Sökresultat:
1145 Uppsatser om Green buildings - Sida 65 av 77
Fördjupad miljöriskbedömning av förorenade markekologiska system. : Integrering av kemisk, toxikologisk och ekologisk information.
AbstractThe research project Liberation, supported by the European Commission under the Environment and Sustainable Development Programme (Fifth RTD Framework Programme) aimed at developing a decision support system for ecological risk assessment of contaminated sites has proposed a tiered system including the triad method. This method integrates contaminant chemistry and bioavailability analyses with observed ecotoxicological effects in soil and groundwater. In this study the triad method was used to perform a risk characterization of a former surface treatment and metal industry, now used for the student union buildings of the Mälardalen University in Eskilstuna, Sweden. On the site, high concentrations of copper, zinc and nickel have been detected in the soil in a preliminary investigation of contaminant levels with XRF. For performing the risk assessment of the site according to the triad method, contaminant bioavailability, soil metal concentrations and soil toxicity were determined and an ecological assessment was carried out on four selected soil samples (one reference soil and three samples with low (B), medium (C) and high (D) contaminant levels). Contaminant bioavailability was measured through leaching (ISO TC 190/S7) and biouptake tests (DGT).
Att bo på Rådhusberget. Framtida potential ur befintliga hyresgästers perspektiv
Strömstad is a small city located on the Swedish west coast. Urbanization and development is acurrent issue for the municipally, as for many other in the current situation. The municipal housingcompany Strömstadsbyggen is one of the parties involved in the extensive development that mustbe implemented to meet the changes and developments which the issue holds.One area that is of interest in the discussion is Rådhusberget - this due to the existing infrastructureand unique qualities that the area holds. In order to achieve the best solutions possible for the area,Strömstadsbyggen wishes to listen to what the existing tenants at Rådhusberget thinks and feelsregarding the area and its future potential.This thesis has therefore been carried out in collaboration with Strömstadsbyggen and has beenaimed at identifying the current tenants' thoughts and opinions in the existing area of developmentand infill potential. The aim of this work was also to investigate how the tenants value their homeand local environment in its current state, and what their wishes are for the possible futuredevelopment of Rådhusberget.To achieve analyzable results concerning how the tenants perceive these aspects, an extensivesurvey have been carried out which were sent out to all tenants in the area.
Fysisk planering ur ett folkhälsoperspektiv ? fallstudie i Hjo
Hur samverkar de nationella folkhälsomålen med fysisk planering, och på vilket sätt kan folkhälsomålen beaktas för att förbättra förutsättningarna för ökad fysisk aktivitet hos barn? Denna studie är en fallstudie i Hjo kommun. Studien tar utgångspunkt i kommunens folkhälsoproblematik som visar att det finns en hög förekomst av övervikt hos barn. Intentionen är att undersöka vilka organisatoriska processer som kan underbygga det kommunala arbetet med folkhälsomålen, liksom att ta reda på vilka faktorer i den fysiska miljön som skapar förutsättningar för barns fysiska aktivitet. Avsikten med studien har varit att skapa ett underlag för Hjo kommuns översiktliga planering.
Miljöcertifiera eller inte? : En studie av beställares syn på miljöcertifiering av byggnader
Hållbarhet har blivit ett ord i tiden och används idag flitigt inom de flesta arbetsområden, stora som små. Dock verkar hållarbetsarbetet vara mycket tomma ord och arbetet är inte lika omfattande som viljan att arbeta långsiktigt. Byggsektorn står för en stor del av energianvändningen i Sverige och där finns stora förbättringar att göra. På senare tid har ett intresse för miljöcertifiering av byggnader uppstått. Det finns vissa fördelar med att använda sig av dessa system vid byggprojekt, det finns även en del nackdelar.
Marknadsföring av miljövänliga produkter på internet
Individer i samhället bär ansvaret för att bevara en hållbar konsumtion och göra bättre val som
främjar naturens resurser. Detta kan fördelaktigt nås genom köp av produkter som är bättre för
miljön. Det är dock viktigt att företagen som säljer dessa, tydliggör de miljömässiga
budskapen till kunderna. Att marknadsföra varor på internet kan anses vara effektivt för att nå
ut till en stor mängd. En låg reklameffektivitet kan dock påverka verksamhetens
försäljningsintäkter och företaget bör därför beakta hur digital marknadsföring kan användas
på ett effektivt sätt.
