Sökresultat:
819 Uppsatser om Paint components - Sida 19 av 55
Värdeflödesanalys och förbättringsförslag på Pallco AB : Value stream mapping and improvement proposal at Pallco AB
This report is a study made at Pallco AB. Pallco is a subcontractor that is specialized on steel and aluminium components.The aim of the report is to show an improvement proposal that leads to a reduction of the storage and improve the flow through the production of one item that is a part of a product that Pallco manufactures.With the increasing competition from other countries who can manufacture with lower costs must Swedish companies try to make theirs manufacturing as efficient as possible and remove all waste. By using the tools of Lean Production it is possible to reduce the costs and increase the efficiency.The method we used is value stream mapping. A map of the present condition has been made and then different improvement proposal were discussed. A map of a future condition has also been designed..
Konsolidering av v?vsp?nda papperstapeter: analys och metodutveckling
Printed and painted wallpaper on a weaved fabric backing was a common way to decorate homes in Sweden during the eighteenth and nineteenth centuries. Not much is written about the craftsmanship in relation to the hanging of these wallpapers and even less about the conservation of the objects. Even so, many wall segments remain in situ and in museums and are more often than not in dire need of conservation such as deacidification and consolidation. These are composite objects, consisting of cellulose materials with different properties along with adhesives and paints. Analysis of the materials is required to ensure safe handling and choice of conservation materials, and to establish a treatment plan which will be executed in several steps.
This thesis aims to identify these steps and develop a method for conserving the wall segments with suitable materials, preferably without altering the source material to any significant degree.
Godshantering av flygunderhållsartiklar - En värdeflödesanalys ur ett förbättringsperspektiv
Saab Component Maintenance in Linköping, Sweden, offers maintenance, repair andoverhaul (MRO) services for civilian and military aircraft components. Lately, thedepartment has struggled with slow throughput rates, despite various counteractingattempts. Studies show, that large parts of the delays derive from the logisticsdepartment where goods arrive and dispatch. Therefore, Saab wants to carry out anextensive analysis of the department in order to further investigate what is causing itsslow throughput rates.The thesis begins with extensive mapping over Component Maintenances whole valuestream to find out how departments interact with each other and which roleindividual departments have in the total supply chain. Out of 13 000 different partnumbers, components were divided into five product families.
Simulering av produktionskapacitet, ledtider och PIA vid kiselkretstillverkningen på Ericsson Components AB
Ericsson Components AB i Kista tillverkar kiselkretsar i ett antal fabriker. Den fabrik som studien berör är "Plan 3". I framtiden ska produktionskapaciteten ökas och processmixen (mix av tillverkningsflöden) förändras för fabriken. För att undersöka hur produktionskapaciteten påverkas av en förändrad processmix och hur produktionskapaciteten kan ökas har simulering valts som verktyg. Syftet med studien är att med hjälp av produktionssimuleringsprogrammet Automod simulera kiselkretstillverkningen i fabriken "Plan 3".
Betydelsen av förändringar i DuPont-komponenterna för framtida operativ lönsamhet
The DuPont formula is one of the most well known and basic tools used for financial statement analysis and is highly useful for understanding firms strategies and operating environment. Previous studies on American listed companies have also shown that analysis of the changes in the DuPont components is useful in forecasting contexts. In this thesis we test whether disaggregating the change in return on net operating assets provides incremental information about future performance for Swedish listed and not listed companies. We find that the change in asset turnover is a leading indicator of increased profitability for both listed and private companies, regardless of size. We also find evidence that the usefulness of the disaggregation for understanding future performance is greater in capital intense industries and lesser in service industries..
Westhelicopter AB Aircraft Technical Status Report
Westhelicopter INC. has an aviation workshop providing qualified helicopter maintenance in accordance with PART-145. Maintenance and administrative base is situated in Luleå at Kallax airport. The types that Westhelicopter INC are currently authorised to service are: Eurocopter AS 350 Base/Line Maintenance, Eurocopter EC 120 Base/Line Maintenance and Robinsson R44 Base/Line Maintenance. The thesis work has been to make new maintenance programme for Westhelicopter INC. This maintenance programme will be used to follow-up the time of the components, service bulletins and ADs.
Scenografi för en landskapsarkitekt :
Stage Design is design for action and contains décor, side-scenes and properties, as well as costume and grease-paint. The one responsible for this is the Stage Designer, who together with the Director, creates the best conditions for the actors to perform in.
The stage, where the play takes place, could be either in a theater, an auditorium, or in another sort of room, at another place, inside or outside, and where the place itself inspires to theatrical performance and expressions. This type of theater is called Site-specific theatre.
Two examples of this is the workshop ?Skogen sjunger? (eng.
