Sökresultat:
370 Uppsatser om Numerical simulations - Sida 4 av 25
Osäkerhet i energisimuleringar av flerbostadshus : Analys av fem nybyggnationer
Since energy simulations are used to verify that projected residential buildings will reach the current energy requirements it is important that the results are reliable.This report investigates the extent of uncertainty in energy simulations, estimates the causes of the uncertainty and its economic and environmental consequences.The method used in this report is based on three validation methods; empirical validation, analytical validation and comparative validation. The analysis was carried out for five multi-family dwellings in Uppsala with installed meters for energy measurements. One of these objects, Klockarlunden, was studied in more detail than the others.The results show that the deviations are between 10 and 29% for the studied objects, which means that the uncertainty is estimated to be at least 29%. All simulations underestimate the buildings need of energy. The simulation for Klockarlunden can predict the energy consumption to be within the range of 46-98 kWh/m2year with 90% confidence level based on the current uncertainty.
Teknologi & Numerär : Frågan om vem som vinner
The reason for this study is to settle the balance between technology and preponderance in war. Each theory claims its own superiority to be decisive when it comes to achieving military victories, but this study will show what actually happens when the two theories are analyzed together in the same conflict. To prove the conclusions, a case-study on Operation Gazelle is used. The study will describe the theories, what a military victory is and which party in the conflict came out victorious after this specific operation. Both sides? forces will be shown and compared.
Simulering av vindkraftverk och närliggande elnät vid Risholmen i Göteborg i SimPowerSystems
With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.
Spänningsstyrd underfrekvenslastfrånkoppling i elektriska kraftsystem
This report is a Master?s Thesis performed by Andreas Adolfsson and David Jacobsson atChalmers University of Technology. The purpose of this master?s thesis is to evaluate anew method for load-shedding, the voltage controlled underfrequency load-sheddingdeveloped by ABB. This report presents a comparison between conventionalunderfrequency load-shedding and this new method for load-shedding.
Analys av spänningsstabilitetsberäkningar i det svenska elsystemet
Numerical simulations play a vital role in both static and dynamic stability assessment of electric power systems and the foreseeing of voltage collapse. Simulations performed by Svenska Kraftnät(SvK) are mainly done in the specialized voltage collapse predicting software tool, SPICA and the more all?purpose software tool, ARISTO.The grid operators at SvK use SPICA to predict the maximum transfer limit at specified sections (in this report the section in concerns is the southern part of Sweden i.e. interface1 4). SPICA is mainly used as an online application by using actual states from the grid, these states update every quarter of an hour.This thesis is a continuation of the master thesis SPICA ? ARISTO JÄMFÖRELSE by Jakob Katzman and Johan Fält.
Dyskalkyli : Normativa data fo?r svenska barn i a?rskurs 5 och 6 pa? Dyscalculia Screener och hur testresultat korrelerar med avkodningsfo?rma?ga och skolmatematik
Dyskalkyli (specifika ra?knesva?righeter) a?r en av flera orsaker till matematiksva?righeter. Studier har pa?visat samband mellan dyskalkyli och dyslexi och att personer med dyskalkyli har sva?rt att klara skolmatematiken. Tva? skilda synsa?tt fo?rklarar orsaken till dyskalkyli: systemteorin och modula?rteorin.
BIM i förvaltningsskedet - Nyttan för fastighetsägare
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Optimering av ett småskaligtvattenkraftsystem
This master thesis covers the seasonal planning of a small scale hydropower system. The system in this study is owned and operated by Mälarenergi Vattenkraft AB. The total system consists of 4 different main rivers with 24 hydropower stations and several dams. The total installed power in the system is 43.75 MW. Most of the hydropower stations are regarded as small scale hydropower stations and thus entitled to green certificates.In this report the issue of planning is formulated as an optimization problem.
Att projektera för demontering. Undersökning av stomsystem
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Analys av högfrekvensstörningar och elnätskommunikation i distributionsnät
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Undersökning av lönsamhet inför fastighetsförvärv
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Formsättning för broar -Tillfälliga konstruktioner vid brobyggnad
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Värdering av innemiljön i Hamnhuset med metoden EcoEffect
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Motivationsbefrämjande åtgärder: En studie på Peab ur ett arbetsledarperspektiv
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Brokonstruktion i Tibet- Ett led i att förbättra infrastrukturen i området Sichuan
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.