Sökresultat:
1880 Uppsatser om Real Ear Measurement - Sida 22 av 126
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Systematiskt arbetsmiljöarbete : Autoliv Sverige AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Förbättring av värmeugn : Bottenförseglare för Tetra Pak's Gable Top förpackningar
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Utveckling av priset på bostäder i Kina
Under de senaste 30 åren har Kinas ekonomi utvecklats snabbt, vilket hänger väl ihop med landets fastighetsutveckling. Sedan den marknadsinriktade bostadsreformen 1998 har Kinas bostadsmarknad haft en snabb tillväxt med en kraftig prisökning under de senaste fem, sex åren. Denna uppsats har syftet att undersöka de kinesiska bostadsprisernas utveckling och utforska de faktorer som drivit bostädernas prisutveckling. Med insamlade årliga data från Kinas National Bureau of Statistics för perioden 1995-2010 genomfördes grafiska analyser och ekonometriska analyser. Studiens grafiska resultat visar att bostadspriset har en stabil utveckling under perioden 1995-2004.
Flödesplanering för nya artiklar vid Lear Corporation i Färgeland
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Spillmätning i konverteringen på SCA Hygiene Products
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Strategier hos de stora svenska byggföretagen 1992-2006
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Konstruktion av spoltorn för höj- och sänkbar överkorg till diskmaskin
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Undersökning av förskolan Temmelburken certifierad enligt Miljöbyggnad : Termiskt klimat, energianvändning och höjning av certifieringsnivån
WSP building physics in Stockholm has certified the preschool Temmelburken in Bromma with the system of certification Miljöbyggnad. The rating of the building became BRONZE. In this thesis the preschool has been investigated with respect to the three areas: thermal climate, use of energy and improving of the level of certification. The thermal climate at the preschool has been investigated by a questionnaire survey and by measurements in order to do comparisons between the results from the two investigations as well as with the results of the simulations that WSP has done at the certification of the preschool. The differences between the results from the simulations and the questionnaire survey for winter as well as from the measurement performed with a comfort meter the 19th of March are concidered to be reasonably small since they give rise to the same rating according to Miljöbyggnad. Operational data for the use of energy for the preschool have been obtained in order to do comparisons with simulations performed by WSP and Svenska Besiktningar AB. The comparison shows that the simulated values for the specific use of energy are lower than what the real specific use of energy would be for the preschool, since just the operational data for the heat energy is higher than the simulated values. At the investigation of the possibility of improving the level of certification it was found that the rating of the preschool can be raised from BRONZE to SILVER by improving the ratings of the ?thermal climate summer? and the ?daylight?.
Att mäta effektivitet i utvecklingsarbete : En kartläggning av förutsättningarna på Saab Aerosystems
Ökad kunskap och kännedom om sin organisations prestanda är något som alla företag eftersträvar. Att kunna prediktera vilka resurser ett utvecklingsarbete kräver är en förutsättning för att kunna genomföra ett bra offertarbete. Dessutom krävs prestandakännedom för att kunna sätta mål för det interna målstyrningsarbetet. Kännedomen uppnås genom ett etablerat mätsystem, som innefattar insamlande och användande av mätdata, det är inom detta område som vårat examensarbete har sitt fokus. Närmare bestämt belyses framgångsfaktorer vid implementationen samt hur användandet av mätdata bör gå till.