Att prognostisera avverkningspotentialen i privatskogsbruket
For the actors in the Swedish forest industry, it is important to have the ability to forecast the state in the privateforests. The information that comes out of the forecasts will be the base for the activities strategic direction.The aim in this exam is to survey what information that is present today as basis for forecast calculation, andeven to examine what other possibilities it might have in the future.From a limited geography and out of different time perspective forecast the felling potential in the privateforestry.With the word felling potential means regeneration felling and thinning. The exam will answer the questions:What information is needed to build a relevant forecast model?Is this information available today?Is there information to buy that would improve the forecast model?The result of this exam will be presented in form of a ”case study” showing the opportunities in the market tocreate a forecast calculation of felling potential in the private forestry within the Forest Owners’ AssociationMellanskogs wood-area Dalarna..
The Future of ABC at Sandvik Tooling
Abstract Title: The Future of ABC at Sandvik Tooling ? Incorporating ABC with information systems in order to drive business development from a cost point of view. Authors: Jenny Andersson and Camilla Salomonsson. Supervisor: Charlotta Johnsson ? Department of Automatic Control, Lund University.
Demonstrationsprojektets roll i framväxten av ny teknik: Fallstudier av två vindkraftprojekt
This report describes a synchronous machine model with magnetic saturation in d-axis, neutralconnection and electrical exciter interface for the transient simulator PSCAD/EMTDC. It hasbeen designed and verified in comparison to the regular machine model in EMTDC.The performance of the model is very good when incorporating a linear as well as a saturatedmagnetising inductance. The dynamic deviation is only thousandths to ten thousandths perunit. By using a cubic interpolation of the saturation curve, the model gives a good representationof the saturation effect. The open source code implementation of the synchronousmachine model gives the possibility to easily adapt the model to specific requirements.The derived model makes it possible to simulate a synchronous machine with its excitationsystems, e.g.
Modellering av en panna med rörlig rost :
The aim of this master thesis was to create a dynamic model for the processes in a solid fuel boiler of the moving grate type. Another aim with the model was to keep it as simple as possible but still able to catch the dynamics of the processes in the bedplate of the boiler. The creation of the model had its origin from drying and combustion equations used in earlier modeling work of boilers. The represented model has been used to simulate different kinds of disturbances in a boiler and different ways to control the boiler. These tests show that controlling a number of parameters in the bed of the boiler is an effective way to keep the grate stable during disturbances.
Inventering av processvattenbalans : fastställande av fjärrvärmedistributionens läckage inom Vattenfall Värme Uppsala AB
Heat is distributed to the district heating customers through pipes with water as a heat carrier. The district heating system is complex. To decide what is leakages from the district heating net versus what is the water consumption of the plant, is difficult.
Therefore, the purpose of this master thesis is to establish a model where the district heating net?s leakages but also the water consumption of the plant can be followed
daily. The project is performed at Vattenfall´s district heating power plant in Uppsala.
Information is gathered through discussions, drawings of the plant and guided tours of the plant.
Adaptiv katalysatormodell för reglering
This master?s thesis describes the development of a model of the catalystsystem aiming at control by an MPC. A well functioning model, which is suitable in control purpose, is important while emission legislation become more and more hard to fulfill for the car manufacturers. Much research has been done in the field of physical modeling of the system, but in this work a linear adaptive time discrete ARX-model is developed and validated.The systems tendency to change its dynamic during usage implies that the model must be adaptive. The developed model proved to be well functioning and shows promising conditions for the MPC design.
Granskning av Solibri Model Checker - En Svenskanpassning : Ja?mfo?relse av tva? egenkontrollsystem
The building industry are currently going through a huge alteration. The introduction of BIM (Building Information modeling). Which also implements a lot of new ways of solving problems that building modeling can cause. This report is written for Uppsala University in cooperation with Temagruppen in Uppsala. However, it contains a comparison between two different systems that checks building models.
