905 Uppsatser om Phase shift - Sida 51 av 61

Kommunikation, uppföljning och tidsplanering inom detaljprojekteringen : Hur projekteringsprocessen kan effektiviseras med små medel

Producing a building is a long and complex process. It consists of several parts, from the feasibility study and design stage onto the construction and finally the management of the building. The design process is a critical part of the process where construction plans are made. The quality of the plans affect the production phase in great extent and faulty plans can pose a risk for extra costs for all parts in the process. The cost of producing dwellings has increased the last years and the detail design process is one of many phases where improvements can mean cost savings within the whole building process.This report aims to point at parts within the detail design process which could be more efficient, regarding communication, follow-up and time planning, and to give suggestions for improvements.

Resource planning for internal logistics : A tool designed for the material handling department at Scania Axles and Gearboxes

This master thesis is performed at Scania Axles and Gearboxes, a production plant located in Södertälje. Within the plant axles, gearboxes as well as central gears are assembled from components to finished products. All production is conducted on production lines, with a pre-determined rate, which is supplied with components by the material handling department. Since the production quantity and the mix of product variants produced on the production line is customer order-based, the number and type of components needed for production as well as appropriate staffing within the material handling department is difficult to predict. Scania is currently using a number of different resource planning tools for each material handling-department within Axles and Gearboxes to visualize the workload within the departments.

Design och utveckling av kommersielltbabypaket för blivande föräldrar

This project is implemented as a thesis at the Royal Institute of Technology in the master?s degree program Integrated Product Design and Industrial Design Engineering. The project has involved development and efficiency of a free starter package for expectant parents with useful content consisting of useful products for both before and after childbirth. Areas that have been investigated include packaging development, service design and appropriate content for the package.During the work, theory about packaging design, materials, manufacturing techniques and logistics have been processed to base the further work on. The project process has involved competitor analysis and interviews with store owners and customer surveys, that have been conducted to identify areas for improvement of the current solution.

Linjenätsutredning i Täby kommun.

The public transport network in Täby commune consists currently of two types of bus line of whichboth belong to the category of feeder lines. The first type terminates at Danderyds sjukhus and feedsto the subway whereas the second type terminates at Täby centrum and feeds to Roslagsbanan, asuburban narrow-gauge railway system in northern Stockholm. The trunk bus line that connectsgreater parts of the commune with Danderyd is the ring line 604 and goes both clockwise (604H) andcounterclockwise (604V). The main negative aspect of this structure is the complicity in incorporatingit timetable-wise with other bus lines that share the same route, such as through Enebyberg.The goal of this project is to investigate the possibilities of splitting ring line 604 and connecting theends to two different bus routes that terminate at Täby centrum today. Apart from easing thecoordination with other bus lines through Enebyberg, the extension also creates new directconnections from various areas in Täby to Danderyds sjukhus.

Utvärdering av Kvarnholmens silotorn inför ombyggnad till flerbostadshus

AbstractThe project "Sound and Play" have been implemented in collaboration with the toy company BRIO in Malmo. The purpose of the project was to examine whether and how BRIO in the future could develop toys around sound for Toddlers.The problem formulations that would be answered after completion of the project was "How could BRIO broaden its product range with the help of audio toys?", "How can you combine toys and sounds in an interesting way for children?", "How do you create a toy with sound that is fun for the child, but not annoying for parents?". Currently BRIO only has two toys with sound in this age group.The expression of the toy was going to be a mix of classic and cool and the overall feeling of the toy was going to be explorative and arouse curiosity in the child. This feeling would be communicated through simplicity and joy.

Bärförmåga i skjuvning för råspontpaneler. Laboratorietest och FE modulering

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

En effektivare byggprocess genom standardisering, kommunikation och erfarenhetsåterföring

AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kartläggning av funktioner till ny planeringsmodul

This report is a result of a project that been conducted on System Andersson. System Andersson sells and develops MPS-systems for small and medium sized manufacturing companies. System Andersson are today located in the central parts of Jönköping and has about 20 employees. The goal for the project is to develop a new version of Andersson Qwick mps. The project has been divided into a number of smaller projects were the authors been part of the planning module project.

Sportswear of Sweden - I strävan efter autenticitet : Ett företags strävan att repositionera sig autentiskt

This paper aims to study the Armenakis´ theory of readiness, "are they ready?", which consists of five key components affecting the outcome of an organizational change. In this case study, the intention is to investigate if any component is important; alternatively if it is possible to discern a pattern between components, i.e. how they correspond to each other. During the past 30 years have a research group lead by Armenakis has studied organizational change and how resistance to change can be avoided by preparing employees in the introductory phase of change. The main object for Armenakis is the question "what determines whether the employees (change recipients) adopt and support, or reject and resist a change".

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Har antalet naturvärdesträd i Sverige förändrats mellan 1999-2009?

Forestry and forest products are vital components of the Swedish economy but the forest is also important for recreation, hunting, out-door life and conserving biodiversity. The Swedish Forest Act has two equally important objectives, production and environmental protection. Polytax is the Swedish Forest Agency´s inventory programme which monitors progress toward the two objectives in connection with regeneration fellings. It includes data on environmental protection measures taken in connection with regeneration fellings. 30 § of the Swedish Forestry Act and related regulations specify the demands for conserva-tion of nature.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.