Utifrån tidigare forskning har brister identifierats, gällande avgörande aspekter i samband
med marknadsföring av miljövänliga produkter på internet.
Millesgården : vårdprogram samt förslag till förbättrad tillgänglighet
Millesgården is a museum on the island of Lidingö outside Stockholm. It contains the buildings which were the home and studios of the artist Carl Milles and his artist wife Olga. It also contains the grounds that originated as the garden of their home. Carl Milles later developed the garden into a sculpture park where a great part of the sculptors works are on display. In this report only the sculpture park is treated.
Alternativ uppvärmning av reningsverket på Utö - En studie av energibesparingsmöjligheterna i syfte att minska uppvärmningskostnaderna
The projects objective is to find an alternative method of heating (the current method being via electric heating) the sewage treatment plant on the island Utö in Stockholm?s archipelago in order to reduce the energy consumption and ultimately the cost for heating the plant. The project is given by ?Skärgårdsstiftelsen? (The Archipelago Foundation) and is a part of the larger EU-project ?Green Islands?.A model for the plants total heating demand is established in order to get a good perception of how much money can be saved using alternative heating methods. The heating demand model gives an annual heating demand of approximately 32 500 kWh and a maximum heating power demand of around 24,7 kW.
Dagvattenhantering och takpark för projektet PARK 1 : Ett utredande förslag
Som följd av den pågående urbaniseringen har de naturliga förutsättningarna för regn och smältvattnet att infiltrera i marken och återgå till sitt kretslopp på naturlig väg försvunnit i städerna. I Stockholm leds ungefär hälften av dagvattnet via VA-nätet direkt och orenat till reningsverken. Dagvattenflödet varierar kraftigt vilket orsakar toppar som överbelastar VAnätet och är svåra för reningsverken att hantera. Istället för att ledas ut i VA-nätet ska dagvatten strävas efter att hanteras lokalt. Arbetet lägger fokus på dagvattenhanteringen för takparken på ett nybyggnadsprojekt i Stockholm, projektet PARK 1.
LCC-analys av FTX-system : En jämförelse av centralt- och lägenhetsplacerat
This report is the result of a thesis conducted at the consulting firm Bjerking AB andis the final part of the Bachelor Programme in Construction Engineering at Universityof Uppsala. The work aims to investigate the costs and how the choice of ventilationsystem affects building projects during a long-term period. This report covers costssuch as investment, maintenance and energy but also how they affect residents andbuilders. Building regulations for energy consumption are expected to be tougher;therefore a comparison of two different heat recovery ventilation systems(HRV-system) was made. One system is based on a centrally placed unit that coversthe whole buildings ventilation through vertical shafts.
Standardisering av brukarrelaterade indata för energiberäkningar på kommersiella lokaler
In this thesis, input data for energy performance calculations on commercialpremises have been studied. In energy performance calculations, where internal heat gain parameters are unknown, template values that, in a reasonable way represent the activity in the room, are necessary. These values can be used as input data for whole-year calculations, or for calculations on shorter periods of time.The purpose of the Sveby project is to create standardized work practice in energy issues for the construction industry. The work in this thesis is conducted to correlate with the purpose of the Sveby project, with aims of contributing with information and guidelines for the continuing work with commercial premises.In this report, suggestions for template values for internal gains parameters, based on research and calculations in the field are presented. Suggestions on how these can be implemented in a user-friendly way for two energy performance calculation software are also given, VIP Energy and IDA ICE.
Undersökning av avfallshanteringssystem : För ett nyexploaterat område i Ekhagen, Jönköping
Outside of many Swedish households today, you will find a typical green wastecontainer. This container has not changed since its introduction, despitecomplaints about foul-smelling and its impractical system. Even if the system usedtoday, still is the most optimal choice, there is a lot of newly developedalternatives out there.Its purpose is to get a broader perspective on how a waste management systemcan be developed into a working, land efficiently and aesthetically pleasing systemof humans and the environment in a small residential area.The authors treat the residential area of Jära, Ekhagen, in Jönköping, which ismanaged by JM AB as a problem area in regards to waste management.The issues raised by the authors are the different waste management systems usedin the corresponding areas of the world, how to apply technical andenvironmental as well as the waste management facilities from financial aspects.In the process, the methods used were literature reviews, case studies and aninterview. The case study was done through a modeling of waste managementsystems in the area Jära and an interview was conducted with the company Envacworking with vacuum systems. Studies have been made by different systems n theareas around the world.The results show that using directives and guidance will reduce the environmentalimpact done without replacing the traditional system.
