Sök:

Sökresultat:

828 Uppsatser om Fire equipment - Sida 42 av 56

Utveckling av nytt koncept för positioneringsslid

A manufacturing machine at the engineering company Sandvik Coromant has a positioning table which task is to move an item linearly. The positioning table has a linear motor capable of high velocity and acceleration. This makes it possible to achieve short cycle times and a more profitable production.The purpose of this thesis is to bring forward a new concept which is more adapted to the requirements of the positioning table. The reason is that the current positioning table provides an unnecessarily positioning accuracy of 0.01 mm, while the requirement for the positioning accuracy is just 0.1 mm. The goal is to reduce manufacturing and component costs.To develop a suitable solution an approach for the concept development process has been performed.

Förstudie -  Nya koncept för ett effektivt flöde

Examensarbetet har genomförts på den produktionstekniska avdelningen på Volvo Construction Equipment i Hallsberg.Syftet varatt ta fram ett nytt koncept för hyttsvetsproduktionen på fabriken;hur produktionsprocessen skulle kunna se ut i framtiden. Man vill göra flödet i linan mer effektivt med avseende på kvalitet, flexibilitet samt eliminera tidsslöseri som idag är ett problem.När fabriken påbörjade sin produktionproducerade man två olika varianter av hyttertill anläggningsmaskiner, idag har man ökat produktionen till fyra varianter. I takt med att varianter samt orderingång ökat har man byggt på befintlig produktionslina istället för att utveckla en ny, anpassadlinafördet nya läget. Resultatet har blivit att maxkapaciteten är nådd och linan klarar inte att hantera en planerad produktionsökning.En grundlig analys av hyttsvetsprocessen, innehållande intervjuer med bland andra platschef, teknisk chef och flera tekniker genfördes för att få förståelse för processen. Övrig information såsom effektivitetsmätningar på utrustning, värdeflödesanalyser och avvikelserapportering har funnits tillgängligt och legat till grund för arbetet.

Geotermisk fjärrvärme i Gunsta

Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW. To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.

CE-ma?rkning av produkter under byggproduktfo?rordningen

The purpose of this study is to achieve an understanding of how a CE- marking process is conducted and to identify the relevant factors that must be considered in such a process. We have conducted our study at Lo?vhults Svets & Smide AB (Lo?vhults) in Skruv, Sma?land Sweden, which are manufacturing brackets for small covering constructions.To understand how a CE-marking process is conducted several documents and provisions have been reviewed to achieve a basic understanding and insight of the subject. It thus led to that guideline ETAG 015 were studied and the factors to be considered in the CE-marking of brackets were identified. Together with Jan-A?ke Johansson at Lo?vhults we agreed on four different brackets to investigate for a potential CE-marking.

Miljöfarliga transporter till sjöss : Kartläggning och riskanalys

An increasing number of chemicals are being transported by ships along the Swedish coastline. Many of these chemicals may pose a threat to the environment. Accidents and spills are luckily rare, but nonetheless it is important to be prepared for a possible chemical spill. The Swedish Coast Guard is responsible for responding to chemical spills at sea, and has both equipment and trained personnel for the purpose. In order to prepare for a possible accident one also needs to know what is currently being transported at sea.

Projekteffektivitet inom tekniska utvecklingsprojekt : Vilka faktorer påverkar projekteffektivitet och hur kan dessa mätas?

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Kejsarsnitt på nötkreatur : indikation, frekvens och utförande

The background of this study is an article in the hunting magazine ?Svensk Jakt? where Karl Hedin claims that his sawmills has not noticed any significant moose damages in the timber. The purpose with the study is to find out the causes to the moose explosion and what it has led to in today?s forests. A questionnaire has been sent out to sawmills in the region Dalarna with the purpose of finding out if sawmills receive moose-damaged timber and what they think about how they foresee future development. There were two causes of the moose explosion, that had effects on the moose population. The first cause was that the moose hunters wanted to raise the moose population, and by raising the calf shooting and by saving the cows they succeeded. The second cause was changing methods in Swedish forestry.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Byggnadens andra skepnad : En anpassning för att möta samhällets behov och krav

Population growth leads to an increased need for new buildings, both residential and commercial. The regulations of structural design also changes with time. From a sustainable community perspective it may be profitable if existing buildings, that no longer performs their original function, are reconditioned. Knowledge and understanding of the surroundings of the residence must be available. Regulations regarding accessibility to all has increased.

Stommaterial för villor - trä eller betong?

We have the tradition in Sweden to build villas and houses with a wooden framework. It has become natural for us because we have so much forest in our country. Building with wood has advantages, it is easy to process, but also disadvantages, as it is sensitive to moisture.Finland has long made use of the thermal blocks to build villas. It is a type of bricks that are a bit like a sandwich element, with a core of EPS and concrete on both sides of the core material. The concrete is hollow, so that after the walls has been bricked up you pour concrete into the hollow bricks.The issue of this report is to find out if concrete can be an alternative to wood as framework material in villas.

Taktisk planering med geografisk hänsyn : fallstudie med Heureka PlanVis på SCA Skogs distrikt Liden

SCA is the largest private owned forest owner in Sweden, with an ownership of 2 million hectares of productive forestland. To manage the planning of such large areas and to fit the traditional organization structure of a Swedish forest company, the planning approach is subdivided into three stages; strategic, tactical and operational. The strategic part, based on a statistic sample of stands, returns a harvest level estimate which should then be implemented at actual sites in the tactical part. This procedure can lead to incompatible solutions as the strategic solution is not necessarily possible to translate into actual sites in the tactical plan. The geographic aspect is important in tactical planning due to the large costs for moving equipment and maintenance of a large number of forest roads.

Vem är det som kör egentligen? : maskinanvändande och könsroller inom lantbruket : en intervjustudie med kvinnliga lantbrukare

In this report female farmers use of technical equipment is investigated. There is little research made on this subject in Sweden, therefore this report can be seen as an explorative study. Research makes it clear that machinery, throughout history and even today, has been seen as a male area. Heavy machines are often associated with the same attributes as masculinity. Force, power, efficiency and control are some examples.

Mek Stans 07

Mek Stans 07 is a machine developed for Tetra Pak in Lund as a 10p candidate theses project at Halmstad University. The commission behind the project involved development of a machine that punches holes in packages for the inspection division at Tetra Pak. The task for the machine was to facilitate the process of making openings for testing in the company?s other equipment. Researches on different methods of cutting, types of automatization and possible designs were made. To implement the project a design and construction from the base where chosen.

Hur ansvariga vid vägarbeten ser på sin uppgift kopplat till säkerhet och framkomlighet

In 1997, the Swedish parliament adopted a decision on Vision Zero (nollvision) in the road and transport system. Vision Zero means that no one should be killed or seriously injured in traffic accidents in the road transport system (Prop. 2003/04: 160). For the Transport Administration in Sweden (Trafikverket), this means increased demands on security and signage at road work sites around the country. This in turn means increased demands on the contractors that carry out road work for the Transport Administration.

<- Föregående sida 42 Nästa sida ->