Sök:

Sökresultat:

9116 Uppsatser om Measurement system - Sida 11 av 608

Mätning i nätstationer - nyttor och problem

The purpose of this study has been to investigate advantages and problems with distributionsystem metering in substations. This report is a study in cooperation with Göteborg Energi.The analyses in this report are made for GENAB, a subsidiary company of Göteborg Energi.To analyse advantages and problems in advance is interesting information for GENAB. Theresult of the report could be based upon whether installation of metering in distributionsubstations will be implemented and in that case which kind of measurement that is relevant.The most relevant and strategic place to implement measurement is at the distributionsubstations on the secondary side (400V), this is due to the placement of the currenttransformers. The measurements in this study involve current, voltage, power, power factor,temperature, energy and power quality.Measuring instruments that are relevant to implement are intended to measure current,voltage, power, power factor, energy and, possibly, power quality in the same measuring unit.It is desirable to have a measuring instrument that measures both energy and power qualitybut since it is most often a cost question, it can be established that energy meters have a lowercost.Metering in distribution substations gives a better illustration of the power network. Thisresults in many advantages for GENAB.

Enstudie om lågtempererat värmesystem i vägg : -Fokus på inomhusklimatet och energianvändning

Today the human being see energy as a matter of course but the resources that is used for extract energy is today not enough for the world demand. Of all the energy that is used in Sweden today approximately 40 % goes to the building stock. This number will most likely increase if not necessary actions will be made on the already existing building stock since new houses constantly are built which will be added up on the already existing energy supply. This takes cause of action on the already existing building stocks, to fulfill the demands of the future use of energy that has been set by the authority. At the same time the thermal conditions cannot be influenced by the necessary changes that must be made.

Ett ärendehanteringssystem för mobila enheter

The purpose of this project was to create a system which can handle issues, with other words an issue tracking system. The system must create issues, assign issues to a specific user and list all issues for each user. On top of that, each issue should have a log where users can log whatever they want.My part of this project was to implement a client which can fulfill this basic criteria (and a bit more if possible), and communicate with the server which has procedures to be executed by the client.This system is based on Android and has it purpose to be used by mobile devices which support Android. ?Ichnaea? as the system is called, is meant to be used by companies to have human interaction through the network..

Riskerar tatuerare hörselnedsättning i arbetet?

Purpose: To examine the hearing environment for tattoo artists regarding occupational noiseand to see whether tattoo artists are exposed to hazardous noise according to Swedish WorkEnvironment Authority regulations. Method: Using a dosimeter we measured a total ofseven sessions of approximately one hour on seven different subjects, located on five studiosin Gothenburg. As a complement we did also hand out surveys based on twelve questions toexamine habits, experienced sound environment and to see if there were any hearing relatedpatterns. Results:. Sound level measurements showed that the lower exposure action valueLpAeq,8h 80 dB(A) in one case was reached if applied to the average working time of sixhours.

Möjligheter att förutsäga kvävegödslingsbehov i höstvete med Yara N-tester

The Yara N-Tester is a handheld chlorophyll meter which can be used in several different crops as an aid to determine if there is a need of complementary fertilization with nitrogen (N) or not. If the crop requires more N the N-Tester will recommend an amount in kg per ha. The possibility to assess the need of N depends on the strong relation that exists between chlorophyll- and N-concentration in the leaves of plants. In the multiannual trial series ?Nitrogen to winter wheat at different soil conditions? measurements with the N-Tester was carried out at flag leaf emergence (GS 37). In this work the result of measurements, the NTesters ability to estimate the need of N in winter wheat, will be presented for the years 2008-2011.

Förvaltningsaktiviteter i verksamhetskritiska IT-system

Avsikten med vårt arbete är att undersöka vilka aktiviteter som en förvaltningsorganisation utför på sina IT-system och om det finns några skillnader i dessa beroende på om organisationen förvaltar åt sig själva eller om det utförs för kunds räkning. Detta som ett led i att ge de som arbetar med, eller kommer att arbeta med, systemförvaltning en inblick i eventuella skillnader mellan förvaltning av egna system och förvaltning av en eller flera kunders system. De slutsatser vi dragit ur denna undersökning är att det inte förekommer skillnader i vilka aktiviteter som ingår i förvaltningsarbetet, däremot varierar det i vilken utsträckning man väljer att utföra dem..

Styrmedel för att hantera kreditrisk: En fallstudie av Handelsbanken Sergel

The Swedish bank Handelsbanken has, according to their own way of measuring, been more successful than a weighted average of their competitors during the last 38 years. They have also handled the recent financial crisis, as well as the one in the 1990´s, better than most other banks. This paper studies their management control system at branch level in order to identify the controls which have been enforced to ensure that a low risk level is retained in the lending. The controls that have been identified are; (1) A decentralized organization with the offices as profit centers where the manager has restrictions regarding risk level and the results are measured as K/I (cost/revenue). (2) The absence of bonuses and individual follow-up regarding performance measurement.

IT-system och organisationsutveckling

This report describes work on the thesis ?IT systems and organizational development?. The work is carried out on Stocksbro Energi AB, during spring 2009. The company wanted better flow in their production but also review if the inventory management function located in Visma SPCS Administration 2000, could be used in the organization. Under the first part of this report the system were tested to ensure if the system would work together with the organization.

