Sökresultat:
690 Uppsatser om Infra heat camera. - Sida 7 av 46
Väggjutning med självkompakterande betong : Vad påverkar gjutresultatet?
AbstractThis master thesis was performed at Scania transmission department in Södertälje, where the manufacturing of gears is done. Today a large amount of manual handling is performed between the machining and the hardening process. Most of the manual handling is done at the heat treatment department. The purpose of this master thesis is to give a suggestion on how to reduce or eliminate the manual handling at the heat treatment department. The possibility to use the same packaging throughout the processes will also be investigated.
Energimässig jämföelse med investeringskalkyl av två förskolor
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Turbinkretspump system - Kraftvärmeverket i Borås
The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.
Robot-Assisterad Gradningscell med Force Control
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Förbättrad tillgång till referensmaterial vid röntgentolkning
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Hantering av kugghjul : -Vägen från mjukbearbetning till hårdbearbetning
AbstractThis master thesis was performed at Scania transmission department in Södertälje, where the manufacturing of gears is done. Today a large amount of manual handling is performed between the machining and the hardening process. Most of the manual handling is done at the heat treatment department. The purpose of this master thesis is to give a suggestion on how to reduce or eliminate the manual handling at the heat treatment department. The possibility to use the same packaging throughout the processes will also be investigated.
Utvärdering av magnetiska alternativ till optisk scanning
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Överdrift i animation : Karaktärsanimation ur två kameraperspektiv.
I animation för film kan regissören ändra kameravinkel för att en karaktärs känslor ska förmedlas på ett tydligt. i ett spel har ofta spelaren kontroll över kamerans position men kan i vissa fall inte ändra kameravinkeln. I det här arbetet undersöks om en spelkaraktärs rörelser måste överdrivas mer i ett spel som använder Free Roaming Camera än i ett spel som använder First Person Perspective. En karaktär i ett tänkt spel animerades med olika grad av överdrift för att förmedla ilska. Animationerna visades sedan för ett antal informanter som fick bedöma hur trovärdiga de upplevde animationerna samt ange vilket sinnestillstånd de upplevde att karaktären hade.
Hur byggnadsdetaljer ändrar fasadens uttryck
An energy study has been performed on two blocks in an area called Gävle Strand. The buildings are owned by a tenant-owner?s association called brf Carolina and were built by the company Skanska 2008. The builder as well as brf Carolina are pussled by the fact that electricity use is higher than expected while heating is less. Skanska is also very interested in finding out how much heat recovery from stale exhaust air through a geo-thermal heat pump is contributing to the general heating requirement and energy balance in four out of the ten buildings located on the properties.To find possible answers to the higher electricity use a literature survey on user behaviour was conducted.
Cellulosa : en alternativ isolering med hänsyn till brand och fukt?
AbstractThis master thesis was performed at Scania transmission department in Södertälje, where the manufacturing of gears is done. Today a large amount of manual handling is performed between the machining and the hardening process. Most of the manual handling is done at the heat treatment department. The purpose of this master thesis is to give a suggestion on how to reduce or eliminate the manual handling at the heat treatment department. The possibility to use the same packaging throughout the processes will also be investigated.
Värmeslag hos hund : Förebyggande åtgärder, djurägarråd och omvårdnad
The objective of the essay was to identify the nursing care required by a dog suffering from heat stroke and how to educate and advice the owners how to start treating their dog and prevent the condition from occurring in the first place.
The essay is based on a literature study. Several databases were searched for scientific research to try find answers to the issues. Keywords concerning the subject were used and mixed in different combinations to sort out the suitable studies.
The results of the study indicate that the dog should be cooled by the owner directly after detection. The most crucial issue is to reduce the body temperature as quickly as possible or the morbidity will worsen.
Kravspecificering av avgaspannor
This report describes the work of developing a specification of requirements for Waste Heat Recovery Units. The main part of the paper describes how the work with the specification of requirements has been performed. One specific question to be answered is:What are the customer?s demands in case of properties for the Waste Heat Recovery Units and how is that information collected as an order documentation to suit the business area Oil & Gas?The report begins with a description of the assignment and continues with the aim and background. A theoretical part describes the different areas and methods that have been important during the process.
Energieffektivisering genom förvärmning av flis till kokare med sekundärvärme
The Swedish pulp and paper industry meets higher demand for energy efficiencyi mprovements with increasing energy prices and changes in the Swedish renewable energy certificate system. One action of energy efficiency improvement is by using secondary heat, that otherwise would have been treated as waste heat, for use in a system with lower temperature demands. The aim of this Master´s thesis is to identify possible secondary heat sources in a typical Swedish pulp and paper mill and to investigate what economic benefits the secondary heat will provide when being used for pre heating of wood chips to a kraft digester.The Master´s thesis focuses on three secondary heat sources; dry warm air, warm water and moisture saturated warm air located inside the pulp or paper mill. Two types of kraft digesters are simulated within this study, a typical Scandinavian digester and a modern twin vessel steam phase digester.Due to quality aspects and low temperature level drying is the drying technology with dry warm air rejected. Using warm water in direct contact with wood chips increases the quantity of water to the evaporation plant and thus reduced pulp or paper production and is therefore also rejected.
Analys av off-design prestanda för ett absorptionskylsystem
This master thesis project at KTH is performed in the Mechanical and Aerospace Engineeringdepartment at University of Florida (UF). The thesis is a small part of a gas turbine researchproject where a vapour absorption refrigeration system (VARS) and a high pressure regenerativeturbine engine (HPRTE) are integrated together. The main objective is to build a computermodel of the VARS. The computer model is supposed to be used to analyse the off-designperformance of the VARS and should also be easy to integrate as a subroutine in a more complexsystem model. To model the VARS some knowledge of the absorbent/refrigerant mixture had tobe well known, in this case a mixture of ammonia and water.
Analys av energianvändningen i kvarteren Carolina och Jenny : en fallstudie
An energy study has been performed on two blocks in an area called Gävle Strand. The buildings are owned by a tenant-owner?s association called brf Carolina and were built by the company Skanska 2008. The builder as well as brf Carolina are pussled by the fact that electricity use is higher than expected while heating is less. Skanska is also very interested in finding out how much heat recovery from stale exhaust air through a geo-thermal heat pump is contributing to the general heating requirement and energy balance in four out of the ten buildings located on the properties.To find possible answers to the higher electricity use a literature survey on user behaviour was conducted.