Sökresultat:
4540 Uppsatser om High-voltage connector - Sida 10 av 303
Konstruktionsforslag for kabelprovningsutrustning av serieresonanstyp
In order to decrease the disturbance from a cable testing equipment, the company Ericsson Network Technologies in Falun determined to design a new series resonant test system with a lower frequency. The new equipment is of series resonant type with a system frequency of 500 Hz. This equipment consists of an inductor, a capacitor and a voltage source. The voltage source is the same as the old one, the cable acts as the capacitor but the inductor has to be designed especially for the new equipment. In this thesis work several air coil inductor types were examined.
ITS - Interaktivt textsystem
This report describes the creation of an interactive text system for storing, retrieval and publishing of texts, ITS.My task was to create a GUI together with a database capable of handling text, commenting of texts, references between texts, and the capability to associate images with texts.After enough texts have been inserted into the database, there shall be an ability to generate a report out of them.The report describes the methods used when the GUI was implemented, how the database was modelled and implemented, and how the security aspects where solved.The entire project is created with the help of Java, MySQL server, Connector/J and OpenSSL.Furthermore the functions of the GUI and the future of ITS is described..
Analys av PWM-mönster i Matlab
One of ABB Power Systems´s business areas is HVDC (High Voltage Direct Current) technology. HVDC is used for transmissions for both short and long distances. One of Power Systems?s products is called HVDC Light. HVDC Light is a relatively new technology for power transmission, but have before only been used for motor drives applications.
Frekvensreglering i det nordiska kraftsystemet
Svenska Kraftnät is (together with the other transmission system operators of the Nordic power system) responsible for keeping balance between the generated and demanded power in the Nordic power system. Spontaneous load variations and system disturbances, however, lead to power imbalance followed by frequency variations. The frequency deviations can be limited to an acceptable level by the spinning reserve, mainly by hydro power control. But there are also other system properties which have a great influence on the frequency and system stability. The frequency and voltage dependence of the loads have a direct influence on the power balance.
Design av Digital Multimeter-modul för inbyggt testsystem
The thesis work of 15 credits has been performed to interest of Norrtälje ElektronikPartner AB (NEP) in Norrtälje. The aim of the thesis was to develop a prototype for an integrated digital multimeter, designed for one of NEP's proprietary test systems. A digital multimeter module according to NEP's requirement specification, such as physical size and accuracy should be constructed. The module should be able to measure current, voltage and resistance.The final circuit was based on the chosen analog to digital-converter, Maxim integrated´s Max134, which is the main component of the circuit for this instrument. A circuit diagram and PCB layout were made. The result of this project is a constructed DMM board.
Hjälpkraftsystem med två lågspänningsnivåer
Because of increasing demand of power on Malmbanan the capacity of the existing wires which supply the trains must be increased. This increases the stress on the existing poles and for this reason the system for supplying the loads along the railway is to be removed from the poles and be replaced by some other system. This thesis is a study on a two-level low voltage (1 kV and 0.4 kV) electrical system with the aim to investigate if it can be an alternative to the system used today taking into account the voltages, fault currents and costs.In this thesis the following tasks have been performed:? Gathering of data? Description of basic theory? Loadow and fault current calculations of the system with MATLAB? Life Cycle Cost estimate of the system? Analysis and conclusions from the resultsThe results show that the new system can be an alternative to replace today's system. The simulations and calculations show that the voltage drop is at an acceptable level and that the fault currents are large enough to supply a safe disconnection if a fault occurs at the far end of the system..
Framtidens elnät : Hur elbilar och solceller påverkar på det lokala elnätet
The purpose of the project is to determine the impact of solar cells and electrical vehicles on the future electricity grid and distribution network. Future electricity grids will be affected differently than it does today. Therefore, it is important to determine the impacts so that the current electricity distribution system can be developed and redesign to achieve the future demand. In Sweden, government has changed rules and laws in order to make it easier for private sector to invest in renewable energy sources. Our project focused on the impact of the solar cells and electric vehicles on the low voltage electricity distribution.
Avbrottsfri Kraft med användning av ultrakondensatorer
The supply of uninterruptible power can be applied to many areas wherecontinuous operation is highly prioritized.The application of uninterruptible power for motor operation is facilitatedusing a frequency converter. Direct current operated frequency converters canbe applied directly to the power reserve which removes the need for additionalpower-converting.Batteries have long constituted the power reserve but advancements inthe development of ultracapacitors have created a viable substitution. Ultra-capacitors have high energy storing capabilities and can be applied to highpower applications.Maxwell is a leading manufacturing company of ultracapacitors and pro-vide different modules with built-in solutions for voltage balancing. Unevenvoltages between series-connected capacitors is a phenomenon caused by vary-ing capacitance. A configuration containing Maxwell?s 56V module is createdand constitutes the power reserve in the simulations.The discharge simulation shows a significant current that could damagethe system.