Vilken funktion har belöningssystemet i en organisations ekonomistyrsystem? : en jämförelse mellan två storbanker

Two of Swedens´s major banks, SEB and Handelsbanken, which appears in the same industry and have similar strategy. Both banks can achieve a similar result despite the fact that their reward system looks quite different. An issue that arises from this observation is the relative reward system to the rest of the economy control system.Our purpose of this paper is therefore to examine the reward system in the organization's financial management systems. We wonder if the reward system may be a function of economic control system, or part of the system, or perhaps made independent of the system and then gradually adapted?In our study, we choose to assume a reward system has three functions to manage, motivate and compose the employee group.

Eldistribution på offshoreenheter -Jämförelse av AC- och DC-anläggningar

Den här rapporten har som syfte att utreda vilket eldistributionssystem för offshoreenheter som sparar mest vikt och utrymme. De två elsystem som jämförs är GVAs standard system och Siemens Blue Drive System. Rapporten innehåller en teoretisk bakgrund för båda systemen och dimensionering av systemens kraftkablar samt beräkning av kabelvikter och komponentvikten för systemen. För att uppskatta kabel- rutter och längder kommer ritningsunderlag för GVAs offshoreenhet 7500 att användas.Resultatet visar att GVAs standard system är det eldistributionssystem som har den lägsta totalvikten med 168 ton, GVAs standard system har en vikt som är 101 ton lägre än Siemens Blue Drive System som har en vikt på är 269 ton. GVAs standard system har en lägre ström vilket gör att ledararean blir mindre och i med det blir kabelvikten mindre.

Släpslangspridning av gödsel, kan det löna sig? :

I have chosen to work with drag hose system and try to find an alternative to spread manure with a usually tank system, see if you can make a profit and what advantage and disadvantage the system has. The purpose whith the project has been to try to make a system that can spread manure at better occasions than farmers do today and above everything make a financial addition. Today it is just a heavy work and takes a lot of time. I have counted on investment costs and carefully examined what equipment you need. I have not the technical details in my project, I have just tried to understand how it is to spread manure with drag hose system today. What is drag hose system? You put a hose in your manuretank, connect it to a pump that is driven by a traktor or stationary engine. You place a hose that reach the field were you are going to spread.

Akustik och säkerhet i inomhusarenor

The background to the study is that within the next ten years about 50 new multi-purposeindoor arenas will be built. These are used for various events such as sports, concerts, etc. In order to achieve a high level of security in the case of danger alarm signals and alarmmessages must be heard well by the visitors. ÅF-Ingemansson wanted to show builders the importance of good speech perception and that it is not observed in arenas today. They conducted technical tests on two large multi purpose indoor arenas to develop parameters that affect speech perception in the arena.To get a subjective view of how these arenas are experienced a survey was created.

Definition av stötdämpares fyllnadsgrad

Shock absorber units play a key role in establishing the driving dynamics and performance of automobiles. Öhlins Racing has manufactured high-tech automotive shock absorbers for over 30 years. Öhlins Racing?s advanced technology has contributed to over 200 world championships in automobile racing. Öhlin?s manufacturing process has long utilized automated fluid filling equipment during the final shock absorber unit assembly stage. The filling process consists of vacuum pumping the shock absorber unit and subsequent transfer of fluid. Vacuum pumping is necessary to remove residual air from the shock absorber unit prior to initiating the liquid filling stage. The presence of undesirable gases drastically compromises the performance of a shock absorber. The filling degree, defined as the final ratio of air to oil, is determined by the specific filling protocol as well as the specific equipment utilized.The current investigation aims to develop a viable technique to accurately determine residual air content in shock absorber units. If the filling degree can be appropriately quantified for a specific manufacturing process, then the air/oil ratio may be quantitatively related to shock absorber performance. The utilized measurement method must be completely integrated into the manufacturing process to guarantee shock absorber performance specifications according to the manufacturer?s standards. By utilizing the measurement method developed in this work, the manufacturing process, manufacturing equipment and product specifications can all be tailored to provide improved filling conditions.The developed measurement method provides accurate quantification of the filling degree under a wide range of processing conditions. The method establishes the relative quantity of air in the shock absorber unit by performing in-situ compressibility tests. The fill ratio can be controlled and varied by manipulating the vacuum pressure exerted during the filling process. Performance tests, however, indicate no correlation between filling degree and unit performance..

Optimering av ett färdigvarulager

Den här rapporten har som syfte att utreda vilket eldistributionssystem för offshoreenheter som sparar mest vikt och utrymme. De två elsystem som jämförs är GVAs standard system och Siemens Blue Drive System. Rapporten innehåller en teoretisk bakgrund för båda systemen och dimensionering av systemens kraftkablar samt beräkning av kabelvikter och komponentvikten för systemen. För att uppskatta kabel- rutter och längder kommer ritningsunderlag för GVAs offshoreenhet 7500 att användas.Resultatet visar att GVAs standard system är det eldistributionssystem som har den lägsta totalvikten med 168 ton, GVAs standard system har en vikt som är 101 ton lägre än Siemens Blue Drive System som har en vikt på är 269 ton. GVAs standard system har en lägre ström vilket gör att ledararean blir mindre och i med det blir kabelvikten mindre.

3D modelling of a Laser Welding Cell for movie presentation : making of the movie

This report describes a Bachelor thesis work in which a robotised laser welding cell has been modelled and simulated for the purpose of making a presentation movie. The report shows that the work has been concentrated on making the movie from the modelling phase through the recording of the movie and ending up with the editing of the final presentation movie. A pre-study was made prior the Bachelor thesis work. In the pre-study a literature study was conducted about measurement and calibration of a welding cell. Measurement of almost all equipment in the entire cell was also conducted in the pre-study.

<- Föregående sida 11 Nästa sida ->