Sök:

Sökresultat:

669 Uppsatser om Heat pump - Sida 10 av 45

Energibalansen för ett nytt flerbostadshus i Mellansverige : Beräkningar intervjuer och analys av energikraven i Boverkets Byggregler

Abstract   This degree project comprises 30 credits, i.e. 20 weeks of work. The work mainly deals with the energy balance for a multi-family house in Västerås and the requirements for energy conservation in the Swedish building code, BBR. Calculations of the energy balance are supplemented by a number of interviews. Energy conservation in general has become more important in recent years and the subject is in line with increased public awareness. This importance and attention is explained by environmental problems in general and global warming in particular, but also by rising energy prices.

Fällning av kisel från avloppsvatten vid Hellisheidarvirkjun - experimentell studie

This report is about the experiments with mixing of the separated water and the vacuum pump seal water at Hellisheiði power plant. This is done to prevent silica scaling and clogging in pipes and reinjection wells as well as eliminating vacuum pump seal water from the plant. The experiments were done in four stages: the first stage comprised of tests with different flows of separated water at 70°C, the second stage was carried out by mixing the separated water at 70°C and the seal water with different amounts of the seal water, the third and the fourth stages were like the first and second but with the separated water at 120°C. The results show that this method is good if the mixture is around 50/50 separated water and seal water, to control the silica scaling in the separated water and to be able to reinject the seal water with the separated water. This does not eliminate the silica scaling in all of the separated water because the amount of separated water is much more than the amount of seal water that comes from the plant. .

Passivhus vid polcirkeln : Fungerar det?

This report is the product of the course AF101X, a bachelors degree in Samhällsbyggnad atKTH. The task of the course is to design a small house at a given location and also implement adeepening study. The house in this report is located in Kiruna in the north of Sweden, where theclimate is much colder than in the rest of the country.The deepening study of this report is to evaluates how realistic passive housing north of thePolar Circle is based on those facts. The house will to some extent be designed to fit the passivehousing standard.

Energikartläggning vid biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production. The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with the measured time of usage.

Energikartläggning av biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.

Prestandaförändringen hos en bergvärmeanläggning efter fem års drifttid

The aim of this report was to do a case study at a geothermal heating system which has been in operation for about 5 years, and study if its performance has changed during this period of time. A literature study about the processes involved was also done in purpose of background knowledge.The tenant-owner?s association Duvan at Petterslundsgatan in Uppsala installed year 1999-2000 a geothermal heating system. The purpose of this installation was that they hoped it would lead to a smaller usage of district heating which would lead to a reduction of the heating expenses for their buildings. The geothermal heating system consists of 19 energy wells and 4 geothermal Heat pumps, and it is one of the first systems of that size in the region of Uppsala.

Effektivare energianvändning på Totebo AB

The main goal with this thesis report was to come up with ideas of how to make the use of energy more effective and thus save money for the company.First a survey was made to find out where and how the energy consumers were divided within the company. The results were then used in calculations to find out how much money that could be saved and how long it would take to get back the investments.There is a big potential in saving money by recovering heat from the UV-lamps with a heat exchanger. It would also even out the pressure in the factory which is a source to heat loss and a cause for discomfort amongst the employees. It?s possible to save 105 000 kr in a year and the money needed for the investments is 600 000 kr.By using the recovery air more effectively the company could save up to 250 000 kr a year in lowered heat purchases, but this would require the use of automatic dampers.If you reschedule the running times for the wood chipper and invest in some kind of load management, for example Sydkraft?s ?Energidirigent? you can save at least 42 000 kr.

Beräkning av värmeförluster och energieffektivisering av elbussar

The ?civilized? world is in need of fossil fuel in order to function. Hybricon AB is a company in Umeå that is developing a technology that hopefully can reduce parts of this need. They are currently testing their two electrical busses (with Hybrid backup) in city traffic on the roads of Umeå in cooperation with the county of Umeå.                               The busses are originally diesel-busses, but the diesel motor has been replaced with two electrical hub-motors with a power of 145 kW each that are powered by batteries.The batteries are charged at the end station after each route. In case the batteries should run low on capacity during driving, they can be recharged by the so called genset.

