Sökresultat:
3633 Uppsatser om Point-bearing capacity - Sida 3 av 243
Rörelsens betydelse för inlärningsprocessen.
The purpose of this examination was to se how exercise affects the learning capacity. In this work I have chosen to integrate natural science with sport and the target group was a primary department. The two areas I integrate with sports were: the digestive system and knowledge of deciduous trees. I split the class in two different groups. One group got to have a theoretical lesson and the other one got to have an exercise lesson.
Framtagande av OEE-mall
At Volvo Cars Torslanda's paint shop there is a requirement to in a fast and effective way get an overview of the plants capacity. Therefore a capacity template was constructed as a tool for the engineers at Volvo several years ago. This template has during the years become complicated and outdated. Thus this thesis work will resort as a new capacity template, built from scratch. The new template has been built up based on requirements from Volvo and the concept of OEE (Overall Equipment Effectiveness).
Konstruktion av efterbehandlare
The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.
Acceptansgränsen för solceller i lågspänningsnät : Kan den ökas?
Microproduction, also called distributed generation, is something that has become more and more popular in the electric grid. Microproduction can however lead to unacceptable performance if several units are installed in the same low voltage network. It is therefore good to know a limit where the performance of the low voltage network becomes unacceptable based on given parameters. This limit is usually called hosting capacity.In this report the hosting capacity with respect to voltage and current have been studied in three low voltage networks which are located in Falu Elnäts concession area. This has been done by simulations in a GIS-program where critical times of the grid have been simulated.
Timeliness cost for agricultural sprayers : weed control in cereal crops
Evaluation of machinery costs is necessary for selecting appropriate farm machinery. Timeliness cost due to untimely operations is an important component of machinery costs. Timeliness costs can be high for crop sprayers, since pesticide application must be carried out within a short time interval. This Master thesis investigated the timeliness cost and the probability of a suitable workday for spraying. Timeliness factors were estimated for four different crops (oats, spring wheat, winter wheat and barley) using historical weed trial data.
Jämförelsestudier av Takkonstruktioner med Stora Spännvidder
The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.
Två nya trailerkoncept för transport av rundvirke hos Stora Enso : en analys av prestation och flexibilitet
The need for roundwood transport capacity vary throughout the year. The need during a period is influenced mainly by the volume transported the period, the number of days during which transport can be carried out, seasonal variations in road conditions and the weight of the roundwood, and the origin of the wood (private forest owners/ forest companies). The need for transport capacity generally increase during the winter and in spring, after thawing. Lack of logging trucks combined with a lack of drivers for these trucks make it hard to hire extra help during periods of increased transport capacity needs. It is also very expensive to keep logging trucks for use only during these periods.
In this thesis, two new concepts based on the partial transport by truck tractors have been examined, to find out the possibility for increased performance and flexibility.
En validitetsstudie på beeptestet : avseende maximal aerob kapacitet för elitishockeyspelare
Introduction: This study aimed to investigate the validity and reliability of the 20m multistage shuttle run test (MST) for elite ice hockey players as a predictor of the maximal aerobic capacity and the how the result is affected by the players age, aerobic and anaerobic capacity, body composition and test surface. The purpose of this was to find out the potential of the 20-m shuttle run test as a measuringtool for the maximal aerobic capacity in frequent testing periods during the season. It is very interesting to be able to administer this easily because the competative phase of the season is very long compared to the pre-seasonal phase and earlier studies have shown that the aerobic capacity is being lowered during this competative phase of the season for elite icehockey players.Methods: 34 elite ice hockey players participated in this study (20.0±3.6 yrs, BMI 24.2±1.6 and VO2-max 58.0±4.8 ml O2?kg-1?min-1). During 3-5 days they underwent 2 MST tests (wood and rubber surface), treadmill running with VO2-max assessed with open-circuit technique, Wingate10% and FFM-assessment with underwater-technique.
