Sök:

Sökresultat:

946 Uppsatser om Grid technique - Sida 50 av 64

En komplett sångundervisning? : En intervjustudie av fyra sångpedagogers syn på hur fortbildning på ?Complete Vocal Institute? påverkar och bidrar till deras sätt att undervisa

Syftet med föreliggande studie är att undersöka hur fortbildning på ?Complete Vocal Institute?, CVI, påverkar och bidrar till sångpedagogers undervisningssätt. Bakgrundskapitlet ger en kort beskrivning av den fortbildning på ?Complete Vocal Institute? som informanterna i studien har gått. Vidare följer en presentation av komplett sångtekniks (CVT:s) grundare Cathrine Sadolin, hur CVT växte fram samt av metodens innebörd och funktion.

Bakom Spegeln : En essä om tvivlet eller det goda beslutet i en filmproduktion

The essay depicts the opposite views of the director and an actor during the filming of a specific scene in a feature film. The actor feels that he is not being listened to. This leads to unforeseen consequences for the director, as the actor no longer wishes to take part in the marketing of the film prior to its opening night. Everything is seen from the director?s point of view, she is working in a film world dominated by men.Questions are being asked if the director?s instructions are clear enough or if the actor, fearing getting lost, is mixing up his own feelings with those of the character he is portraying? What happens to the collaboration and how does it affect the rest of the team and the completion of the production? The director is also the producer.

Examen igen?

This paper will discuss the proposed reintroducing of a final degree in upper secondary school. In a public government inquiry that was released in March 2008 a proposal about reintroducing a final degree in upper secondary school was presented. A final degree has not been a part of the upper secondary school science 1968. Why was the system with a final degree abounded and why do the government want to reintroduce it?Research in pedagogy has through the years presented numbers of theories about assessment.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utveckling av arbetsmetod för DFA

Scania is among the leading companies in the heavy vehicle industry. Scania also assemble engines for their trucks and buses, as well as to external marine and industrial applications. Wrongly assembled parts leads to quality problems, which makes it important to secure that the assembly is correct. To do this Design For Assembly (DFA) is used to describe how parts should become easier to assemble. Scania?s production unit for engine assembly has had a working method for DFA in the shape of a checklist, which is not used.

Förrotation till omrörare

The primary function of a mixer is to keep a fluid in constant motion. All mixing applicationsrequire varying degrees of small-scale turbulence and bulk flow. The performance of asubmersible mixer is measured by the thrust that it produces, while the strength of the bulkflow is dependent on the total amount of installed thrust.In a mixer, the fluid quickly flows past the propeller, and as a result, the current is mainlyaxial. The fluid will also obtain a rotating velocity, or a swirl, though this is significantly lessthan that of the propeller. During the process, the total amount of energy increases in the formof static pressure and kinetic energy.

Definition av stötdämpares fyllnadsgrad

Shock absorber units play a key role in establishing the driving dynamics and performance of automobiles. Öhlins Racing has manufactured high-tech automotive shock absorbers for over 30 years. Öhlins Racing?s advanced technology has contributed to over 200 world championships in automobile racing. Öhlin?s manufacturing process has long utilized automated fluid filling equipment during the final shock absorber unit assembly stage. The filling process consists of vacuum pumping the shock absorber unit and subsequent transfer of fluid. Vacuum pumping is necessary to remove residual air from the shock absorber unit prior to initiating the liquid filling stage. The presence of undesirable gases drastically compromises the performance of a shock absorber. The filling degree, defined as the final ratio of air to oil, is determined by the specific filling protocol as well as the specific equipment utilized.The current investigation aims to develop a viable technique to accurately determine residual air content in shock absorber units. If the filling degree can be appropriately quantified for a specific manufacturing process, then the air/oil ratio may be quantitatively related to shock absorber performance. The utilized measurement method must be completely integrated into the manufacturing process to guarantee shock absorber performance specifications according to the manufacturer?s standards. By utilizing the measurement method developed in this work, the manufacturing process, manufacturing equipment and product specifications can all be tailored to provide improved filling conditions.The developed measurement method provides accurate quantification of the filling degree under a wide range of processing conditions. The method establishes the relative quantity of air in the shock absorber unit by performing in-situ compressibility tests. The fill ratio can be controlled and varied by manipulating the vacuum pressure exerted during the filling process. Performance tests, however, indicate no correlation between filling degree and unit performance..

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utredning om huruvida Dalarnas Tidningars produktion passar en KBA Cortina

This degree project illustrates newsprint and waterless offset. A new news press was introduced at Drupa-00, Cortina from KBA, which is the first news press dedicated the waterless technique. With actual statistics from the company in question an investigation was made whether their production fits this press. It came out in the investigation that the production of the company, from statistics, fits this press very good. A table was made where different timeschedules were accounted for the new press, with semi- and full automatic plate changing for present and to be added papers.

Validering av metoder för analys av Cu, Fe och Na i processvatten med AAS-grafitugn

Södra Cell Mörrum is one of the five paper pulp plants that are included in Södra Cell, and the paper pulp that is produced here is not only sold to Swedish paper mills. Most of the paper pulp is exported to different countries in Europe. In the manufacturing process the plant needs different kind of process water and there are guideline values for how much copper, iron and sodium this water is allowed to contain. Analyzes of this water is in the current situation done with an atomic absorption spectrometric instrument (AAS-instrument) with a flame. Measurements done with flame-AAS of samples that have concentrations near the guideline values for copper, iron and sodium, are not reliable. The reason for not being reliable is that the quantitation limits of these metals are higher than the limit values.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 50 Nästa sida ->