Sök:

Sökresultat:

3173 Uppsatser om Heating systems - Sida 3 av 212

Prestandaförändringen hos en bergvärmeanläggning efter fem års drifttid

The aim of this report was to do a case study at a geothermal heating system which has been in operation for about 5 years, and study if its performance has changed during this period of time. A literature study about the processes involved was also done in purpose of background knowledge.The tenant-owner?s association Duvan at Petterslundsgatan in Uppsala installed year 1999-2000 a geothermal heating system. The purpose of this installation was that they hoped it would lead to a smaller usage of district heating which would lead to a reduction of the heating expenses for their buildings. The geothermal heating system consists of 19 energy wells and 4 geothermal heat pumps, and it is one of the first systems of that size in the region of Uppsala.

Beräkning av värmeenergiförluster i flerbostadshus genom analys av den totala fjärrvärmeenergianvändningen :

This thesis has been carried out on behalf of IV Produkt AB and intends to set an average ratio of thermal energy losses in apartment buildings that were built during the 1960-1990. This shall be derived by analyzing the total district energy consumption that has been divided into three parts: heat energy losses (the actual heating requirements), the heating of domestic hot water and heating energy consumption for the controlled ventilation.Three different residential areas that were built during the years 1962-1966 and one that was built in 1993 has been analyzed. All residential areas are located in Växjö urban and contains between four and six apartment buildings.The analyzed objects have a mechanical exhaust ventilation systems and district heating as the heating method. No own laboratory work or experiments have been done in this thesis, the calculations have been done on the basis of parameters from VEAB, interviews with property managers, and literature studies. By calculations, we have got a result that is reported in Chapter 6.

Optimering av B-stolpe

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Fjärrstyrd undervattensfarkost

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Fra?n passivhus till NNE-hus : va?gen till ha?llbar utveckling

sustainable development by reducing the energy use by EU:s directive of energy efficiency and the UN Convention. The second purpose is to present the technical solutions regarding ventilation and heating system that is being used in passive houses. This was done using 8 passive houses, 4 germany and 4 swedish passive houses. Even the international and Swedish system requirements for passive houses have been addressed in this project. The goal was also to explain how and why the mechanical system in passive houses has developed to the technology used today.

Kan detektorer förebygga tågurspårning?

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Inventering av processvattenbalans : fastställande av fjärrvärmedistributionens läckage inom Vattenfall Värme Uppsala AB

Heat is distributed to the district heating customers through pipes with water as a heat carrier. The district heating system is complex. To decide what is leakages from the district heating net versus what is the water consumption of the plant, is difficult. Therefore, the purpose of this master thesis is to establish a model where the district heating net?s leakages but also the water consumption of the plant can be followed daily. The project is performed at Vattenfall´s district heating power plant in Uppsala. Information is gathered through discussions, drawings of the plant and guided tours of the plant.

Energikartläggning av en livsmedelsindustri : samt förslag på energieffektiviserande åtgärder

This thesis concerns an energy audit of a food industry. The company's business consists of boiling and peeling shrimps, and producing mayonnaise-based salads. This type of work involves energy-intensive processes, such as steam generation, compression of air and refrigeration of large spaces. These needs are supplied with electricity. Furthermore, the industry is a major consumer of district heating, particularly for heating the supply air in the ventilation system.

Modellering och verifikation av hjulupphängning för ett ultralätt elfordon

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hållbara uppvärmningsalternativ för Grinda Wärdshus : En studie om uppvärmning med pellets och flis

This report is a bachelor's thesis of two students from the Energy and Environment degree at KTH Stockholm. Grinda is an island situated Stockholm archipelago. Skärgårdsstiftelsen is landowners and manages the area. Grinda Wärdshus, a guest house located in the island, currently uses an oil-fired boiler as a heating system. The aim of this thesis is to investigate whether wood chips or pellets is, from a sustainability standpoint, a suitable heating method for the guest house.

Företags informationsförmedling i en bostadsköpprocess

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Utformning av förfrågningsunderlag vid totalentreprenader

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

<- Föregående sida 3 Nästa sida ->