Sök:

Sökresultat:

273 Uppsatser om Retained voltage - Sida 10 av 19

Kartläggning av nätförlusternas storlek inom Mälarenergis elnät

Energy losses are an essential part of a power grid company?s costs. From anenvironmental and economic perspective, it is important to reduce these costs. Toknow where efforts should be deployed, it is important to have good knowledge ofwhere in the network losses are situated. When creating network tariffs, there is alsonecessary to have a correct distribution such that the network customers that use acertain part of the network, only pays for the network losses in this area.

Stabilitetsberäkningar och åtgärdsförslag vid islast på Skålandammen

Hydropower is an important source of energy in Sweden and accounts for about 46 % of the total energy production. Sweden has about 1 200 hydropower plants and with the intention of raising the pressure head of the water and to store water, dams are built by the power plants. The storage reservoirs make it possible to adjust the energy production by demand and season. Dams in connection to the reservoirs are subjected to additional loading during periods of high floods or when an icecap in the winter is formed on the reservoirs. In order to maintain the dam safety, the power companies in Sweden are working with guidelines for dam safety from RIDAS.

Dämplindningens inverkan på spänningens kurvform i en vattenkraftsgenerator

Harmonics are a well-known problem that has to be dealt with in the design of thegenerator. Internationally accepted standards limits the amount of harmonics allowedin the no-load voltage. These limits can be difficult to fulfill with integral slot winding,where the number of slots per pole and phase is an integer. The presence of thedamper winding often makes the problem with harmonics even worse and harmonicswith frequencies of order 6q±1 arise with significant amplitude. How the damperwinding is designed affect the content of harmonics in the no-load voltage and the aimwith these ? has been to investigate in which extent design of the damper windingaffects the contents of harmonics.Simulations with the 2-D finite element method have showed that if the damper barsis centered in the pole shoe, the amplitude of the harmonics of order 6q±1dependsboth on the ratio between the stator slot pitch and damper bars slot pitch and if thedamper bars are connected between the poles or not.If the damper bars is displaced with ¼ stator slot pitch alternately, the amplitude ofthe harmonics of order 6q±1 is reduced and the influence of the ratio between thestator slot pitch and the damper bars slot pitch will vanish.

Analys av mätdata från nätstationer

Fortum has in a pilot project installed metering equipment with wireless communication in secondary substations in Stockholm. So far, the collected data are used only in specific projects.This master thesis was carried out at Fortum Distribution AB in Stockholm during 2013. The purpose of this study is to simplify and enhance the use of data in for example network planning process, by giving suggestions on how data can be managed and giving examples of analyzes that collected data can be used for.The electricity meter which Fortum has installed is a EDMI-Mk10A which is set to measure max/average/min values with a one hour time resolution of the following parameters: voltage (per phase), current (per phase) andactive power and active and reactive energy.In order to analyze the collected data an analysis tool is required. During this thesis two customized tools in Microsoft Excel have been developed, one for sorting data and one for analyzing.One aim of the thesis is to show examples of what collected measurement data can be used for. This work shows an example of analysis of active power, power factor, voltage, occurrence of interrupts and the relationship between outdoor temperature and power.This master thesis has among others resulted in the following advice: Expand the number of secondary substations with measuring equipment.

Analys av spänningsstabilitetsberäkningar i det svenska elsystemet

Numerical simulations play a vital role in both static and dynamic stability assessment of electric power systems and the foreseeing of voltage collapse. Simulations performed by Svenska Kraftnät(SvK) are mainly done in the specialized voltage collapse predicting software tool, SPICA and the more all?purpose software tool, ARISTO.The grid operators at SvK use SPICA to predict the maximum transfer limit at specified sections (in this report the section in concerns is the southern part of Sweden i.e. interface1 4). SPICA is mainly used as an online application by using actual states from the grid, these states update every quarter of an hour.This thesis is a continuation of the master thesis SPICA ? ARISTO JÄMFÖRELSE by Jakob Katzman and Johan Fält.

Utvärdering av laddningskoncept för lastbilsbatterier

When drivers overnight in the truck lots of electric energy is consumed by heaters, fans, lights and other extra equipment. If the engine is not running, this energy is taken from the lead/acid batteries of the truck which then needs to be recharged during operating hours. The fact that the charge acceptance of the lead/acid batteries is dependent on the temperature makes it hard to fully recharge the batteries at lower temperatures. A negative charge balance can lead to starting problems within a few days use in cold climate.In this thesis work, the effects of different battery charging concept are evaluated on the most common Scania battery (175Ah). A battery model is implemented in Matlab and some simulations of charging are made.

