Miljövärdeflödesanalys av Risifruttiproduktionen : En utvärdering av värdeflödesanalys och miljövärdeflödesanalys
This report is the result of a thesis work carried out on the Risifrutti production at the company Procordia Food AB. The thesis is at a master level and is the final work for the author to receive a Master of Science in Innovative production at Mälardalen University. The thesis comprises 30 credits and has lasted for 18 weeks. The thesis is mainly a research on whether it is possible to perform an Environmental Value Stream Map (E-VSM) in a food processing industry and an evaluation if the tools E-VSM and Green Performance Map (GPM) are useful in this type of industry. An extra part to this research is to use the results from the E-VSM and give Procordia Food AB information on improvement potentials in the Risifrutti production. The author has found it difficult to collect some of the quantitative data to the E-VSM, mainly regarding energy, but by using the Value Stream Mapping (VSM) tool and other Lean tools the author was able to identify and quantify several wastes in the Risifrutti production. Recommendations for improvements based on these wastes have been given to the company. In the research part of this report the utility of the Value Stream Map, Environmental Value Stream Map and Green Performance Map in a food processing industry have been analyzed. The author has found that the Value Stream Map has been a useful tool since waste and unevenness in the tact of the production has been identified. The Environmental Value Stream Map and the Green Performance Map are also great tools when a company wants to analyze their environmental impact and then invest in environmental improvements. However, no profound energy analyzes has been done in the Risifrutti production because of the lack of energy meters for steam, electricity and compressed air in the production lines..
Ständiga förbättringar inom verksamhetsprocesser : en studie mellan läkemedel- och kärnkraftindustri
The purpose of thesis was to investigate and compare how two companies within pharmaceutical industry and nuclear power industry are currently working with quality development regarding continuous improvement and Lessons Learned in business processes. In addition, a simple comparison was made with the automotiveindustry.McNeil AB are improving their processes continuously and are according to the findings of this report performing well in their pursuit of world-class pharmaceutical production. They have a well functioning process regarding improvements proposed in weekly improvement meetings engaging all employees. However, during interviews it was made clear that the functionality of the process which administer improvement proposals generated in addition to, or beside the weekly improvement meetings, were inadequate. McNeil AB is proposed to administer this through an IT solution instead of by paper and e-mail, that simplifies the process of adding, implementing and follow up an improvement proposal.The nuclear power plant Ringhals AB recently made major improvements in their business processes as well as the plant itself.
Produkthantering vid tillverkning av roterande verktyg
AB Sandvik Cormorant?s production unit in Gimo has identified a need to examinethe handling of products between operations with the purpose of generatingproposals of improvement for the product handling.The aim of this project is to study the existing manufacturing process and givesuggestions for improvement. The proposals should reduce the manual handling ofproducts, decrease the risk of damaging the products during the manufacturing andform a basis for increased traceability. Based on a mapping of the manufacturingprocess and the problem description, a specification of requirements has beencomposed.The mapping of the manufacturing process suggests that a change of the currentsystem is required. The company is recommended to decide how the producthandling between operations should be performed as guidelines for the productionteam.
Reducering av ledtid genom en värdeflödesanalys En fallstudie på Lammhults Möbel AB
The purpose of this study is to increase the understanding of activities, flows and waste in a company's production process. By performing a value stream analysis, non-value adding activities are identified in a production process and then the suggested improvements that can reduce lead times will be stated. The value-stream mapping identifies the flow of information and the flow of material in a production process and this provides the basis for the identification of non-value adding activities.We conducted the study at Lammhults Möbel AB in Lammhult Sweden, where the production flow of Spira-21 has been investigated. This to identify any non-value adding activities that affect the flow negative and consumes time and money in a non-value adding way.A reasonable approach for the project was taken by studying the methodologies and theories. We conducted interviews and site surveys at Lammhults Möbel AB where the flow of information and material in the production process were investigated.
Produktivitetsanalys ur ett LEAN-perspektiv : En studie hos OPPC, AstraZeneca
The objective of this thesis is to map the resources and methods used at the department OPPC, at AstraZeneca, and derived from that give suggestions on possible solutions that will increase their productivity.Mapping of the product flow, as well as gathering of process data, has mainly been done using observations, but consultation with the process technicians has also played a great role. Further have theoretical methods been used, based on literature studies, within the areas of Lean production and statistics.The work has incrementally gone forward since the steps taken has been restricted by the irregularity of production which led to the need of creating a fictive production flow. This has affected the lead-time calculations in the way that they are meant to give an indication, rather than an absolute truth, on how different methods described shall be used.The current state analysis showed multiple areas of improvement when defining capacity as value adding time in relation to total throughput time. Using the "standard scenario" as a basis showed that the actual production flow only constituted 50% of the total project time. Further it showed that the workflow contained more non-value adding activities than value adding activities, which is a result of how the work is distributed within the department as well as in the different projects.
Klagomålshantering i den svenska bankbranschen
The production costs have steadily increased within the construction industry during the 21st century. Voices are raised meaning that the construction industry is too unsuccessful in making the production more efficient and to develop it?s way of working. One way to deal with the production costs is to minimise the waste, with waste meaning activities that doesn?t add value to the finished product.
