Sök:

Sökresultat:

370 Uppsatser om Numerical simulations - Sida 24 av 25

Verifiering av beräknad energiprestanda för flerbostadshus byggda år 2007-2009

The building industry consumes approximately 40 % of the total energy consumption in Sweden, where the using stage is dominating with 80 %. There is a lot of work in progress to reduce energy use in the building industry, and the demands from authorities regarding energy use increases. As a part of this work Building and planning department of Sweden has established a requirement that has been applied since 2006, and restricts a maximum energy use for buildings.The requirement includes that an energy simulation must be done in advance to demonstrate that it is possible to meet the demands.Reality is however more complex than an energy simulation program, that frequently underestimates the energy use of buildings. The purpose of this thesisis to study and analyse deviations between estimated and actual energy use in modern apartment buildings. The study includes four apartment buildings in Stockholm, Gothenburg and Jönköping that were built in 2007-2009.

Standardisering av brukarrelaterade indata för energiberäkningar på kommersiella lokaler

In this thesis, input data for energy performance calculations on commercialpremises have been studied. In energy performance calculations, where internal heat gain parameters are unknown, template values that, in a reasonable way represent the activity in the room, are necessary. These values can be used as input data for whole-year calculations, or for calculations on shorter periods of time.The purpose of the Sveby project is to create standardized work practice in energy issues for the construction industry. The work in this thesis is conducted to correlate with the purpose of the Sveby project, with aims of contributing with information and guidelines for the continuing work with commercial premises.In this report, suggestions for template values for internal gains parameters, based on research and calculations in the field are presented. Suggestions on how these can be implemented in a user-friendly way for two energy performance calculation software are also given, VIP Energy and IDA ICE.

KORTSIKTIG PRODUKTIONSPLANERING I MINDRE FJÄRRVÄRMESYSTEM : En studie vid Strängnäs Energi AB

District heating covers around 80 % of the heating demand in apartment buildings and 10 % in single-family homes in Sweden. In the year 2010 the total input of energy to the Swedish district heating grids was about 70 TWh, which corresponds to 11 % of the total energy input to the whole energy system in the country. Through the combined production of heat and power the CHP-plants often reaches an efficiency of 90 % from energy in the fuel to produced heat and power. In order to keep the efficiency high it is important for the owners of the plant to have good knowledge about the plants performance at different operation points. Strängnäs Energi AB initiated this diploma work together with FVB Sverige ab in order to come up with a program for short term planning of the production of heat and power at the company´s CHP-plant.The work consists of three main parts.

Konstruktion av specialmaskin för orientering och positionering av nyckelämnen

The thesis in product development ? mechanical design includes 15 credits and was carried out during the spring of 2014 at Semcon in Eskilstuna. The task is to construct a special machine for positioning and orientation of a key blank found in six different shapes, the construction is a part of a larger machine for encoding the key blank where a pick- and-place device or robot pick up the key blank and deliver it further in the process. The entire construction is designed for ASSA OEM Gothenburg.In order to accomplish the project the first step was to analyze the existing solutions to similar problems on the market in a current situation analysis to create an understanding of the problem. This was followed by a flow analysis and a functional analysis to get a deeper understanding of the problem and structuring the machine's process flow and its features.

Simulering av en framtida presslinje - en analys av design och prestanda

Problem areaAlfa Laval is a world leading company in the heat transfers area and have the vision to continue to be that in the future as well. The company has a lot of press lines where the utilization is high and also has started to become old. Prognosis shows that there is an increased demand of heat exchanger in the future. This increased demand is not something that existing lines will manage. To build new lines cost a lot of money and take time so it is essential that new lines are correct from the start and not need to be rebuilt or a lot of time spent to trim it.GoalThe goal is to achieve 100% theoretical utilization of the press (the press shall press the amount of plates it is designed for).

Utvärdering av VAV i nybyggt kontorshus

VAV (Variable Air Volume) system has been studied in a newly constructed office-building. The goal for the study has been to evaluate how the ventilations system work in practice, if adjustments can be made to achieve an more energy efficient system and to evaluate if other alternative ventilation systems is to be preferred in the further.The degree project has been executed at Helenius Engineering Firm who is working with the environment, media systems, HVAC and energy in buildings. The building that has been studied is owned and operated by Akademiska hus.Literature studies, visits at site, inventory, review of system documentation, energy analyses, interviews, key figures, LCC, sand energy- and indoor climate simulations has been made to study the building. Where appropriate some tools from Six Sigma have also been used.How to achieve an energy efficient system and a pleasant indoor climate is studied with human health and well-being as base for the indoor climate requirements. Technical support systems such as ventilation systems have to be designed so that an acceptable indoor climate can be achieved.

Fo?rutsa?ttningar fo?r elektrifierade lastbilar med eHighway inom svensk gruvindustri : En ja?mfo?relse av olika transportslag mellan Mertainen och Svappavaara

The Swedish government has a goal of achieving a fossil-free vehicle fleet in 2030. Heavy transport constitutes a significant part of Sweden's transportation sector and the vehicles are driven almost exclusively by fossil fuels. Siemens has developed eHighway, a concept for electric road systems enabling electrification of trucks, in order to reduce the environmental impact of heavy transports. This study aims to investigate the potential that eHighway has on transporting iron ore from the mine of Mertainen to a processing plant in Svappavaara. Electrified trucks are compared with conventional trucks, and diesel and electric trains.The evaluation was made with respect to energy consumption, environmental impact, and cost.

