Sök:

Sökresultat:

18009 Uppsatser om Information delivery manual - Sida 14 av 1201

Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Solvärme för en skola i Lerum. Studier av olika systemalternativ.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Konstruktion av steghållare till brandbilar

High demands are set on all equipment used in emergency service work, where small margins can be the distinguishing factor between life and death during a rescue operation. It is important that tools such as ladders quickly and easily can be dismounted from a vehicle and still satisfy the regulatory requirements for securing loads during transport. The existing solution for getting ladders down from the roof of a fire engine requires a large manual effort from the user in an ergonomically unsound posture.In this degree project a new ladder holder is developed with focus on the user to solve the ergonomic problems and at the same time create a more compact design that can be adapted to several different types of ladders. After an initial pre-study with user-interviews and measurement of forces and distances a set of requirements was formulated that came to govern the project's direction. Creative methods were used to generate concepts that improved the function and through design solutions, calculations and testing in CAD a base for manufacturing of a new product was created.The result is a completely new type of ladder holder that minimizes the user's manual effort and simplifies the securing of ladders in the holder.

Webbdesign för iPhone

Detta kandidatarbete utgår ifrån vilka aspekter som är viktiga att tänka på när man anpassar av en webbsida till en mobil enhet och de problem som uppstår när en webbsida skalas ner till en låg skärmupplösning. Vi har behandlat användarvänlighet, designprinciper, grafiska element och tekniska aspekter för att svara på problemformuleringen. Slutsatsen vi kommit fram till är ett antal punkter inom områdena ovan..

Beräkningsverktyg för plattformar till seriekompenseringsanläggningar

ABB is one of the world?s leading engineering companies in power and automation technologiesand their solutions improve performance while lowering environmental impacts for energycompanies and industries. ABB FACTS designs equipment and plants for series and phasecompensation.This thesis has been performed at ABB FACTS on the Mechanical Design (DM) department inVästerås, Sweden. The purpose of the thesis was to develop and design calculations andsimulation tools for ABB FACTS?s standard series capacitor platforms.

Ämnessökningar med kontrollerad vokabulär och naturligt språk: en jämförande studie med felanalys.

The aim of this thesis is to compare the effectivity of using a natural language and a controlled vocabulary when performing subject searches in the bibliographic database LISA Library and Information Science Abstracts. 20 topics were created and for each topic two searches were made, one by using a query formulated with natural language directed to the abstract field and the other one by using a query formulated with descriptors from the thesaurus in LISA directed to the descriptor field. The average relative recall amounted to 64,8% for the AB-queries and 54% for the DE-queries. Failure analysis showed that the majority of the relevant documents not retrieved by AB-queries could have been retrieved with other query terms, such as synonyms. In a natural language there are many different ways of expressing a topic, and this tends to have a negative effect on retrieval effectivity.

Skiftarbetets potential i byggbranschen

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Så tyckte jag det var... en retrospektiv studie av åtta ungdomars upplevelser av att vara på Staple behandlingshem

The aim of this university paper was to understand how eight former clients at Staple reformatory had experienced their stay there. The clients at Staple are young people between 13-20 years old, both boys and girls.The basic questions were: What picture do the clients have of the treatment they received?What has been, from their perspective, the most important during their stay? Do the clients think the time spent at Staple has helped them? And how do they describe their change, if there was any?We gathered the information from the youngsters with qualitative interviews based on a manual divided into covering different themesWe found that the time at Staple had been very positive for all the former clients that we interviewed. They described the relations with the staff at Staple as central for their rehabilitation. The most important task for the people that work there is to set a good example for the client, and to be role models.

Samband mellan lågt tryck i dricksvattenledningar och magbesvär - En utredning av hur lågt tryck på dricksvattenledningsnätet vid lagning av läckor påverkar sjukligheten hos Göteborg Vattens abonnenter.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Framtagande av OEE-mall

At Volvo Cars Torslanda's paint shop there is a requirement to in a fast and effective way get an overview of the plants capacity. Therefore a capacity template was constructed as a tool for the engineers at Volvo several years ago. This template has during the years become complicated and outdated. Thus this thesis work will resort as a new capacity template, built from scratch. The new template has been built up based on requirements from Volvo and the concept of OEE (Overall Equipment Effectiveness).

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Den interaktiva IR-forskningens genomslag i söktjänsterna på webben

The theoretical focus in this master is information retrieval (IR), and especially the part of IR that includes interactivity. This research is by some researchers called IIR. Our principal aim was to examine if search engines on the WWW are taking advantage of research results from IIR research. A way to do this is to look at the application of special features, in this case query expansion (QE) and relevance feedback (RF). Both these methods aim for a better matching of documents and the searchers information need.

<- Föregående sida 14 Nästa sida ->