Utveckling av mothållssystem till valsar
This Master Thesis is a product development project that has been carried out incooperation with Metso Paper Sundsvall AB. The task has been to develop a holdingsolution that generates force between two rolls and to evaluate the new solution withrespect to functionality, manufacturing, structural stability, costs, assembly etc. Theroll holding solution is a system that is part of a rollpress. The rollpress is used towash and dewater pulp. The existing solution creates forces that have to be absorbedby the gable of the press.
Kartläggning av utredningsprocessen vid Arbetsförmedlingen Rehabilitering i Sverige : en pilotstudie
The Swedish National Labour Market Administration wishes to acquire further knowledge about how the evaluation process of vocational rehabilitation at the employment service operates as a part of the quality assurance of this activity. The primary task for vocational rehabilitation at the employment service is to investigate the work capacity of unemployed people, to give them increased knowledge and better understanding of their own capacity concerning work or education. The aim of this study was to survey the evaluation process of vocational rehabilitation at the employment service in Sweden. Data were collected through telephone interviews with 15 occupational therapists employed at the employment service, who were working with vocational rehabilitation. The result shows that the investigation of work capacity can take place in different environments and that the space of time for an investigation can vary.
Möjligheter för naturturism i Borgsjö
Increased interest in nature tourism may be what saves small and dying villages, like Borgsjo? in the county of Va?sterbotten in northern Sweden, from disappearing. The nearly untouched nature in these areas is in many cases an unused resource, since true wildlife experiences are sought by many travelers. The purpose with this report is to investigate if Borgsjo? has the potential and abilities to become a destination for nature tourists, and how this should be done to avoid negative effects on nature, wildlife and culture.
Ombyggnad av lägenheter i ett 1950-tals flerbostadshus till kontorsbyggnad
The report aim to increase awareness of factors that have a major role whenremodelling an apartment building from the 1950s to offices.The thesis can be used for future projects when remodelling apartments to offices.The report can provide ideas and inspirations on how this can be done in aneffective way, ie . A way that does not require rebuilding the supporting structure,but only non bearing walls. The thesis also gives insight on the parts that will needto be supplemented from Boverket?s requirements in terms of accessibility,acoustic and fire requirements.The methods used in this thesis are literature studies, case study and sketch work.In the literature studies, the primary sources were Boverkets byggregler BBR, andArbetsmiljöverkets föreskrift AFS 2009:2 but other literature were also used. Theprimary items were chosen from the literature studies and they were furtheranalysed in the sketch work.
Avbördningskapacitet för Traryd kraftverk: en modellstudie vid dimensionerande flöde
Sydkraft Vattenkraft AB owns and operates the Traryd hydropower plant, located in the river Lagan in the southern part of Sweden. The gravity dam is classed according to RIDAS guidelines (Hydropower Industry Dam Safety Guidelines) as a class 1B dam. This means that the dam must discharge a class 1-flow which has a return period of 10 000 years. The inflow into the dam has been calculated in an earlier report to 495 m3/s, with a waterline at an elevation of 126, 3 meters above sea level. The gravity dam has a discharge system with two rectangular weirs, which results in a smaller discharge than the necessary 495 m3/s.
Kapacitetsberäkningsmodell för materialhanteringsflödet på Ericsson i Kumla
Ericsson?s factory in Kumla, Modules Kumla, became a hub for radio modules and micro base stations, which enables mobile communication through radio base stations, in 2004. Because of this the factory focuses more on the logistics operations. This has led to a need to be able to plan the capacity for the materials handling system. This master thesis has therefore been performed at Modules Kumla to develop a capacity calculation model for the material handling flow during the autumn of 2005.The work has contained a mapping of the material handling flow regarding to which activities was performed and how much time they consumed.
Reglering av matarsystem vid höghastighetskapning
Today small metal parts are mass-produced as for example rollers in cylinder bearings. At high velocity cutting the metal is cut with a great force in a scissor-like device. Both precision and repeatability is important to be able to guarantee good quality, but from an economical point of view it is also important to keep a great manufacturing capacity. The part of the process that is most time consuming is when the metal bar, that is about to be cut, is fed to the right position. Therefore it is interesting to examine if the time used for positioning can be reduced.