Jämförelse av solhybrider

Research in solar energy is taking big steps in both solar heating and solar electricity. It´s not only the technologies alone, but also the combination of both solar electricity and solar heating which is what is called a solar hybrid. The idea of a solar hybrid is that a solar cells efficiency decrease with increased temperature and can with help from a solar collector be cooled and the heat can be utilized. This thesis report compares heat production and electricity production with respect of, in first hand, a solar hybrids geometry in the cooler. The theory chapter describes solar heating and how different solar cell technologies work and their environmental impact at the production and how compatible these technologies are for the solar hybrid.

Underlag för övergång från ventilstyrt till frekvensstyrt rörsystem

Sedan 2000-talet har Sveriges största kraftvärmeverk MälarEnergi, har övergått från ventilstyrda rörsystem till frekvensstyrda i sina stora pumpsystem. På detta sätt har över 30 miljoner kronor samt över tusen ton CO2 sparats. Idag har MälarEnergi tillsatts en utredning i syfte till att se över möjligheten att genomdriva en liknande energieffektivisering för sina mindre pump- och rörsystem. Dessvärre saknas det korrekta data över tryckfallen i dessa mindre system, eftersom många av dessa är byggda under slutet av 1970-talet. Detta examensarbete handlar om att ta fram ett underlag för val av nya pumpar till ett valt pump- och rörsystem, AMP41-42.

Utredning av värmepump med fjärrvärmespets

Det här är ett examensarbete som handlar om en fastighet som står på Norra Kungsgatan 37-43 som har både en värmepump och fjärrvärme för uppvärmning. Värmepumpen används i första hand och fjärrvärmen används som spets när värmepumpen inte räcker till. Detta är en ganska ovanlig kombination. Syftet med arbetet är att ta reda på om detta är en bra lösning och om lösningen är lönsam. För att få fram hur stort fastighetens energibehov är så görs beräkningar utifrån fjärrvärmedata från tidigare år samt en gammal värmepump som är utbytt sedan 2011.

Artificiell insemination av får

AbstractThe purpose of this bachelor thesis is to describe the use of artificial insemination (AI) in sheep and discuss the possibilities for AI in Sweden. Male and female fertility, heat detection, semen handling and insemination techniques in sheep are described. Advantages and disadvantages of AI are discussed. In order to achieve genetic progress it is important with well planned and implemented breeding programs. The Swedish Sheep Recording Scheme and computer software from Elitlamm are the basis for sheep breeding in Sweden.

Kyla i Nyköping och Motala : Kartläggning av kylapotential för Vattenfall Värm

The Swedish energy company Vattenfall is currently the owner of the district heatingsystems in Nyköping and Motala. To be able to also offer cooling solutions tocustomers are becoming more and more important. This report describes the resultsof an investigation of the cooling market in the two cities and the potential needs forcooling today and in the coming 20 years. The total potential for the coming 20 yearsis estimated to be roughly 17 MW for Nyköping and 9 MW for Motala.Two possible district cooling systems for each of the two city centers was modeledand a comparison was made between different cooling techniques namely absorptionand compressor chillers.Absorption chillers driven with district heating during the summer is one way ofincreasing the load in a combined heat and power plant and thereby the possibleelectricity generation. The cost of heat production must be low for absorption chillerto be able to compete as an alternative.

Enegiutredning Hotell Princess

This report will show the energy usage of Hotel Princess in Sandviken, Sweden. When the hotel changed owner an examination of the hotels heating, ventilation and sanitary systems were done. The report showed flaws in the ventilation system, and is why the new owner wanted a closer look at the energy use of the hotel. The original building was built in the 1930s and two major extensions have been built, one in the 1950s and the most recent in the 1980s. An assumption made is that the building parts were built to the restrictions during the time. Activities on the hotel include sleep over, conference, night club, massage and swimming in the hotels pool section.

Renovering av flerfamiljsbostäder inom miljonprogrammet ur ett energi- och lönsamhetsperspektiv

Miljonprogram is a Swedish building program from 1964 to 1975. During that time about a million homes were constructed. Now, almost 50 years later, they are in desperate need of renovation. In order to fulfil the Swedish environmental objective to decrease energy consumption 50 per cent until 2050, considerable housing stock built under the Miljonprogram has to be renovated.Focus in this thesis is on the building services and theirs profitability that can decrease energy consumption in households build during the Miljonprogram. Building construction is not considered in this report.

<- Föregående sida 10 Nästa sida ->