Sökresultat:
10752 Uppsatser om Production system - Sida 2 av 717
Kundutredning av deltagande företag i IndustriForums Lean krAft utbildning 2005-2006
This essay is an enquiry about how companies as participated in a Lean pro¬duction education use this education. The essay describes also how one works with the implementation of Lean production and how they believe that they will work. The enquiry tries to create an advisory material for other companies that are in the beginning of implementing their own Lean Production systems. There these companies? gets a picture of how other companies have done during their try to create a functioning Lean Production system.
Integrering av pelletsfabrik med Rya kraftvärmeverk i Göteborg : en teknisk och ekonomisk utredning
Göteborg Energi has a surplus of district heating during spring, summer and fall. The heat surplus is due to a constant production of waste heat from oil refineries and heat from waste incineration over the year. It would be desirable to increase the demand for heat and the uptime for the newly built combined heat and power generation plant, Rya Kraftvärmeverk. One alternative could be to integrate Rya Kraftvärmeverk with a pellet production facility. By producing heat, electricity and pellet in a joint process the energy use can be decreased.
Studie av planerings- och produktionsprocess i sågverksbranschen
The sawmill industry is a relative fragmented industry that is in an economic upswing andwith a hard competition. The customers have high demands on their suppliers and the highcustomer demand make it necessary for the companies to make a streamlining in planningand production. For that reason it is very important that the planning- and productionprocesses aren?t to complex and with a simple structure.The purpose of this report is to study and map out a marked out part of a planning- andproduction process, from adjust works to final delivery, at a company in the sawmill industry.Different methods have been used for the report, among others interviews and subordinatedmaterial.We have mapped out a marked out part of the planning- and production process at theCompany. This part we have studied, and we have analysed the process it self and otherthings connected to the process.We see the planning- and production process in the Company as complex.
Produktionsavbrott - förekommer det effekter att lära av?
A large part of the time losses in production in modern manufacturing industry are a cause of unplanned interruptions in production. In this essay we have studied the effects of an unplanned interruption in production. The study was performed during one month on a press production line at Volvo Cars Body Components (VCBC) in Olofström. The effects of the interruptions have been studied on the basis of two perspectives of the environment of the production. The study started at the level of automation and was mainly done as a survey of the unplanned interruptions in production.
Lean i arbetsprocessen för projekledning
This report presents the results of a thesis in which the department PL Hus at Grontmij AB isstudied. The study has been done in order to locate problem areas in order to streamline andimprove the quality of working. The study was done by an engineering student from theDepartment of Industrial Management at KTH on behalf of Grontmij AB. The project extendedover a period of 20 weeks during spring 2011.In addition to the Department itself has two project managers in two different projects beenfollowed. The method used has been participant observation and was used to be able to comeclose to reality and thus find problem areas where there are opportunities for development.Validation was made through comments and opinions from workers at Grontmij AB, afterreading the reports analysis.Based on a system and holistic approach has parallels been drawn to the Production systems suchas TPS (Toyota Production system) and lean production.
Svensk plantskoleproduktion 2003 :
This work consists of two studies. One is based on an inquiery to nurseries with production of woody plants, and the other on visits to gardencenters, primarily in Skåne but also in Stockholm.
Inquieries where sent to 87 nurseries, 48 of them replied. The purpous of the inquiery was to make a thorough investigation of the ligneous production at the Swedish nurseries, what is produced and in what quantities. Within the inquiery was also a thorough look at the fruit tree production. This to be able to conclude what cultivars that are produced and how large part of that production that is certified according to the Swedish Board of Agriculture (SJV).
Kalkyler i vården: en översikt och ett praktikfall
This thesis investigates management accounting systems in a Swedish health care environment. Through a qualitative case study of an activity-based cost accounting system that was introduced in 1994 at S:t Görans Sjukhus, a large Stockholm hospital, the following questions are addressed: What benefits can an activity-based cost accounting system offer the Swedish health care providers? What are the potential problems impeding the implementation of such a system? Main findings: an activity-based cost accounting system can improve the understanding of where costs are generated in the production processes. Comparisons between alternative production processes are improved, and the data may serve as a basis for internal pricing measures. Concerning the second question, difficulty in reconciliating the principles of economic control with the culture present in a hospital is identified as the main obstacle to a new management accounting system..
The Toyota Production System (TPS) : ett verktyg för att skapa effektiv och lönsam produktion
Many companies are currently working to optimize and streamline their processes and production lines to achieve higher profitability. In increasingly competitive markets, companies are working to find solutions to increase the value of their production with such a small use of resources as possible.
A tool used to accomplish this is the Lean management system. Lean comes from the Production system that Toyota has been developing since the early 1900's, The Toyota Production system (TPS). The Lean philosophy helps companies, by working towards continuous improvement in its operations, to achieve higher customer satisfaction, more efficient production and ultimately higher profitability.
