Sök:

Sökresultat:

12148 Uppsatser om Material flow - Sida 7 av 810

Vattenkvalité i Märstaån : Igenväxning som indikator på närsaltläckage och vattenstatus

The purpose of this study was to examine whether an inventory of the vegetation overgrowth could be used to indicate a locally nutritional impact. The study was conducted at Märstaån where the water runs through a number of agricultural lands that could lead to an increased amount of diffuse emissions of nutrients. The vegetation overgrowth in the water was also studied in relation to shade, meandering and water flow effects on the vegetation. With this method, no definitive conclusions could be drawn.Where the water was shaded, no vegetation overgrowth could be found. Therefor trees should be planted to prevent any future overgrowths.

The Game of Flow : En studie över spelandets effekter på reaktion, minne och perception

I denna studie är syftet att belysa vilka effekter som underhållningsspel kan ha på motivation och koncentration samt även undersöka om spel kan användas för att förbättra den kognitiva prestationen. Konkret ställs frågan vilka förändringar som sker i reaktion, korttidsminne och perception efter att ha spelat Gradius 3 samt vilka orsaker som ligger bakom dessa förändringar. Resultatet pekar entydigt mot att spelandet har en positiv effekt och förbättrar den kognitiva förmågan. Särskilt när det går bra i spelet och man får ett flow kan prestationen maximeras, vilket överensstämmer med Csíkszentmihályis flowteori. Det flow som uppstår i spelet ger en euforisk känsla av tillfredsställelse som stimulerar motivation och koncentration, vilka båda är förutsättningar för bättre prestation.

Till  framtida utvecklare

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

LSD - Hallucination eller flödeseffektiv innovation

Increased competition in the IT industry has sparked a need for developing faster innovation processes with more predictable output. One of the biggest issues when it comes to achieving a faster flow through the innovation process lies in managing its high degree of variation. Proposing a solution to this problem, Lean Software Development (LSD), was developed to provide a framework for how IT companies should organize its software development process to achieve increased speed and quality. This study examines to which extent LSD, as a set of values, principles, methods and tools, can be used to improve flow efficiency in the innovation process. A case study of a multinational IT company was made by conducting ten semi-structured interviews with current employees.

Mätning av abrasivflöde för vattenskärningsmaskiner

The content of the following report is the summarized result of three students thesis at Blekinge Institute of Technology in co-operation with Water Jet Sweden AB. This report will give the reader a description of principles how to measure the abrasive mass flow in a waterjet cutting system. The work began with a visit to Water Jet Sweden AB to get a closer look at the problem. When the analysis of the problem was done the criteria were defined in the form of demands and desires. The main task of the criteria was to guide the search for the solution.

Separeringsmodul

In cooperation with the Gislaved company Lerocon AB [1], a separation module wasdesigned as a further supplement to the Module System. The aim of theprojectimplementation was that the separation module could be flexible enough to feed themetal pieces, screws, nuts and other items with large variations of size, appearance andmaterial composition. The module should also be cost effective to manufacture.A separation module is a design which is ment to streamline the work in industries withautomation of the lineoperations. The module feeds the details such as screws, nuts, washersand pieces of metal in a continuous flow in which traps separate the details from each other.Traps may vary depending on the purpose and of the details that are fed. Perhaps it isimportant for the user that the detail-orientation is right after the separation module, whichmeans that all the pieces witch aren´t are fed back in return.For companies and industries in lineoperations that can be made more efficient withautomation, are production flow an important watchword.

Älgarås avloppsreningsverk- studie och metodisk felsökning av en biobädds BOD-rening

Wastewater contains biodegradable materials, which are often measured as BOD7.Trickling filters are sometimes used as a purification step for BOD-reduction. Atrickling filter is a tower, which is filled with a carrier material. Microorganisms growon the carrier material in the form of a biofilm. This biofilm consists mostly of bacteriathat purify water from BOD.In Älgarås? wastewater treatment plant the water is purified by a trickling filter.However the treatment plant has difficulties reaching the emission requirements forBOD.

Elevers förståelse av fotosyntesen och dess koppling till andra organismer

The effects of the deregulation of the electricity market 1996 in Sweden on short-term hydropower regulation are unknown. This report investigates patterns in subdaily regulation in the Ångerman River Basin during the period 1993-2011. Differences in subdaily flows and zero flow events between the periods 1993-1995 and 1996-2011 were studied by analyzing hourly data from 8 regulated and 8 unregulated locations with four subdaily flow variation indices. No correlations between the market deregulation and the regulation intensity in the Ångerman River basin were detected. The number of days natural ranges of variability were exceeded and the magnitude of subdaily variation were significantly higher at regulated locations.