HÅLLBART BYGGANDEMED HJÄLP AV BIM : Effektiva energianalyser och LCC
The society strives for sustainable development, in the construction industry it is expressed through sustainable building. Energy and LCC analyzes increases the ability to make conscious decisions in the process. A problem in the construction industry is that energy and LCC analysis is not used to the desired extent, as they are perceived as complicated and time consuming. The report aims to achieve a more sustainable building through increased use of energy and LCC analyzes.The goal is to show how BIM can be used to improve the efficiency of the energy and LCC analyzes.The study was conducted with a literature review and a case study to answer which information that is required in a BIM model to perform energy and LCC analyzes. The study also shows which software can be used in BIM based energy and LCC analyzes and how the analyzes can be carried out efficiently.The result shows that effective analyzes may be performed if the BIM-model contains the relevant information for making analyzes.
Modell för dimensionering av AGV-system inom tung industri
Interest in the implementation of AGV-systems (Automated Guided Vehicle) has in recent decades increased. The reason is that it allows companies to perform reliably and secure internal transport while reducing the need of personnel. It is one of todays most advanced and complex material handling system that can independently make their own decisions regarding flow paths and traffic control. An AGV-system consists of transport units carrying cargo from point A to point B, and communicates using a computer.The purpose of this study is to develop a model on how to proceed in order to design an AGV system in heavy industry. The model is tested by a case study of a company in the metal industry to determine if the model works and gives the correct result.
Modell av en synkronmaskin för PSCAD/EMTDC med magnetisk mättning i d-led och elektriskt gränssnitt för fältmatare
This report describes a synchronous machine model with magnetic saturation in d-axis, neutralconnection and electrical exciter interface for the transient simulator PSCAD/EMTDC. It hasbeen designed and verified in comparison to the regular machine model in EMTDC.The performance of the model is very good when incorporating a linear as well as a saturatedmagnetising inductance. The dynamic deviation is only thousandths to ten thousandths perunit. By using a cubic interpolation of the saturation curve, the model gives a good representationof the saturation effect. The open source code implementation of the synchronousmachine model gives the possibility to easily adapt the model to specific requirements.The derived model makes it possible to simulate a synchronous machine with its excitationsystems, e.g.
Analys, modellering och återskapande av fordonsdynamiska rörelser i tåg
The purpose of this thesis was to analyse, model and finally generate dynamic vehicular motions in a train. The objective with the analysis was to find important motions for a realistic train experience. The motions from the analysis were then weighted against possibilities for generation in a motion platform.A dynamic motion model was created to model the selected motions. The model was implemented in a simulation environment, more specifically MATLAB/Simulink. The simulation environment was used to simulate the model and to generate outputs to control a motion platform.
ABB Gate Model : En processledningsmetod för ABB:s produktutveckling
Organisations tend to focus more and more on product and process development to increase their competitiveness. Several major organisations, among them ABB, have developed models aimed to more effectively control and manage product development processes. ABB is using its standardised model ABB Gate Model for this. The purpose of this thesis is to analyze how the introduction of ABB Gate Model has affected the outcome of decisions and also the decision-making in the product development process. The study is limited to elucidate the version of ABB Gate Model handling product development projects.
BIM Building Information Model : Hinder & Drivkraft
The construction industry is a costly business such in respect of capital for most construction defects which then require rework, tear down and rebuild again. This study is meaningful awareness of tools that can reduce this best through communication and information sharing between the parties. The construction industry is known as temporary projects organizations, where the construction project consists of several actors who have to communicate and share information between them to avoid mistakes later in the build time. These actors are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to create a routine for the association and the shattering of these actors. To implement such behavior using a tool such as BIM in the industry whose size perhaps is indescribable may be a very hard task. BIM (Building Information model) could be seen as the solution to this problem because it acts as a portal where the actors involved must sign in and communicate, share information, and eventually create a behavior, a routine for this association and division of the actors following the end of the project. The technology could help the involved from the beginning of the project, already in the model stage, break down and prevent any construction barriers when the building has been placed in the works.
?Vad är det jag gör egentligen?? - om att med videons hjälp bli medveten om helheten
This project consists of an adaptation, trial and evaluation of a model for practicing. Based on prior research I created a model aiming mainly to raise a musician?s self- awareness around the different parameters a performance consists of. An additional wish was for it to simultaneously assist the musician in monitoring his or her progress. With video recording and self-evaluation as the two main parts I tried the model by using it over a period of three months.
BIM - Förvaltarens Framtid
For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof.