Sök:

Sökresultat:

33 Uppsatser om Interruption - Sida 3 av 3

Risk- och sårbarhetsanalyser för smarta elnät

The electrical grid needs to be changed in the future in order to manage more distributed and renewable generation and also to make it possible for electricity consumers to be more active and aware of their electricity consumption. This future grid is usually referred to as a smart grid. With the transition to a smart grid, new challenges occur. One method to determine those challenges is to perform risk and vulnerability analyses. InStockholm, the new urban district Stockholm Royal Seaport is built.

Nollföljdsmodellering av transformator-Beräkningar av följdproblem vid ökad kablifiering på mellanspänningsnivå

Historically transformers with system earth equipment have been modeled as open circuits in zero sequence. This approximation has been satisfying, but lately it has been discovered that equipment on one side of the transformer have responded to faults that occurred at the other side. Most of these problems took place when the majority of the system on the secondary side of the transformer contained cables. These findings have led to questioning whether or not the former model of the transformer in zero sequence is correct. This report investigates if it is necessary to represent the transformer in zero sequence in another way than it is usually done today.

Analys av fysiskt och administrativt flöde för provhantering vid Höganäs AB

In this project, we are studying the material flow and the information flow of sample materials and the appurtenant report of deviation for the purpose to be able to suggest better solutions. The sample material, which is to be analysed, is to be continuously taken from the production flow. The purpose is to navigate the process by the results found by the analysis. Because of this, it's very important that both methods of analysis are ensured and that the sample material is representative for the production flow. However, even more importantly, is that activities and transportations, combined with both flows, must perform in a quick and correct way in order to maintain or improve Höganäs AB's competitive strength.According to reports are about 20 products per day not available, for loading, at the time of delivery.

<- Föregående sida