Implementering av TPU : En fallstudie om implementeringen av TPU på ABB Cewe-Control i Nyköping
If Swedish companies are to compete with companies in low-cost countries they have to achieve a more efficient production. The purpose of Total Productivity Maintenance (TPM) is to increase the company's profitability by increasing the productivity. TPM is a method that involves all employees and aims to prevent failures in order to increase the availability of existing equipment.The aim of this paper is to evaluate the implementation process of TPM and give recommendations for the further implementation process. The conclusion and the analysis are based on a case study done at a production department at ABB Cewe-Controls facilities in Nyköping. The case study consists mainly of qualitative data from participation observations, surveys and interviews.Commitment of the management is a key factor in the implementation process of TPM.
Lantbruk i framtiden : ett praktikfall
The economic prerequisite to many farmers in Sweden after the EU membership and the
new agriculture policy has generated large demands on the farm management. Until year
2004 you got a grant based on what you had produced and not on consumer demand. In
2005 a new economic aid (Mid Term Revue) was introduced and the conditions has
changed again. Due to this I have chosen to do a cost-benefit analysis on a case, to
investigate if the present production is sustainable in the future.
My conclusion is that the profitability is acceptable even if the farm has a high debt. But
to make the production more profitable the products produced should be refined as much
as possible at the farm, to get maximum economic return.
Apoteksmonopol - en studie som handlar om apoteksmonopolets omreglering
The production costs have steadily increased within the construction industry during the 21st century. Voices are raised meaning that the construction industry is too unsuccessful in making the production more efficient and to develop it?s way of working. One way to deal with the production costs is to minimise the waste, with waste meaning activities that doesn?t add value to the finished product.
Sverige till Indien - En interkulturell förhandlingsresa
The production costs have steadily increased within the construction industry during the 21st century. Voices are raised meaning that the construction industry is too unsuccessful in making the production more efficient and to develop it?s way of working. One way to deal with the production costs is to minimise the waste, with waste meaning activities that doesn?t add value to the finished product.
Kassationer på ett livsmedelslager - Effektivisering och kvalitetssäkring av processen för intern kassation i enlighet med Lean Production
Today's fierce competition means that companies constantly must develop their business and internal processes. Focus on processes and continuous improvement is something that characterizes Lean Production which ICA logistics are applying with their concept Leading Logistics. Standardized routines for handling damaged gods were insufficient at the ICA distribution center in Kungälv. Handling and registration of damaged gods were not performed uniformly, resulting in problems with controlling and monitoring the process.The purpose of this thesis was to analyze and make recommendations how the process of internal handling of damaged gods could be improved. Therefore a comprehensive understanding was needed of the entire material flow through the warehouse and important quality aspects such as product safety and delivery reliability.The methods used are literature reviews, interviews and observations to produce a comprehensive process mapping of the current situation at the distribution center.
Lean i arbetsprocessen för projekledning
This report presents the results of a thesis in which the department PL Hus at Grontmij AB isstudied. The study has been done in order to locate problem areas in order to streamline andimprove the quality of working. The study was done by an engineering student from theDepartment of Industrial Management at KTH on behalf of Grontmij AB. The project extendedover a period of 20 weeks during spring 2011.In addition to the Department itself has two project managers in two different projects beenfollowed. The method used has been participant observation and was used to be able to comeclose to reality and thus find problem areas where there are opportunities for development.Validation was made through comments and opinions from workers at Grontmij AB, afterreading the reports analysis.Based on a system and holistic approach has parallels been drawn to the production systems suchas TPS (Toyota Production System) and lean production.
Biogasanvändning vid Käppalaförbundets Reningsverk: ? en värdering av miljöeffekter
This thesis calculates and compares the values of improved environmental quality due to future possible investment alternatives in biogas production facilities at Käppalaförbundets Reningsverk (Käppala Sewage Treatment Works) in an attempt to determine which alternative yields the highest such value. Käppala faces three investment alternatives for the usage of biogas. The alternatives are production of vehicle fuel, district heating and thirdly, heat and power production. Estimates of the value of environmental change are calculated for each of the three investment alternatives, and these estimates are then compared. The environmental change in question is the change in discharge levels of carbon dioxide (CO2), nitrogen oxides (NOx), sulphur dioxide (SO2) and particle matter.
Systemanalys flingtork : Produktionseffektivisering
BillerudKorsnäs is a leading global provider of primary fiber-based packaging materials and on Gruvöns Bruk in Grums, they have chosen to invest millions in the boiler at the facility to increase the total capacity of the factory. This results in the Pulp Flash Dryer at Gruvön being burden more, which makes it important that it is of great reliability and can be run with a high capacity. The reliability of the Pulp Flash Dryer at Gruvön is not as good as one could hope, which leads to reduced availability and production, as well as to increased maintenance costs. There are a number of different reasons for this, but all the casual links are not known.The purpose of this project was to perform a system analysis of the Pulp Flash Dryer to identify bottlenecks and the most critical parts from a capacity- and availability perspective. Appropriate methodology for the system analysis was used and would be used in a structured way to perform the analysis with data from the process and the maintenance system.
Grus i maskineriet : en fallstudie om förbättringspotential
Grus i maskineriet ? en fallstudie om förbättringspotentialVäxeln AB, a company that provide sales, service and repair of industry gears, has contacted the authors of the essay and asked us to investigate in which areas of the company that has improvement potential. Persistent improvement is a recurring and up-to-date issue that many business leaders not put enough resources on. A big problem in many companies is the issue that there is no comprehensive view and therefore some of the workers tend to not follow the routines that are required for the whole system to work.The goal with the essay is to give Växeln AB advice on to which areas in the company that have improvement potential.We have used a qualitative method with mainly semi-structured interviews which has led to an inductive approach. 13 co-workers that work in different areas of Växeln AB have taken part in the interviews.