Sök:

Sökresultat:

1430 Uppsatser om Logistics costs - Sida 6 av 96

Vad kostar en förlorad apotekskund - en estimering av bristkostnaden för receptbelagda läkemedel på ett konkurrensutsatt apotek i Sverige

After the deregulation of the Swedish pharmacy market customers can be lost due to stock-outs. Optimization of pharmacy inventory levels has thus become increasingly important. To minimize inventory costs while considering the cost of shortages the latter must be estimated. However, the shortage cost is very difficult to compute. Thus, the aim of this paper is to estimate the pharmacy-specific shortage cost parameter and its relation to other inventory costs.

Jämförande kostnadsanalys av retur- och engångsemaballage

This report analyzes disposable packaging and returnable packaging with the methods life cycle analysis and life cycle costs analysis. These two different packaging are analyzed through the company Clas Ohlson?s packaging-flow. To get a picture of how the flow works, a visit at the company and email contact have been done with Clas Ohlson to get relevant informationToday Clas Ohlson has a big flow of articles to the stores without larger variations in the demand, with the exception of autumn, which is when customers start shopping for Christmas. Clas Ohlson?s articles are placed on a pallet and are wrapped into plastic-film for protection and to make sure that nothing will be stolen.

Backsourcing : om dess orsaker, syften och alternativ

This paper examines the reasons behind firms considering backsourcing. While firms experience problems with their outsourcing activities, backsourcing emerges as an alternative solution. Firms primarily take cost considerations into account when reconsidering their outsourcing practices, but this only scratches the surface. A deeper analysis is needed, since cost increases arise from issues such as quality defects and cooperation problems. Even though production costs are low, outsourcing always implies transaction costs.

Utformning av sidoområden med hänsyn till vägens livscykelkostnad

Single vehicle accidents are one of the most common types of accidents that occur on the Swedish road network. Depending on the design of the road, the presence of a crash barrier and embankment on the roadside, the outcome of a roadside collision can lead to serious injuries and even deaths.The aim of this project is to investigate the possibility of improving road safety by designing the optimal roadside area based on the results of a life cycle cost analysis (LCC).The questions that have been answered during the duration of this project are:1) Describe the current technical solutions for roadside area design and the various barrier types used in Sweden.2) Complete an existing mathematical model that has been developed by Hawzheen Karim, for calculating life-cycle costs for various roadside areas.3) Calculate and compare the life cycle costs for the side area with a barrier and without a barrier.By performing an analysis of the documentation on the current guidelines and rules for shaping the roadside, was it possible to describe the current technical solutions for the formation the roadside as well as the current roadside barriers in use today. A mathematical model for calculating the life cycle costs of different barrier types had already been developed by Hawzheen Karim. This model was supplemented so that it could calculate life-cycle costs of the roadside region with and without a barrier. After the model was completed, an analysis was performed to obtain life-cycle costs of a roadside with and without a barrier.The result showed that there is a clear relationship between the slope inclination, fill height, and the rate at which the costs rise.

Tredjepartslogistik ur ett sakrättsligt perspektiv

It has become fairly common for a company to outsource one or several of its logistic activities to a party separate from the business of the company itself. Since the original agreement usually involves two parties, the seller and the buyer, the logistics company is called the third party. The relationship between the outsourcing company and the third party varies in form and in depth but can sometimes be very close, almost to be considered a joint venture. When the co-operation between the two parties includes more than just one separate logistic service and the third party adapts its business to a certain extent to his principals needs, it constitutes third party logistics. If the logistics company, or a party employed by it, becomes insolvent when having the entrusted goods in his possession questions may arise concerning the right to the property.

Den vägda nyttjandeperioden och dess effekter på utvalda finansiella nyckeltal: En studie av bostadsrättsföreningars avskrivningstider på byggnader

Housing cooperatives in Sweden practice very long depreciation times for their buildings and assets, subsequently depreciation costs are very low. This study aims at addressing issues relating to potential upward revisions of these costs and the revenue levels needed by housing cooperatives to address these changes, while also providing a detailed summary of some chosen financial ratios under different circumstances. This study's results are based upon recent (2015) market data within the Stockholm region, collected through a manual process and analyzed quantitatively. On average, housing cooperatives EBIT do not cover their financial costs and have low profit margins. The average depreciation time is considerably above what a technical evaluation by other sources may state.

