Sök:

Sökresultat:

1371 Uppsatser om Lighting solution - Sida 7 av 92

Monteringslösning till dörrkarm

Dooria Sweden AB is one of the main door- and doorframe manufacturers inSweden. They deliver door frames for indoor use for project oriented buildingsites, for these types of building sites the doorpost comes pre-assembled. DooriaAB wants to minimize transport to reduce impact on environment and thetransportation costs of pre-assembled doorframes, this thru simplifying themethod of assembly.The main purpose of this thesis has been to develop a prototype solution thatbrings the three parts of the doorframe together with the same properties regardingstability and tightness of joints as the current method of assembly. A profile ofdemands and wishes were created in collaboration with Mårten Dragstedt, DeputyDirector of Dooria Sverige ABBy following the chosen method the authors have been able to produce a fullyfunctional prototype that meet the demands that were put on the product. Catia V5R20 has been used as an aid during prototype construction and virtual tests.

Utveckling av golvlucka för hoppgropssystem i kommunal idrottshall

In this thesis a concept for floor hatches for foam pits has been developed. Since there is an existing solution that is powered by hydraulics and is expensive, the goal was to develop a cheaper solution, as simple as possible.A number of different concepts were developed and evaluated. A concept with five sections that are pulled to the side and stacked on each other was chosen as it was thought to have the lowest risk of crush injuries and to be easiest to manage and control. In the opening behind the foam mattress a lifting table is placed to regulate the height of the stacked sections.To be allowed to be installed in the floor of sports halls the sections must be dimensioned according to the construction standards for these types of buildings. Different dimensions of beams in steel and wood materials were evaluated and of those, who lived up to the requirements of the standard, a concept was chosen.

Derivatinstrument för prisriskfördelning på villafastigheter. - En undersökning av förutsättningarna på den svenska fastighetsmarknaden.

This paper is concerned with surveying the possibilities of implementing a futures market based on the valuation of non-commercial real estate in Sweden. We base our survey on a theoretical speculation of how such a market would operate and what instrument would best suit the marketplace. After reaching our solution we survey key experts to receive their feedback on our suggested solution. Their feedback includes, who are potential operators on this market and their motives, possible effects of such a market on the real estate market and other aspects of society..

XML som informationsbärare för EDI

Information handling has been a key issue for different companies for a long time. Electronic Data Interchange (EDI) is used to transfer different business documents from one company to another. This is done in such way that the information itself is separated from how this information is stored and handled in the companies internal systems. As different companies have different systems there is a need for a standardised format for this exchange. There is a big difference between EDI-systems based on what kind of EDI-standard is used.

Utveckling av produktionslina

The company is currently in a stage of improvement and has therefore taken the help of students at School of Engineering, Jonkoping University. The current production is batch, production layout is fixed. A bottleneck is created after the first station which leads to large efficiency loss.  The meaning of this report was to provide a layout suggestion with balanced workstations to a new production line. The conditions were that the production line would be one-way, driven by customers order and meet a demand of 40 products per week.

Påbyggnadsskåp till lastbil med pneumatisk öppning

This project have been made whit Krima Rostfritt AB. They manufacture a number if different add on products for trucks and now wants to develop there locket were the hatch opens upwards after requests from customers. The costumers have requested a pneumatic opening to make the opening procedure easier.Krima has there biggest markets in Sweden and Norway, because of that the locket has to meet whit the regulations of these countries. The locket also has to meet the demands that Krima has determined from experience to maintain there high standard.The project has resulted in a solution where the locket and cylinder are linked whit a strut. This solution was the one best suited for the task and the one that Krima preferred..

Energibalans Dåva Kraftvärmeverk

To be able to measure high-surge voltages and transients with short rise times youneed measuring instruments with a high sampling frequency and large Bandwidth.These surges and transients occur primarily at lightning but can also occur at forexample at connecting errors at an electrical switch-gear. This report describes thework with finding two solutions for measuring and log data from these surges andtransients. One temporary solution where a measurement program has beendeveloped. A second solution where different company solutions have been analyzedto decide which fits best. For these measurement solutions two solutions for bringingdown the voltage has been used.

