Sök:

Sökresultat:

914 Uppsatser om Hydro plant turbine - Sida 31 av 61

Lönsamheten i vindkraft : en studie om den förväntade lönsamheten i landsbaserad vindkraft

This thesis analyzes the expected profitability in land based wind power plants. The expected profitability is calculated on the basis of a wind power project in Vartofta, Falköping. The information required to calculate the expected outcome is then concentrated to this project, which is in this thesis called project Näs. In project Näs they plan to build three wind power plants, with each an effect of 2 MWh. These wind power plants are very capital intensive investments with a long and uncertain payback time.

SOLPANELERS MÖJLIGHETER, EN AKTUELL RAPPORT FÖR MONTAGE PÅ FASTIGHETEN KORNHILL

This thesis deals with the possibilities of installing solar panels on a property, the building is owned by Kornhillschurch and called Kornhill. The owners of the property wanted to learn more about potentials for installation of solar panels on the property, therefore we described different types of solar cells and solar cells essential function to generate electricity in the report. Different factors that are limiting the generated energy are mentioned.An investigation of the property?s potential has been made in order to consider different designs. When sites that were considered suitable for solar cells were selected, different design options were made, one for each site.

Energieffektivisering av luftningssteget på Käppalaverket, Lidingö

This master thesis in energy optimization was made during the autumn of 2006 at Käppala wastewater treatment plant in Lidingö, Stockholm. A preceding thesis, where all electricity consumption was mapped, showed that the aeration in the biological treatment is the single largest consumer in the plant, and it is therefore of interest to reduce this cost. The oxygen control strategy used at Käppala WWTP is working well from a nutrient removal point of view, but not from an economic one. The last aerobic zones have a very low oxygen consumption during low loading periods which give rise to enhanced dissolved oxygen concentrations with excessive costs and reduced denitrification as a result. But also during periods of normal loading unnecessary high oxygen concentration are sometimes given.By modifying the aeration control strategy three full-scale experiments have been made, with the intention to reduce the air consumption.

Interactions between some plant-parasitic nematodes and Rhizoctonia solani in potato fields

The pathogenic fungus Rhizoctonia solani causes major economic losses for potato producers in Sweden. The producers, as well as advisors, have reported possible increases in severity of R. solani when free-living plant parasitic nematodes are present and active. There are several examples in the literature of interactions between pathogens where one, or both species, support or increase the damage made by the other organism. These complexes are important to investigate and to be able to forecast, since even low incidences of fungi or nematodes may result in an interaction of significance.

Beräkning av optimal batchstorlek på gavelspikningslinjer hos Vida Packaging i Hestra :

This final thesis aim to create a support that can decrease the uncertainty when planning the cable drum flanges lines that produces cable drums in the interval 100 to 320cm in diameter at Vida Packaging in Hestra. The purpose attains through finding an optimal batch size that minimizes the total storage cost and order prime cost, without degenerate delivery capacity to the customer. Through survey the sale and stock balance development during 2005 and 2006 for cable drums in Hestra and give alternative suggestions how to plan the production after installing a new cable drum flanges line. The study also explores different ways of working during product change in existing nailing line, to minimize the order prime cost. Vida Packaging in Hestra is a part of the Vida group, which is Sweden?s largest privately owned sawmill group with seven sawmills placed all around southern Sweden.

Viltanpassad röjning längs skogsbilvägar som en foderskapande åtgärd för älgen

The moose is a keystone species in the boreal forest ecosystem, but the dense Swedish population do cause some serious problems. From a forestry perspective, their browsing on young Scot pine (Pinus sylvestris) causes extensive losses of revenue. Adjusting the cleaning along roadsides of low trafficked forest roads can favour the production of plant species preferred by the moose. This is thought to redirect the moose´s browsing to the roadsides and thereby decrease the damages on commercial forest.The aim of this study has been to present a first evaluation of the vegetation in roadsides, one year after wildlife-adapted roadside clearing has been undertaken. In the wildlifeadapted clearing operation, the roadside was widened by removal of some trees in the forest edge whereupon a complementary clearing with a conventional chain flail was conducted.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Framtidens Hus

The company Sol & Energiteknik wanted to examine the possibility to make a standardhouse totally energy independent. Based upon this I have, during the spring of 2007,examined the possibilities available at the market today through litterature studies, contactwith several companies and reading reports at the internet.The first thing to examine has been to determine the energy consumption for a standardhouse, and find out if there are better technologies to be used for energy conservation.My conclusion in this matter is that there are possibilities today for building a house moreenergy efficient.When I had reached the point at which my design for the house was decided, I also hadto choose the different products to use to produce energy as well as to store that energy.To produce heat and electricity to the house I decided to use a wind turbine and a solarwater heater.The most difficult part of designing a house that is energy independent is that theproduced energy must be stored somehow. Storing the heat is relatively easy beacuse theheat can be stored in a large water tank. The electricity is a bigger problem beacuse itmust be stored in batteries, which today are too expensive to be used in a standard house.In the future producing and storing hydrogen might be used to produce electricity, buttoday that technology is both expensive and not tested enough.My final conclusion is that a standard house can not be built to be totally energyindependent today, unless it is very expensive to connect the house to the electricitynetwork. As an alternative solution I came up with a proposal for a house which isconnected to the electricity network and have some amount of own produced energy.This house prooved to be a good investment if you choose to build it today, and it couldbe a very good investment in the long run beacuse energy prices increase every year..

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Bostadsbyggande i Skövde fram till år 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 31 Nästa sida ->