4398 Uppsatser om Project efficiency - Sida 2 av 294

RETURHANTERINGSPROCESS EN KARTLÄGGNING AV YVES ROCHERS RETURHANTERINGSPROCESS

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

Ledningssystem för trafiksäkerhet- lokalisering av framgångsfaktorer förspridning av ledningssystemetISO 39001

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

Flödeskartläggning avbilflödenpå Södertälje Hamn(Car-flow mapping at the Port of Södertälje)

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

Peltierelement - spillvärme till el : Peltier element - waste heat into electricity

The purpose of this thesis has been to determine experimentally how good a peltierelement is to convert waste heat from wood burning. Three different peltier elementswere used in a comparison study. The comparison was mainly done to know howmuch power could be obtained from each element. Even, a circuit with a step-upfunction has been created to give a higher output voltage than the peltier elementitself. The result of the experiments was a low output power, the highest valuereached 2.18W.

Nu jagar de papperslösa : En kvalitativ diskursanalys om massmedias framställning av Reva-projektet och polisens arbete

The purpose of this essay, ?Now they are chasing paper-less - A qualitative discourse analysis of mass medias depiction of the Reva-project and the work of the police?, is to analyze how mass media portrays the Reva-project and polices work with the project. The basis for the essay will be eight selected newspapers. The Reva-project implies collaboration between the Police, the Swedish Migration board and the Swedish Prison and Probation Service within the border police. The aim of the project is to enhance the efficiency and the execution of the border police work, in accordance with the government?s target.

Styrkan i OEE som arbetsmetod

The E-department at GETRAG All Wheel Drive in Köping have problems with the efficiency on parts of their production equipment. The equipment with the most significant efficiency problems are four automated multifunctional production cells that produces housing for rear drive units. The major part of the problem is the large amount of small stops that causes the low efficiency.The department already worked with logging of interruptions and efficiency calculations before this project started. However this work was not done to the extent considered necessary for a systematic follow-up of the interruptions.The aim of this paper is to point out a more effective and systematic way to work with logging of interruptions and the follow-up. In addition the equipment were studied with a method for efficiency calculation that ? if used properly- is a more powerful and a visually better method than the one used by the company today.As the initial current state analysis of the equipment was made a lack of documented knowledge about the equipment was discovered.

Energieffektivisering av bostäder : En analys av åtgärder som kan förbättra energiprestandan i flerbostadshus

Efficient energy use in the housing sector is crucial for achieving a sustainable society. The expansion of this sector only represents a fraction of the existing houses, hence it?s within the existing houses the potential for energy savings lie. This potential has been analyzed in order to determine if it?s possible to cut the current energy demand in half.

Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv

This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit. The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes. The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process.

Hemautomation : Spara energi genom att automatisera hemmet

In today's society there is a significant focus on energy efficiency. Despite this, people leave lamps, televisions and computer screens etc. powered on unnecessarily. The goal of this project is to build a simple prototype for home automation where a user, via an application on a mobile phone, can switch on and off the power of an electrical products in the home and as well as being able to check whether such products are switched on or off. The prototype will also collect data on power consumption for these electrical products.

Optimering av projektering i byggbranschen

I varje projekt finns det brister i kommunikation som kan leda till att kostnad, tid och kvalitét påverkas. Varje projekt är en tillfällig organisation med olika företag och olika personer med varierande erfarenheter inom projektering. Detta medför att varje projekt är i sig unikt och hur alla ska kommunicera med varandra kan vara stora frågetecken under projekteringens förlopp. Denna rapport tittar närmare på vilka brister och svårigheter som kan uppkomma i projekteringskedet..

Produktionsanalys på Efterbehandling

Arvika Smide is a supplier to the automotive industry with a focus on advanced drop forgings including powertrain and bearings. The great experience and high quality is Arvika Smide?s speciality. Today's competition in the industries puts high demands on the efficiency where each company has a quest for perfection.Arvika Smide has been through the thesis of Karlstad University, called for a situation analysis of aftertreatment whose effectiveness has not been fully desirable. The department includes the production steps blasting, quality control and packaging.The thesis contains the results from the situation analysis and comparisons of the calculations for selected reference period Q4 2009th.

SFINX ett integrationsprojekt : ur deltagarnas perspektiv

 Abstract This paper is to examine a specific integration projects by the name of SFINX, the participants' perspective. We chose to highlight three themes that concern the analysis what the participants thought about the content / efficacy, effectiveness and efficiency analysis, which means what the participants thought could be improved in the project. What emerged in our study is that research shows that Swedish education with professional orientation and integrated practice is a key factor for migrants to get into the Swedish labor market. And that Sfx teaching has been implemented in several places with good results. SFINX is also a Sfx project but is addressed to engineers.

Projektledares motivation och metod : Med utgångspunkt från Vrooms förväntansteori

In today?s changing environment, creation of projects by organizations has become more common. The problem is, though, that the knowledge of the subject is still limited which causes many projects to fail. This has made it extra important to have a good project manager whocanlead the project in the right direction. While doing this both the project method and the project manager?s motivation are contributing sources.

Organisatorisk kunskapshantering : En fallstudie hos Polisens verksamhetsstöd

This report deals with the theory and empirical evidence of how knowledge generated within a project is to be captured and shared with other projects and the surrounding organization, after the end of a project. A number of authors have highlighted knowledge management within a company as a key component in building a unique competitive advantage and knowledge should therefore be considered a very important resource within companies. The difficulties of ensuring that knowledge generated within a project can benefit other projects are many. The nature of the project form has been highlighted as one of the biggest problems, due to the fact that budget and time requirements often restrict the propensity to work with knowledge transfer. Other difficulties that this report highlights are in particular the lack of a knowledge sharing culture within the organizations, as well as human cognitive and psychological limitations and lack of tools design for knowledge transfer.

Viktiga faktorer för Kommunikations- och Informationsflöden inom projekt

  iiiAbstract?We are living in a time of project. Everything becomes project. All development, all efficient,all changes are running as project?.