Sökresultat:
1850 Uppsatser om Heat load characteristics - Sida 10 av 124
Kan detektorer förebygga tågurspårning?
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Passivhus vid polcirkeln : Fungerar det?
This report is the product of the course AF101X, a bachelors degree in Samhällsbyggnad atKTH. The task of the course is to design a small house at a given location and also implement adeepening study. The house in this report is located in Kiruna in the north of Sweden, where theclimate is much colder than in the rest of the country.The deepening study of this report is to evaluates how realistic passive housing north of thePolar Circle is based on those facts. The house will to some extent be designed to fit the passivehousing standard.
Energikartläggning vid biogasanläggningen, Kungsängens gård
The purpose of this thesis was to make an energy survey and quantify energy flows of
individual unit operations associated with the biogas production in Uppsala Vatten och Avfall
AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would
be identified and analyzed. The objective of this energy survey was to obtain a detailed
understanding of the energy use in the biogas production.
The energy survey was divided into two parts: electricity and heat. Each part was treated
separately and with somewhat different approach. To estimate the electricity usage during the
projcet the rated power of each selected unit operation was noted and multplied with the
measured time of usage.
Energikartläggning av biogasanläggningen, Kungsängens gård
The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.
Två nya trailerkoncept för transport av rundvirke hos Stora Enso : en analys av prestation och flexibilitet
The need for roundwood transport capacity vary throughout the year. The need during a period is influenced mainly by the volume transported the period, the number of days during which transport can be carried out, seasonal variations in road conditions and the weight of the roundwood, and the origin of the wood (private forest owners/ forest companies). The need for transport capacity generally increase during the winter and in spring, after thawing. Lack of logging trucks combined with a lack of drivers for these trucks make it hard to hire extra help during periods of increased transport capacity needs. It is also very expensive to keep logging trucks for use only during these periods.
In this thesis, two new concepts based on the partial transport by truck tractors have been examined, to find out the possibility for increased performance and flexibility.
Modellering och verifikation av hjulupphängning för ett ultralätt elfordon
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Hunnebergs Gård ? en förstudie av möjliga verksamheter
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Prestandaförändringen hos en bergvärmeanläggning efter fem års drifttid
The aim of this report was to do a case study at a geothermal heating system which has been in operation for about 5 years, and study if its performance has changed during this period of time. A literature study about the processes involved was also done in purpose of background knowledge.The tenant-owner?s association Duvan at Petterslundsgatan in Uppsala installed year 1999-2000 a geothermal heating system. The purpose of this installation was that they hoped it would lead to a smaller usage of district heating which would lead to a reduction of the heating expenses for their buildings. The geothermal heating system consists of 19 energy wells and 4 geothermal heat pumps, and it is one of the first systems of that size in the region of Uppsala.
Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Beräkning av värmeförluster och energieffektivisering av elbussar
The ?civilized? world is in need of fossil fuel in order to function. Hybricon AB is a company in Umeå that is developing a technology that hopefully can reduce parts of this need. They are currently testing their two electrical busses (with Hybrid backup) in city traffic on the roads of Umeå in cooperation with the county of Umeå. The busses are originally diesel-busses, but the diesel motor has been replaced with two electrical hub-motors with a power of 145 kW each that are powered by batteries.The batteries are charged at the end station after each route. In case the batteries should run low on capacity during driving, they can be recharged by the so called genset.
Företags informationsförmedling i en bostadsköpprocess
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Jämförelse av solhybrider
Research in solar energy is taking big steps in both solar heating and solar electricity. It´s not only the technologies alone, but also the combination of both solar electricity and solar heating which is what is called a solar hybrid. The idea of a solar hybrid is that a solar cells efficiency decrease with increased temperature and can with help from a solar collector be cooled and the heat can be utilized. This thesis report compares heat production and electricity production with respect of, in first hand, a solar hybrids geometry in the cooler. The theory chapter describes solar heating and how different solar cell technologies work and their environmental impact at the production and how compatible these technologies are for the solar hybrid.
Utformning av förfrågningsunderlag vid totalentreprenader
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
End of line test : En studie av företaget Emotrons linjetestning i produktionen
Emotron is a company specialised in developing, producing and marketing equipment to con-trol, monitor and protect processes and machinery driven by electric motors, with an applica-tion focus. Examples of uses for their products are fans, pumps, lifts and cranes.The project is to look at Emotrons end of line test. The company has seen that at the final test-ing there is a bottleneck that restricts the outflow and prevents an increase in the number of tested products.The purpose of this project is to review how Emotrons end-of-line test works today and if there is a possibility to make the test more efficient in such a way that the quality is not at risk, while increasing the outflow of tested products.The projects first step is to look at and analyse what is causing the bottleneck at the end-of-line. When the analysis is complete, the next step is to review whether there is a possibility to solve the bottleneck and if so in what way can this be done. Emotrons most overall objective of the project is to increase the outflow of the number of tested products without jeopardizing the quality.An analysis has been made on frequency inverters, soft starters and shaft power monitors.
Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.