Göta älvbron, övervakning med optisk fiber : Ekonomisk analys

The Göta älv-bridge is a welded steelbridge which is located in Gothenburg,it connects the inner city of Gothenburgwith the island Hisingen. Cracks wasdiscovered in the steel in 1999-2000which started an investigation of thebridge to clearify the condition of thebridge. The conclusion was a monitoringsystem based on laser light sent throughan optical fiber.This report describes the bridge, thedamages, the monitoring system and thetraffic on the bridge.Stefan Pup, at Vectura Borlänge was mysupervisor during this work. In myinvestigation the costs of themonitoring system and the costs ofclosing the bridge is compared andevaluated. The biggest investigatingpart is the costs of closing the bridge.The results of my investigations is thatclosing the Göta älv-bridge would cost 1107 300 SEK / day.

Gröna transportkorridorer

The economic development and competitiveness in Europe is heavily dependent on an efficient transport system. Movement of goods and people is essential for a competitive industry and successful trade. As a result of an intensified transport business, consumption of fossil fuels has increased dramatically. As a consequence, there are increased emissions of dangerous greenhouse gases. Transports are often mentioned as an area with high impact on the environment.

Leverantörsrelationers betydelse : en fallstudie på Scania och två av dess underleverantörer

One of the most distinguishing features for companies today is that they must have a close collaboration and keep up a good relationship with their suppliers. This is important for the companies chance of survival and for them to compete in their markets. This essay will discuss the subject of Scania?s long-term collaboration with their suppliers. The purpose of the essay in this case study is to analyze if a long-term cooperation with a supplier is of essence upon renegotiations of continued collaboration.

Utformning av ett performance management-system : Fo?r ma?tning av prestationer inom Rottne industris reservdelslager

Bakgrund: Rottne industri a?r ett fo?retag som tillverkar skogsmaskiner, na?rmare besta?mt sko?rdare och skotare. En viktig del av fo?retagets strategi i dagsla?get grundar pa? att bedriva en genero?s reservdelsverksamhet ut mot kunder. Reservdelsverksamheten har vuxit och blivit en konkurrensfo?rdel fo?r Rottne industri.

Kostnader att ta hänsyn till i samband med implementering av nytt ERP system

Abstract ? ?Costs to consider in connection with the implementation of a new ERP system?Date: January 8th 2013Level: Master thesis in business administration, 15 ECTSInstitution: School of Sustainable development of society and technology, Mälardalen UniversityAuthors: Sanna Hellblom-BjörnTitle: Costs to consider in connection with the implementation of a new ERP systemTutor: Cecilia LindhKeywords: ERP-system, business system, implementation, implementation costsResearch question: What costs and issues should companies take into account in order to  establish a realistic budget in connection with the implementation of a new ERP system, and increase the chances for a successful implementation?Purpose: The purpose of the paper is to investigate the hidden costs that may arise in connection with the implementation of an ERP system that companies should take into account in order to establish a realistic budget. The paper will also examine how companies can reduce their costs and affect the outcome of the implementation. It should be investigated by means of interviews, reports and articles.Method: In order to answer the question in the paper secondary data is collected in the form of articles, books and reports. Primary data was collected through interviewing a company that has implemented a new business system, a company that performs implementations and a Senior manager of ERP Services.

Fördelning av samkostnader - En studie över hur svenska energibolag fördelar samkostnader mellan el och fjärrvärme i ett kraftvärmeverk

Cost allocation ? a study of how Swedish energy companies allocate costs between electricity and district heating in a combined heat and power plant District heating is today the most utilized alternative for heating in Sweden. In a combined heat and power plant (CHP) electricity and heat are cogenerated. The environmental and economic advantages with this kind of production are high. A problem in a CHP-plant is to allocate costs between electricity and heat since both products are generated in the same process.

Managing IT Costs with ABC - An empirical study av Toyota Industries IT Supply Europe

The purpose of this essay is to apply Activity Based Costing on a Service and Support function in order to identify and allocate costs for providing support for IT deliverables..

En analys av kostnadseffektiva metoder för inköp och logistik

This thesis aims to find a more cost effective model for purchasing and logistics at asmall company. The studied company is a BMX (bicycle motocross) and MTB(mountain bike) retailer. The questions to be answered are: How large parties shouldbe ordered and what mode of transportation is to be used? A literature orientation ofthe field was followed by visits to the company, obtaining information from twodifferent logistics companies and interviews of four other companies in the sameindustry. The study shows that it´s difficult to develop an optimum order quantity fora small company since there often are other factors affecting how large amountshould be ordered.

Inköpsoptimering och kostnadsreducering

This thesis has been carried out at Diac Metal AB at Torsvik outside of Jönköping. The company produces parts for, amongst others, office furniture and store equipment. The essay will be concentrated on one detail which is included in many of their products.Today the company uses an ordering quantity based on experience which is rarely updated. Furthermore the operations are performed in both the company?s own engineering workshop but also an external workshop.The purpose with the report has been to check whether an updating of today?s batch shaping and ordering system can mean simpler storage control and possibly cost reduction.

<- Föregående sida 6 Nästa sida ->