Säkerhetsanalys av brandbekämpning i kritiska utrymmen på Forsmark 1
In order to maintain a high safety level at a nuclear power plant it is important not only to measure the reliability of the components and systems of the plant, but also to investigate how the plant responds to human actions. One of the most hazardous situations in managing a power plant is fire occurring in critical areas. This study concerns the prospect of the local fire brigade to suppress a fire that has started in one of the most critical rooms for maintaining high reactor safety. The model created gives an indication on the possibilities of succeeding in suppressing a fire. In order to get a more reliable fire fighting the following advice are given:- Let the fire brigade go rounds in the plant together with the personnel, during which recommended fire suppressing methods are determined to avoid long preparation time in an actual situation.- Prepare rooms with two subsystems to make them partly with no voltage.- Give the fire brigade better feedback from actual events on nuclear power plants.- Education and training in suppressing fires in electrical equipment.The probabilistic safety assessment strives to be as realistic as possible.
Hur påverkar en ökad andel solceller Umeå Energis elnät? : ? En utredning med fokus på spänningsvariationer och osymmetri inom landsbygds- och tätortsnät vid en- och trefasanslutning av solcellsanläggningar
A good power quality can be an important prerequisite to achieve a sustainable society. Scandinavia's electrical system is in many respects superior, and Sweden has a fossil free electricity generation at 97 % and a reliability of electricity distribution at 99.98 %. Meanwhile, the EU has an ambition to expand the electricity market in order to achieve a joint trading business across Europe. This cross-border market will result in a large proportion of fossil energy sources integrated into our electrical system, which also leads to an increased need for renewable electricity production in Sweden. One part of this development is to increase the share of renewable micro generation that is locally or regionally connected to the power grid.
Robothandel ? En rättvis arena? -En litteraturstudie om Robothandeln med aktier
The purpose of the thesis is to demonstrate how high frequency trading affects the stock market. The growing high frequency trading is affecting the game plan on the financial markets and concerns have grown about the high frequency users intentions with their business. It is difficult to receive an overall picture of the subject because the lack of previous research and even the research that exist do not show the entire picture. The thesis contributes to the research through a comprehensive picture of the present debate as well as the previous research through a literature study. Our results showed that high frequency trading provides liquidity to the market, there is a statistical connection between high frequency trading and volatility, no price manipulation is being used and there is a need for a supervision of the high frequency trading..
Säkring av samtliga kritiska skruvförband i mellanstora asynkronmotorer
The purpose with this thesis is to get a compilation of all the critical bolted joints of all enginesproduced at LV Motors. ABB LV Motors produces induction engines with seven shaft heights. Eachengine size exists several variants of components ex. standard shield and flange shield. Depending onwhich components the engine is equipped with arises various types of strains in the engine's parts,certain assembly ways are more favourable than other.The most critical parts in the engine from a mechanical point of view are the screw units betweenshield/stator, feet/stator and bearing cover/shield.
Implementering av Constant Fraction Detection vid avståndsmätning
This thesis is performed at Saab Bofors Dynamics in Karlskoga and investigates a technique for ranging with laser pulses. The investigated technique is called Constant Fraction Detection (CFD). Described briefly, the received laser pulse is split into two equal parts, where one part is delayed half the pulse width and inverted. This signal is added to the original pulse. The resulting curve has the shape of a laying S and the detection of the zero level is used to stop the time measurement.
Möjligheter, behov och strategi för företagsetableringar inom High Voltage Valley
The structure of the thesis is based on opportunities to attract businesses to the region, the need of establishments in the region and benchmarking with establishment strategies of other cluster initiatives. The identified opportunities are the local business relationship with ABB, the prerequisites of life quality in the region and the availability of financial support. Further on has a number of opportunities to be developed been identified; diversification of the existing businesses, an expansion of the cooperation with universities and to simplify the contact with local authorities. Challenges that HVV is facing is: creating a more dynamic labor market, secure long-term labor supply, spread the image of the brand HVV and finally putting HVVs geographic scope. Two of the identified needs of establishments are strategically important: to establish a third-party logistician and commercializing systems for distributed generation and energy storage.
Vallfoderproduktion i norrländskt klimat till högpresterande hästar :
High-performance equine athletes have an energy requirement that often reaches twice the maintenance requirement. Horses are grazers and adapted to a grass diet, and diets high in grains and concentrates are associated with digestive upsets and behavioural disorders. It could therefore be of interest if the energy requirement of a high-performing horse could be met by forage. It is important that the forage have a high concentration of energy so that the horse is able to consume the whole amount of energy needed from the forage without exceeding the maximum voluntary intake. The purpose of this literature study was to investigate if the energy demand of a high-performance horse can be covered by forage produced under Northern Swedish climate conditions.