Lönsam energieffektivisering : Ett samarbete mellan ÅF och kund

This thesis project has focused on studying ÅF?s business concept Energy Collaboration, which is their way of selling energy efficiency services. Thereforeongoing projects have been analyzed. The purpose was to determine achieved energy efficiency, costs and profitability for the studied projects. It was concluded that the Energy Collaboration is a good way of selling energy efficiency services, since the customer takes no risk and energy savings of about 15-25 % can be achieved with simple measures.

Mät och loggningsutrustning för spänningstransienter.

To be able to measure high-surge voltages and transients with short rise times youneed measuring instruments with a high sampling frequency and large Bandwidth.These surges and transients occur primarily at lightning but can also occur at forexample at connecting errors at an electrical switch-gear. This report describes thework with finding two solutions for measuring and log data from these surges andtransients. One temporary solution where a measurement program has beendeveloped. A second solution where different company solutions have been analyzedto decide which fits best. For these measurement solutions two solutions for bringingdown the voltage has been used.

Software keystroke logging : Automatisering av skydd mot software keystroke logging

This piece of work develops a solution that automates protection against software keystroke loggers. Keystroke loggers can be used illegally to register a user's keystrokes and in that way acquire sensitive information. The solution was tested on two different networks and the efficiency was measured. The network represents an enterprise network that uses the operating system Windows along with the directory service Active Directory. A script was developed to solve the automation matter.

Utvärdering av Skvallertorget i Norrköping

This thesis is an evaluation of the new traffic solution at ?Skvallertorget?. The innovative theory behind it is to increase traffic-safety by introducing insecurity feelings for road-users. The conclusion of the evaluation is that the newtraffic solution is well adjusted according to guidelines for municipal traffic planning. The evaluation also illustrates the conflict between traffic planners deliberate attempt to avoid clear information and the road users wish to get it.

Användarrelaterad energieffektivisering : En studie på länssjukhuset i Sundsvall

Energy efficiency is important both to reduce costs and to reduce greenhouse gas in the atmosphere. In Sweden 40 percent of the energy consumption is related to the buildings sector. Hospitals are complex buildings with different activities in the same building, which requires flexible technical systems for ventilation, heating and lightning. A quarter of the total energy consumption in Swedish hospitals is related to user activities in the hospitals. Therefore it is not only important to work with operational optimization but also to change user activities, to reduce energy consumption.The objective of this thesis was to examine the user-related energy efficiency work at two care units, at the central hospital in Sundsvall within Västernorrlands County.

Den byggda utemiljöns betydelse för människors motionsvanor : -Sett ur ett hälsopedagogisk perspektiv

AbstractIn order to investigate whether people living in Linköping city feel that the built environment affects their exercise habits, a quantitative cross-sectional study with qualitative elements was conducted. A questionnaire was the chosen approach in which information about exercise habits, education level, built environment was requested. The selected group was people working at Skatteverket in Linköping where many people work and where age, gender and education level varies. The built environment does affect the exercise habits, where major proportions choose to exercise in areas considered inviting. The majority of the respondents had a tertiary education, and many lived in the city of Linköping.

Förbättring av dockning mellan lastvagn och autoklav

At present Getinge can offer a new generation of trolleys that they produced in 2011. The trolley used to Getinge various autoclaves and has the primary task to help the user/sterilization personnel to transport shelves or baskets, with or without cargo, from a packing table to the autoclave. The purpose of this thesis has been to develop a primary solution how the docking process between Getinge trolleys and autoclaves can be improved. The work has in most part followed Fredy Olsson principle and primary construction method. The work has included product research, study visit and development of a requirements specification, to satisfy Getinge, their clients and circumvention products requirements.

Mät och loggningsutrustning för spänningstransienter

To be able to measure high-surge voltages and transients with short rise times youneed measuring instruments with a high sampling frequency and large Bandwidth.These surges and transients occur primarily at lightning but can also occur at forexample at connecting errors at an electrical switch-gear. This report describes thework with finding two solutions for measuring and log data from these surges andtransients. One temporary solution where a measurement program has beendeveloped. A second solution where different company solutions have been analyzedto decide which fits best. For these measurement solutions two solutions for bringingdown the voltage has been used.

<- Föregående sida 7 Nästa sida ->