Sök:

Sökresultat:

1114 Uppsatser om Flow chart - Sida 6 av 75

Elevers förståelse av fotosyntesen och dess koppling till andra organismer

The effects of the deregulation of the electricity market 1996 in Sweden on short-term hydropower regulation are unknown. This report investigates patterns in subdaily regulation in the Ångerman River Basin during the period 1993-2011. Differences in subdaily flows and zero flow events between the periods 1993-1995 and 1996-2011 were studied by analyzing hourly data from 8 regulated and 8 unregulated locations with four subdaily flow variation indices. No correlations between the market deregulation and the regulation intensity in the Ångerman River basin were detected. The number of days natural ranges of variability were exceeded and the magnitude of subdaily variation were significantly higher at regulated locations.

Modellering av ett bränslesystem i Modelica : tillämpat på ett obemannat flygplan

Mathematical models possible to simulate are of great importance in order to make successful projects in the aircraft manufacturing industry. An aircraft fuel system is very complex, containing pipes, tanks, orifices, valves and pumps. The principal of this thesis is using the tool Easy5, which no longer is considered reliable enough in terms of development and support. This thesis tries to evaluate the Modelica language as a possible alternative to Easy5. To make this evaluation, the components concerned in the fuel library in Easy5 are implemented to the Modelica language.

Opera i Stockholm : Stadsgårdskajen

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Mätning av abrasivflöde för vattenskärningsmaskiner

The content of the following report is the summarized result of three students thesis at Blekinge Institute of Technology in co-operation with Water Jet Sweden AB. This report will give the reader a description of principles how to measure the abrasive mass flow in a waterjet cutting system. The work began with a visit to Water Jet Sweden AB to get a closer look at the problem. When the analysis of the problem was done the criteria were defined in the form of demands and desires. The main task of the criteria was to guide the search for the solution. The work proceeded with an extensive search for abrasive flow meters along with obtaining information about flow measurement in general. When the search for abrasive flow meters resulted in nothing all the efforts were concentrated on finding a principle of measurement that could cope with the criteria.

Information ochmaterialflödesförbättrings analys

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Översvämningsrisker längs Funboån

Flooding events are no longer rare, floods occur all over the world. Accordingly, it is vital for the society and different authorities to work with flood mapping. To meet the goal of Uppsala kommun to map the risks of floods in Uppsala län, a map of the different areas around Funboån which are inside the area of risk for flooding have been developed.In the work, cross sections and the water flow have been measured. Moreover, an echo-sounding have been carried out in Funboån to map the bottom topography. From the bottom map and laser scanned data covering the study area, a terrain model was created.

Skapandet av ett integrerat ledningssystem

To be able to compete on the market environmental Management System has become an important part of operations work. However, many companies still haven?t implemented an environmental management systems due to lack of time and the high costs. One of the companies with this problem is Falu Bildemontering. Their goal is to accredited according to the ISO 14 001 certificate.

Del projekt inom ClampCal - Utvärdering av mätmetoder för temperatur, viskositet och densitet samt röregenskaper

The dissertation were performed on SP, Technical Institute of Sweden. The dissertation were carried out on the measurement technical department, this dissertation is a part of a bigger project, project ClampCal. One of SP?s returning assignments are flow-measurement. When flow-measurement is performed, the flow has to be stopped so that a meter can be installed in the pipes where measurement is going to take place. At every stop there is time delay in the flow which causes the customers to loose money. This is why SP wanted to find a better solution so that measurement can be done without any stops in the flow. Usage of a so-called Clamp-on meter was considered, but since the measurement uncertainty is too large it takes some investigation on the parts where the largest uncertainties occur and thus find a solution that can diminish the uncertainty as much as possible. The parts that were considered to have an opportunity to reduce measurement uncertainties were the fluid temperature, its characteristics and the pipe geometry and its characteristics. For the fluid temperature a Pt100-sensor with four different radii for various pipes was used.

Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Design för Flow : En analys av designkriterier för användbarhet

Human Computer Interaction (HCI) handlar om att utveckla produkter med god användbarhet. Med användbarhet menas att system ska vara lätta att använda och lära. Jakob Nielsen är en av förgrundsfigurerna när det gäller riktlinjer för hur detta ska uppnås. Han har utvecklat tio kriterier som kan användas för att ett så bra system som möjligt ska kunna utvecklas.På senare år har forskare börjat se till, inte bara tekniska aspekter utan även till de känslor som användaren kan tänkas uppleva under det att denna interagerar med en webbsida. Ett flertal forskare har utvecklat teorier kring begreppet Flow.

Akustisk design av studiorum för musikinspelning

Detta projekt genomfördes i samarbete med akustikern Erling Nilsson på företaget Ecophon i Hyllinge. Uppdragsgivare var musikproducenten Magnus Ågren som äger studion Flow Music i Malmö. Uppgiften var att förbättra akustiken i ett av Flow Musics studiorum. Rummet hade före projektet en hård och obehaglig akustik. För att komma fram till ett åtgärdsförslag specificerades först hur enskilda akustiska egenskaper skulle påverkas för att ge ett så bra resultat som möjligt.

Opera i Stockholm, Stadsgårdskajen

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

En tand för en tand och en våtmark för en våtmark - ett återskapande värt pengarna? : En undersökning av nyttan och kostnaderna av att restaurera våtmark med hjälp av Contingent Valuation Method.

The goal of this study is to examine what five teacher?s impression of the teacher?s role is in their previous years. How important the ?joy at work? is in relation with the educational progress? And what aspects that contributes to the? joy at work? and what obstacles that stops them. The essay will also go through the concepts of a teacher role, with connection to the theoretical perspectives of Csikszentmihalyi?s Flow and Antonovsky?s Salutogenesis (KASAM).The method I used was interviewing five teachers and I used Larsen?s chapter of ?content analysis? as a basis, I also used Flow and KASAM as theoretical references in my analysis.

En flödesutjämnande driftstrategi för Uppsalas fjärrvärmesystem : En ändrad styrning av framtemperaturen

This thesis examines a possible control strategy to minimize flow fluctuations in Uppsala?s district heating system. High variations in flow rate may lead to complications caused by hydraulic constraints in the district heating system. These complications, such as inadequate pressure and temperature levels, increase the risk of heat delivery failures. It is therefore important to avoid such situations both for the producer and for the customers.Typically, the forward temperature is controlled by using a rough correlation with respect to the outdoor temperature.

Effektivisering av produktionsgrupp : Improving the efficiency of a production group

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

<- Föregående sida 6 Nästa sida ->