Modellering av ett bränslesystem i Modelica : tillämpat på ett obemannat flygplan

Mathematical models possible to simulate are of great importance in order to make successful projects in the aircraft manufacturing industry. An aircraft fuel system is very complex, containing pipes, tanks, orifices, valves and pumps. The principal of this thesis is using the tool Easy5, which no longer is considered reliable enough in terms of development and support. This thesis tries to evaluate the Modelica language as a possible alternative to Easy5. To make this evaluation, the components concerned in the fuel library in Easy5 are implemented to the Modelica language.

Opera i Stockholm : Stadsgårdskajen

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Mätning av abrasivflöde för vattenskärningsmaskiner

The content of the following report is the summarized result of three students thesis at Blekinge Institute of Technology in co-operation with Water Jet Sweden AB. This report will give the reader a description of principles how to measure the abrasive mass flow in a waterjet cutting system. The work began with a visit to Water Jet Sweden AB to get a closer look at the problem. When the analysis of the problem was done the criteria were defined in the form of demands and desires. The main task of the criteria was to guide the search for the solution. The work proceeded with an extensive search for abrasive flow meters along with obtaining information about flow measurement in general. When the search for abrasive flow meters resulted in nothing all the efforts were concentrated on finding a principle of measurement that could cope with the criteria.

Materialdistribution i ett tillverkningsföretag : en fallstudie av PartAB

The purpose of this project is to study Partab's material distribution process, furthermore identify critical problem areas within the company. Further the aim is to provide suggestions to new work procedures regarding material distribution and related processes. Appropriate literature has been used as a support in this process. The main goal of a commercial company is to generate cash flow, and maximize the return on investment. Streamlining material supply and the use of material is a part of this process. Virum and Persson define logistics as: "Logistics is the approach and principles founding the process of planning, development, coordination, organisation, management, and control of material distribution from supplier to user".

Översvämningsrisker längs Funboån

Flooding events are no longer rare, floods occur all over the world. Accordingly, it is vital for the society and different authorities to work with flood mapping. To meet the goal of Uppsala kommun to map the risks of floods in Uppsala län, a map of the different areas around Funboån which are inside the area of risk for flooding have been developed.In the work, cross sections and the water flow have been measured. Moreover, an echo-sounding have been carried out in Funboån to map the bottom topography. From the bottom map and laser scanned data covering the study area, a terrain model was created.

Bristidentifiering & effektivisering av materialförsörjningen på SAAB Microwave Systems

 Saab Microwave Systems (SMW) is a business unit within Saab AB that manufactures and develops different types of radar- and sensor systems for naval, airborne and ground based forces as well as within the market for civil security. In addition to the manufacturing of radar and sensor systems they also provide different types of service concepts. The business unit has 50 years of experience within the area of developing radar systems and is considered to be one of the market leaders. When applying an assemble-to-order production strategy with products at this level of cost price the product lead-time is vital and becomes an important part of the strategy within marketing and sales. Within SMW there is a new department called Supply Management (SM) that provides the supply of incoming and outgoing material. Within SM there are four sub-departments working with activities such as planning, purchasing, receiving inspection, storage and distribution.

Del projekt inom ClampCal - Utvärdering av mätmetoder för temperatur, viskositet och densitet samt röregenskaper

The dissertation were performed on SP, Technical Institute of Sweden. The dissertation were carried out on the measurement technical department, this dissertation is a part of a bigger project, project ClampCal. One of SP?s returning assignments are flow-measurement. When flow-measurement is performed, the flow has to be stopped so that a meter can be installed in the pipes where measurement is going to take place. At every stop there is time delay in the flow which causes the customers to loose money. This is why SP wanted to find a better solution so that measurement can be done without any stops in the flow. Usage of a so-called Clamp-on meter was considered, but since the measurement uncertainty is too large it takes some investigation on the parts where the largest uncertainties occur and thus find a solution that can diminish the uncertainty as much as possible. The parts that were considered to have an opportunity to reduce measurement uncertainties were the fluid temperature, its characteristics and the pipe geometry and its characteristics. For the fluid temperature a Pt100-sensor with four different radii for various pipes was used.

<- Föregående sida 7 Nästa sida ->