Åsktransienter och överspänningar : En spänningsfylld simulering av elkraftsystemet vid Forsmark 3

A power system will inevitably be subjected to transient overvoltages, most often produced by switching operations and lightning strikes. These transient overvoltages may harm sensitive equipment without sufficient protection, but it is not an easy task to predict what transients may occur or how they affect the system. A fault occurred in a low voltage system at Forsmark 2012 and overvoltages from lightning were concluded as the probable cause. The three aims with this thesis are to develop and test a model of the power system at Forsmark 3, analyse the transient behaviour of the system when subjected to lightning surges and identify critical parameters, and lastly to provide a tool for investigating the protection of the system. The modelling and simulations were performed in the freely available simulation program LT Spice.

Analys av fördelningssystem för bostadshus

The purpose of this project is to analyze earthing systems for houses. By practical measurements and theoretical analyzes consequences of possible faults, that can occur within the facility and in the low-voltage distribution network, is illustrated.  The reason for this project is that nowadays one has to arrange with a main equipotential bonding system for buildings. Apart from that, if necessary, bathrooms must be provided with a supplementary equipotential bonding system.The practical measurements verify that potential differences in facilities may be due to voltage drops in the PEN conductor between the origin of the electrical installation and the power transformer.Based on the theoretical analyzes of possible faults, it is considered that the requirement for  supplementary equipotential bonding systems for bathrooms in most cases can be questioned, when basic insulation, fault protection, residual current devise and main equipotential bonding system already provides an adequate level of protection.A PEN conductor loss may result in a situation where metallic parts attached to the equipotential bonding system starts working as earth electrodes. Equipotential bonding system may also increase the incidence of stray currents. If TN-C-S systems is provided with a local connection to earth a redundant system against PEN conductor loss is obtained.

Trafikverkets effektstyrningssystem - EFS 132 kV : Bidraget till minskade förluster

The technological legacy from the early electrification of the Swedish railroads has resulted in a power grid with a lower grid frequency than the national power grid from which it is fed. Energy transfer between these power grids with different frequencies requires substations, adapting the grid frequency for the rail road power grid. For this purpose, a feeding power grid has been built, stretching across the country from Boden in the north to Tälle/Häggvik in the south.Power transfer in the Swedish power grid results in voltage angle differences which increase with increasing loads and transfer distance. These voltage angle differences are transferred from the power feeding substations to the rail road power grid, will in some extent cause loss of energy due to unwanted power flows from north to south.To minimize the losses due to this phenomenon, a power management system called EFS 132 kV has been developed and implemented. The system minimizes the unwanted power flows and controls the desired power flow for a good distribution of loads between the power feeding substations.This thesis investigates the extent of the transmission losses avoided due to the EFS 132 kV that coordinates the idling angles to a common reference point.The results indicate that EFS 132 kV affects the power flow, especially between the northern substations through an improved load distribution.

Analys av PWM-mönster i Matlab

One of ABB Power Systems´s business areas is HVDC (High Voltage Direct Current) technology. HVDC is used for transmissions for both short and long distances. One of Power Systems?s products is called HVDC Light. HVDC Light is a relatively new technology for power transmission, but have before only been used for motor drives applications.

VSM och 16 förluster

With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.

Dimensionering av hjälptransformator

The aims of the following project has beento make a proposition how to create aspecific kind of transformer. Thefollowing report evaluates the differentimportant variables and contains asuggestion for a possible design. Intheory it's an ordinary transformer that'ssuppose to transform electrical effect toa high voltage line. The design of thetransformer is using an already existingcurrent transformer design and is adjustedto work for it's specific purpose. Theproject also contains the developing of atransformer simulation model that will beused to evaluate and optimize thedimensions of the resulting transformer..

?Knowing what is going on? : -Tågförares upplevelser av ERTMS

The aims of the following project has beento make a proposition how to create aspecific kind of transformer. Thefollowing report evaluates the differentimportant variables and contains asuggestion for a possible design. Intheory it's an ordinary transformer that'ssuppose to transform electrical effect toa high voltage line. The design of thetransformer is using an already existingcurrent transformer design and is adjustedto work for it's specific purpose. Theproject also contains the developing of atransformer simulation model that will beused to evaluate and optimize thedimensions of the resulting transformer..

Konstruktion av current conveyors via makromodellering

A current conveyor is an active building block that can be used to implement most active and passive components. It differs from the operation amplifier in that it uses current instead of voltage. The current conveyor also has significantly higher voltage gain over a broader frequency range. To simplify the construction of analogue circuits and increase the construction efficiency it is desirable to use a top-down methodology. This means that the whole system is partitioned into a hierarchy of subsystems.

Simulering av vindkraftverk och närliggande elnät vid Risholmen i Göteborg i SimPowerSystems

With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.

<- Föregående sida 10 Nästa sida ->