Vattenkvalitet och risker vid ändrat intag för vattenförsörjning i Västerås

Water is the most essential resource for life. In cases where drinking water is processed from surface water it is important to ensure the raw water is of good quality, and is suitable for processing through the water treatment plant.The drinking water for Västerås is sourced from Västeråsfjärden, in the western side of Lake Mälaren. The city itself is home to marinas, ports, a wastewater treatment plant, the Svartån outlet, sewage pumping stations and stormwater outlets. Because of the negative effects these activities have on surface water quality, Mälarenergi AB is interested in relocating the raw water intake point to Granfjärden, 10 km east of Västeråsfjärden. At Granfjärden the intake point would be less exposed to the activities in Västerås, and could be placed at a greater depth, resulting in better water quality.In this Master?s thesis the water quality and the pollution risks at Västeråsfjärden and Granfjärden sites are compared.

Däck-mark Interaktion hos skogsmaskiner

The most predominant method for forest harvesting in Sweden is the cut-to-length method based on two-machines, a harvester that fells trees and cut them in a predefined length, and a forwarder which transports logs to a landing area for further transport to a processing facility. New machine solutions have to be much gentler to the ground than today?s machines. To be able to develop a forestry machine that preserves the terrain requires a proper understanding of the interaction between tire and soil.The goal of the project is to contribute to the existing knowledge of forest machine tire-soil interaction and to develop a tire-soil model that enables dynamic simulations of forest machines operating in rough terrain. The modeling has especially been focused on the interaction between tires and soft ground.A comparison of theoretical data of different WES-based terrain interaction models and a comparison test data from a full scale field test is presented.

Om hur en banks value at risk bäst skattas med expected shortfall

Bakgrund: Om VaR kan estimeras väl med hjälp av ES-metodik, kan man få bukt med VaR-måttets brist på sudadditivitet (vilken innebär dels praktiska problem vid utformning av finansiella organisationers limitstrukturer, dels teoretiska problem i enlighet med Artzner et al (1997, 1999)) samtidigt som man uppfyller det formella kravet på att rapportera sitt VaR på 99 %:snivån. Syfte: Att undersöka hur väl ES ? estimerat på olika konfidensnivåer och med olika metoder ? duger till att skatta en banks 99 %:s-VaR. Metod: Två ES-metoders och sex VaR-metoders förmåga ? både avseende frekvens (Kupiec-test) och oberoende (eget längsta-följd-test) ? att skatta 99 %:s-VaR utvärderas och jämförs.

Grundvattenmodellering i Badelundaåsen

Over an extended period of time there have been plans to establish a shared facility in Lennheden to extract groundwater from the Badelunda esker to provide drinking water for the cities of Borlänge and Falun. The city of Falun is dissatisfied with the quality of its drinking water and the city of Borlänge is concerned about the risk of contamination of its existing groundwater supply at its current location. To provide a basis for a decision on this issue, the company Midvatten AB has been commissioned to perform hydrogeological investigations in the area of Lennheden.The purpose of this thesis is to design a functional groundwater model of the area between Lennheden, place of planned extraction, and Övre Tjärna, place of existing extraction, to get a better understanding of the groundwater situation in the area. A groundwater model enables simulations of different scenarios in risk assessment and contaminant transport. The aim of the thesis is that the model can be used as an aid in Midvatten?s investigations in Lennheden and that it also can be used in future projects in the area.The model has been made in Processing Modflow 5.3 and encompasses an area of 19,5 × 11 km along the Badelunda esker and the river Dalälven between Djurmo and Frostbrunnsdalen.

Förstudie för en vindkraftpark på Malmölandet i Norrköping : En undersökning av förutsättningarna för en vindkraftpark på ett sen tidigare planerat område

This is a feasibility study that examines various aspects of building a wind farm on Malmön in Norrköping. The feasibility study deals with interests of conflict, park design, electrical connections, production calculation, financial calculations and operating- and timetable.The report is divided into two distinct parts. First a theoretical part, which deals with conflicting interests, park design and electrical connections. Second a part with simulations dealing with production calculations, and financial calculations.Opposing interests are mapped so that problem areas can be found, and help put focus on the right places at a future environmental impact assessment (EIA). There are a number of areas where planners have to assess on an EIA, this thesis point on the most important areas.

Konceptarbete om skidbalk i kompositutförande till BVS10

This thesis has been performed at BAE Systems Hägglunds, which is located in Örnsköldsvik. Hägglunds has a wide background of engineering, where they have manufactured all from airplanes to lifting cranes. Currently they only produce track vehicles at Hägglunds, where they manufacture the CV90 and BVS10 models. This thesis concerns the BVS10 which is an all-terrain-vehicle. The main purpose with the BVS10 is to enable transportation of material and personnel thru tough terrain.

Vätskekopplade värme- och kylåtervinningssystem Utveckling av ett verktyg för energiberäkningar

According to a decision of the European Commission, measures are to be taken to reduce the use of energy in the EU. The goal is to reduce it by 20 % compared to the current use. This shall be done to the year 2020 (European Commission, 2011). One industry that use large amounts of energy is the construction of buildings which account for almost a third of the energy use (Brogren, 2012). The major part of the energy that is used in the construction industry is not used when the buildings are built, but rather during the rest of their subsequent lifetime.

Källsorterade systems påverkan på avloppsreningsverk : växthusgaser, energi- och resursanvändning i modellstudie

The aim of this study was to evaluate the effects on a simulated wastewater plant regarding GHG emissions and use of energy and resources when implementing source separated wastewater systems. The effects were studied for different restrictions of effluent quality and for different temperatures on the influent. The simulation model BSM2G calibrated for Käppala wastewater treatment plant was used. The task was executed by simulating nine different scenarios with an increase in influent load from new connections equivalent to 3, 10 and 30 % of the present connections. These new connections were served by conventional, urine separated or black water separated systems.

<- Föregående sida 24 Nästa sida ->