Den kollektiva missuppfattningen. En studie om missuppfattningar om färdmedelsalternativen bil och kollektivtrafik, för boende i Hjuvik
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kartering av föroreningskällor i urbana avrinningsområden
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Driftoptimering av torkmaskin : Driftoptimering av torkmaskin 3 vid Billerudkorsnäs Karlsborg AB
The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.
Utrustning för automatmontering av ackumulator
This report deals with an exam report written by Olle Hjalmarsson and Thomas Likar, students at Högskolan i Halmstad. The project was carried out for Haldex Traction AB in Landskrona whose business consist of manufacturing automatic all wheel drive systems (AWD-system). These systems consist of a plate clutch which activates all four wheels of a 4-wheel driven vehicle. An important component in these clutches is the accumulator which basically consists of a piston under the load of a spring which creates an oil pressure with the help of an electric motor used for actuating the clutch.At Haldex difficulties has been experienced regarding the assembly of the accumulator parts due to the small tolerances between the piston and the hole of the accumulator in the cast aluminium housing. Attempts have been made to assemble the parts in existing robot cells.
Att utveckla en webbutik för skyddsskors- och arbetsklädesmarknaden
Rapporten beskriver utvecklingen av en webbutik för ett fiktivt företag inom arbets- och skyddsklädesbranschen. Detta projekt utgör examinationsmaterial för en kandidatexamen för gruppens medlemmar. Projektgruppen bestod av fem medlemmar som under projektets gång arbetat enligt Scrum-metodiken. Programmeringsspråken som används är Python, Javascript, HTML, CSS och SQL. En marknadsundersökning gjordes som bekräftade att marknad finns och identifierade lämpliga målgrupper.
Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Föroreningstransport med dagvatten - Utveckling av reningsmoduler för modellverktyget Mike Urban SWQ (Storm Water Quality)
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.