Many companies are working to implement Lean in their organization. But there are many who fail to implement a complete change towards Lean.
Undersökning av metoder för att analysera och modellera efter stora datamaterial, hantering av programmet SPSS samt en studie i Kronoberg läns gymnasieelevers psykiska ohälsa
The sawmill industry is a relative fragmented industry that is in an economic upswing andwith a hard competition. The customers have high demands on their suppliers and the highcustomer demand make it necessary for the companies to make a streamlining in planningand production. For that reason it is very important that the planning- and productionprocesses aren?t to complex and with a simple structure.The purpose of this report is to study and map out a marked out part of a planning- andproduction process, from adjust works to final delivery, at a company in the sawmill industry.Different methods have been used for the report, among others interviews and subordinatedmaterial.We have mapped out a marked out part of the planning- and production process at theCompany. This part we have studied, and we have analysed the process it self and otherthings connected to the process.We see the planning- and production process in the Company as complex.
Utvärdering av jetomrörning : En studie gällande utvärdering av omrörningssystem vid Ekeby reningsverk
Biogas is a renewable energy produced through anaerobic digestion, which means that organic matter is degraded by microorganisms under anaerobic conditions. The produced biogas can then be used for cogeneration, electricity, heat or upgraded to vehicle gas. Eskilstuna Energy & Environment AB has four digesters at Ekeby water sewage treatment plant, Eskilstuna. One of the biogas reactor (RK4) is equipped with a jet-mixing system while the remaining digester uses top-mixing. The mixing system is an important parameter to achieve optimum operating conditions for the process regarding gas production and degree of digestion.
Förbättringsarbete mot Lean Production på Tooling Support Halmstad AB
Nowdays an efficient production is critical to achieve for companies competing on the market for steel cutting tools. One of such companies is Halmstad based Tooling Support Halmstad AB that manufactures threading-taps, threading-dies and parting off tools, towards a centralized warehouse in Schiedam, Holland. The large amount of different products, approximately 2500 is a big contributor to the problem along with a new order system that creates a demand of low setup times. Previously the company was forwarded orders through quarter based prognoses which enabled planning of the production over a longer time span. Currently the newer order system ZENIT is in use and the company thereby gets their orders weekly.
Utveckling av ett användbart IT-stöd : för att stödja operativa arbetsrutiner
Nuclear power production carries potential risks both for the environment and for the work force. Different safety measures are employed and they stem from local rules as well as from regulatory authorities. This work describes the development of a safety promoting tool at Forsmark Power Plant, one of Sweden?s three Nuclear power plants. We describe the development of a computer based system for Pre-Job Briefing and Post-Job Debriefing.
Planering & produktionsstyrning : Lean filosofin vid produktion av asfalt
Lean is a production philosophy which is about increased resource use while meeting customer requirements. The foundation of lean comes from Toyota and their production philosophy The Toyota Way. Professor Jeffrey k. Liker has worked with Toyota's production philosophy and Lean for a long time and has created a 4 P model and 14 principles that characterize the Toyota Production system (TPS), which many sources refer to.The aim of my work is to study the working procedure of asphalt projects from sales to the laid asphalt with a focus on planning and production management. The goal is to examine how the lean philosophy can be applied in planning and production to simplify the flow of asphalt projects based on Likers model and principles.
Analys av verkstadsplaneringen : på Fläkt Woods i Jönköping
This paper is finishing part of the two-year master programme in Industrial Engineering and Management.Initially there was an inquiry of studying the queue-times that Fläkt Woods uses when they break down internal working orders. These times were assumed to be too generalised and does not apply to the actual value of the queue-times which generates incorrect data and delivery delays. During the work of this paper it has been established that it is not the queue-times that is the biggest problem. The problem is the shop floor control and the lack of manufacturing the right products at the right time. Therefore an analysis of the production planning process was made to bring forward the real problems.
Livscykelanalys av sex olika fiskodlingssystem : Fiskens miljöpåverkan för konsumtion i Stockholm
This thesis evaluates the environmental performance of six different fish farming systems. The thesis is part of the network group ?Hållbar fiskförsörjning I Stockholms län? (HFFS) which tries to increase the domestic and regional production of fish in Stockholm and move to a more sustainable supply in the Stockholm county. Two of the chosen systems; pangasius from Vietnam and salmon from Norway are delivering a substantial part of the fish consumed in Stockholm today, although they are very different when it comes to system characteristics. One system, arctic char with conventional feed, is produced in a fairly small scale in the north of Sweden, while the three remaining systems are viewed upon as possible options to supply Stockholm with fish in the future.