EKODESIGN I INDUSTRIN : En lägesanalys av producenters problem, drivkrafter och framtida utmaningar inom ekodesign
SammanfattningProdukter produceras idag i stor utsträckning för att tillfredsställa konsumenters behov varpåmiljöbelastningen eskalerar i takt med efterfrågan och produktionen som sker därefter. Lösningenpå problemet kan sammanfattas i ekodesign där miljöoptimering av produktutvecklingen skerutifrån ett helhetsperspektiv; råvaruutvinning, produktion, användning, återvinning, slutligtomhändertagande samt transporter.Teknik-konsultföretaget ÅF uppmärksammade detta problem hos svenska producenter ochstartade 2008 en intern sektion, EcoDesign center, som erbjöd sina kunder ekodesignrelateradetjänster. Utmaningarna och problemen hos kunderna har med tiden förändrats och för att centretska kunna erbjuda sina kunder relevanta tjänster, undersöks i detta arbete svenska producentersrelation till ekodesign idag.Syftet med arbetet har varit att kartlägga producenternas problem och utmaningar inommiljöanpassad produktutveckling och samtidigt utvärdera ÅF EcoDesign centers förutsättningaratt tillgodose sina kunder. Att utifrån denna kunskap komma med förbättringsförslag ochrekommendationer på hur centrets ekodesigntjänster kan optimeras har varit målet med arbetet.Resultatet visar att ekodesignarbetet inte är tillräckligt utbrett vilket främst beror på bristfälligefterfrågan av ekodesignade produkter. Kundefterfrågan är direkt kopplat till ekonomiskaincitament, företag drivs i vinstsyfte och utan en efterfrågan kommer ekodesignarbete inteimplementeras.
G2060
I dagens samhälle blir det allt mer intressant att spara energi, dels med tanke på miljön och dels föratt minska på utgifterna. Denna energi ska sparas på ett sådant sätt att effekten för användarna blirså liten som möjligt.I denna rapport beskrivs hur ett reglersystem kan byggas för att minska energiförbrukningen hosväxthus genom att reglera belysningen på ett effektivt sätt. Systemet är helt automatiskt vilket göratt användarna inte behöver tänka på styrningen av lamporna alls när väl systemet är uppsatt ochkonfigurerat.För att styra lamporna på ett bra sätt mäts det inkommande ljuset med en PAR-sensor. Lampornatänds och släcks därefter beroende på ljusmängden och även på hur varmt, eller kallt, det är iväxthusen.Styrningen av belysningen sker med en mikrokontroller från Microchip, en PIC18F4620 som ärprogrammerad i C18. Kringkomponenter som portexpasioner, klocka och reläer användes också föratt bygga ett bra reglersystem.Resultatet är att det är möjligt att bygga ett reglersystem med begränsad budget som styr lampornapå ett effektivt sätt.
Förutsättningar och hinder för att använda offentlig upphandling som styrmedel för en hållbar hantering av entreprenadberg
Large volumes of excavated soil and rock are generated in building- and construction projects. These materials need to be transported longer and longer distances due to the densifications of cities. The transportation affects the environment in terms of noise and emissions, but also makes high demands on road infrastructure. To reduce the transport distances an increased responsibility for the excavated rock generated needs to be taken. Responsibility can be increased through an introduction of means of control.
KORTSIKTIG PRODUKTIONSPLANERING I MINDRE FJÄRRVÄRMESYSTEM : En studie vid Strängnäs Energi AB
District heating covers around 80 % of the heating demand in apartment buildings and 10 % in single-family homes in Sweden. In the year 2010 the total input of energy to the Swedish district heating grids was about 70 TWh, which corresponds to 11 % of the total energy input to the whole energy system in the country. Through the combined production of heat and power the CHP-plants often reaches an efficiency of 90 % from energy in the fuel to produced heat and power. In order to keep the efficiency high it is important for the owners of the plant to have good knowledge about the plants performance at different operation points. Strängnäs Energi AB initiated this diploma work together with FVB Sverige ab in order to come up with a program for short term planning of the production of heat and power at the company´s CHP-plant.The work consists of three main parts.