National Road Administration Region Mälardalen. The aim is also to study how the risk management could be improved to better support the project leaders. Included in theses aims is to examine potential problems with the current risk management and to suggest changes. It is of utter importance to define the concept of risk, to study how risk can be measured and in which ways risk can be analyzed. In doing so, a literary study has be done and fourteen respondents has been interviewed.Risk is to be seen more as a concept than a quantity.
Uppföljning av system för vägentreprenörer i skogen
Holmen Skog is one of the largest forestry companies in Scandinavia and they depend heavily on a large network of forest roads for production and logistics in connection to their forestry operations. The company recently introduced a new system for planning of road management. The system will also be developed with the intention to facilitate the monitoring of actions performed by road contractors. This report will provide information to support future decisions regarding further development of the system, after its introduction. In addition to a presentation of results from interviews, the report also provides a smaller study of the different subjects associated with roads, process work and process development.
The study is largely based on interviews with road contractors that perform work for Holmen Skog today.
Koppling av vägdata till vägtrafikolyckor lagrade i STRADA
Available as pdf.
Geosynteter för hållbara vägar : Modell för jämförelse av vägöverbyggnader med eller utan geotextiler och/eller geonät
The different material layers as part of a road construction fill all a function so theroad becomes durable, safe, comfortable and aesthetically pleasing. Recently, anew group of construction materials started to play an important role in roadconstruction ? geosynthetics.This thesis addresses the two most common types ofgeosynthetics used in modern road construction, namely geogrids and geotextiles.The most common use of geogrids is reinforcement of poor subgrade by usinggeogrid soil reinforcement, which occurs when road material particles wedge inthe geogrid?s mesh. Geotextiles act partly as a barrier that prevents the finermaterial in the below ground from being mixed with coarser upper material andalso act as a load spreader.Road contractors often face a choice of whether geogrids and/or geotextiles areappropriate in a particular road project and also how much profit the choice mightbring. This phase in the tender calculation process is the intended scope of thisthesis.The thesis deals with both the "hard" cost-function aspects and the "softer" values e.g.
Skotares bränsleförbrukning :
In published studies it is found that the fuel consumption on a forwarder is relatively constant, on time basis. A certain variation between different sizes of forwarders occurs as well as between different working elements.
The aim of the study was to establish a forwarders comparatively fuel consumption when driving on road and in the terrain, loaded and unloaded, with high and low gear and with high and low speed as well as with hydrostatic and hydrodynamic transmission. A hypothesis was that low rpm gives lower fuel consumption on distance basic, at all trials.
The test driving was made with a Hemek 750 which is a three geared hydrostatic machine and with a Hemek 700 which is a hydrodynamic machine with six gears.