Omkonstruktion av testrigg för småskalig ångsmotor
The actual project presents the development of a testing rig for a steam engine. A short overviewabout the development of steam engines is presented, until arriving to the development of thepresent engine, which will require to be tested in different ways.The testing rig studied on this project (based on a Lanchester engine) will be used to testdifferent materials and layouts for the group Piston-Cylinder.The engine is a high performance steam power engine, which is going to have a highpower/dimensions ratio, what will lead to require high performance components and materials.An introduction to the testing rig is presented, and the entire design project is done in order toreplace the disappeared documentation of the current testing rig, built on the 1970?s. Also somemodifications done in the original testing rig are presented, as well as some detected problemsand their possible solutions..
Utformning av layout och monteringsupplägg på
transmissionsmonteringen vid Volvo CE Components
Examensarbetet är utfört på Volvo Construction Equipment Components AB i Eskilstuna. Där tillverkas transmissioner och axlar till hjullastare och ramstyrda dumprar. Uppgiften har varit att ge förslag på en layout med bästa potentiella monteringsupplägg på transmissionsmonteringen, baserat på prognostiserad volym år 2006. Stationsmontering är det rådande produktionsupplägget. Det faktum att monteringstiden är lång och att det förekommer dolt montage gör det lätt att glömma detaljer.
Konceptutveckling av luftutblås
This Master?s Thesis work was performed at the Studio Engineer department at Volvo CarsDesign Centre in Gothenburg, Sweden. The assignment has been to create a new idea of an airvent where the news value mainly was focused at functionality but also with great attention onvisual appearance.The work has been totally independent and not been aimed to any specific car model. Theindependency initially made that the visual appearance primary wasn?t limited in any way dueto surrounding components.
Utveckling och design av elektronikskåpet TEC
ABB är ett globalt företag med kontor och fabriker över hela världen och affärsenheten i Ludvika anses vara världscentrum för kraftöverföringsteknik. Enheten ABB Components i Ludvika har en avdelning som tillverkar kontrollskåp till transformatorer, denna produkt kallas för TEC. Produkten började utvecklas 1999 och har funnits tillgänglig på marknaden sedan 2002 i två olika modeller. Produktutvecklingen inom ABB ska ske effektivt och inom givna ramar för kvalitet, tid, kostnad och specifikationer. Det är även viktigt att hela företagets kompetens aktivt utnyttjas genom hela utvecklingsprocessen.
Simuleringsanalys av målerianläggning
Det här examensarbetet har utförts på Volvo CE Components AB. Analysen har gjorts på en befintlig målerianläggning i Eskilstuna med hjälp av diskret händelsestyrd simulering. Analysen har presenterats på PLAN:s forsknings- och tillämpningskonferens och har i artikelform publicerats i konferensskriften. Artikeln är en del av denna rapport. Undersökningen behandlar variationen på måleriets uteffekt genom att undersöka effekten av att måla komponenter i en viss cyklisk sekvens.
Kommunikation i förändringsarbete : vilken roll spelar kommunikation för chef och ledare i en LEAN förändring
Examensarbetet inleddes med en förstudie där olika förbättringsområden inom organisationen identifierades. Kommunikation i praktiken kan liknas vid ett förstärkningsverktyg vilket påverkar de vanligaste faktorerna för ett lyckat förändringsarbete. Idag måste en ledare och chef vara kommunikativ och det fungerar inte längre med att peka med hela handen. Medarbetarna måste förstå sin chef och ledare och det måste finnas ett samspel mellan dem. För att chefer och ledare ska styra förändringsprocessen behövs kommunikation.Syfte med examensarbetet är att undersöka hur kommunikationsprocessen kan användas som styrmedel mot en social förändring.
Modellbygge av mekaniksystem och riktmotorer i stridsvagn 122
This master thesis is one part of a project, called ?StabSim?, with the purpose to develop a simulation model for the align and stabilisation system in main battle tank 122. The origin of this project is that it should be possible to make control analysis without risking any hardware. Besides that it will be easy to change components in order to investigate the behaviour of the system. The report includes modelling of tower and weapon mechanics and also the modelling of the synchronous motors, which control these.
Drivförstärkare : Bredbandig drivförstärkare med hög verkningsgrad
This report present the design and manufacturing of a wide-band driver amplifier placed in radar module for airborne applications. The major goals for the amplifier were a high efficiency and to deliver a predefined output power. To reach the second goal an additional preamplifier had to be constructed. The amplifiers were constructed in three steps: Design and Layout in the software Microwave Office, Mounting components and Verification. The driver amplifier was decided to be a push pull configuration consisting of two parallel transistors biased in class AB.