Sök:

Sökresultat:

608 Uppsatser om Equipment - Sida 29 av 41

Prevalence of selected infectious diseases in Samoan dogs

SCA is the largest private owned forest owner in Sweden, with an ownership of 2 million hectares of productive forestland. To manage the planning of such large areas and to fit the traditional organization structure of a Swedish forest company, the planning approach is subdivided into three stages; strategic, tactical and operational. The strategic part, based on a statistic sample of stands, returns a harvest level estimate which should then be implemented at actual sites in the tactical part. This procedure can lead to incompatible solutions as the strategic solution is not necessarily possible to translate into actual sites in the tactical plan. The geographic aspect is important in tactical planning due to the large costs for moving Equipment and maintenance of a large number of forest roads.

Utökning av mätområdet för turbinverkningsgraden på avgasturbo

The Goal with this Master of Science thesis is to expand the possible turbine efficiencymeasurements on an exhaust turbocharger. It was done as a part of the CICERO competencecentre. To feed the turbine with air a special flow rig has been used. Instead of loading theturbine by just restricting the compressor flow a docking system for an electrical dynamometer isdesigned to use the dynamometer as an additional loading source. By using an electricaldynamometer as loading device for the turbine, measurements are not depending on compressorperformance.A large part of the work consists in designing accessories for the dynamometer.

Smörjning Av Lager

The work thesis was performed at Assalub a company which is situated in Åtvidaberg. The company works with developing, manufacturing and marketing Equipment for handling of lubricants for light and heavier industry. The work thesis it is based on a inquiry Assalub got from MacGregor which is a company within cargo solution, from port to offshore system.For unloading grain and other material from the ship cargo it is used combined inlet feeder and screw conveyor, there the inlet feeder is drilling down through the cargo and feed the screw conveyer with material to further destination. At the bottom of the screw conveyer and the inlet feeder there is a bearing that keep the parts together. However the lubrication of the bearing must be made manually.

Buntning av grot med lastbilsmonterad utrustning :

During the transportation of logging residues (LR) the material´s low density is a problem that results in low use of pay-load capacity. Comminution or compression of LR are possible methods to increase pay-loads. In the present thesis studied a bundling machine which was mounted on a truck chassis, and the subsequent transport and crushing. The truck bundler created bundles that were larger and longer than other bundling Equipment on the market. The objectives were to determine the total time consumption and its allocation over work element and machinery, to measure dry matter (DM) content of green and brown LR-bundles.

Analys och organisering av ö-drift för en samförbränningsstation vid Åmotsfors bruk

Åmotfors Bruk AB (ÅBAB) has today an inefficient production of steam for the manufacturing of paper. Unpredictable energy prices and modernisation of the current Equipment has been the underlying factors to invest in a thermal power plant, mainly driven by garbage. This facility will not only use the steam for paper production, it will also generate electricity through a steam turbine. Today, when a fault on the supplying line occurs which leads to disconnection of the external grid, all the support of electricity to Åmotfors Bruk (ÅB) will disappear. This will lead to major interruptions in the paper production, which will cause severe economical losses.

Embryonal näringsförsörjning hos sandtigerhaj och kortfenad makohaj

In this report female farmers use of technical Equipment is investigated. There is little research made on this subject in Sweden, therefore this report can be seen as an explorative study. Research makes it clear that machinery, throughout history and even today, has been seen as a male area. Heavy machines are often associated with the same attributes as masculinity. Force, power, efficiency and control are some examples.

Emballage för väggelement i trä : Paketering, hantering, lager och transport

As a company it is required to work with strategies to minimize costs such as packaging and logistic costs. The increased market of industrial produced wooden buildings results that the time and the cost which the packaging of prefabricated building elements consume, is experienced to be in greater need of development than before and demands a better solution. The aim with this dissertation was to discover how the development of the handling of the packaging can improve the packaging process. The goal was to present improvement proposals for a simplified and thereby a more efficient production in time and cost perspective.The packaging process which includes packaging, handling, storage and transport were studied. Interviews were made with participants from the market for manufacturers of wooden houses and a case study was made at the company A-hus.

HAVS ombord - en studie av hand- och armvibrationssyndrom och dess förebyggande åtgärder

On board ships different type of maintenance activities take place. Some of those require working with vibrating handheld tools. Traditionally there is a high awareness of the risks with different type of duties such as protecting the skin from oil or other chemicals, the eyes from splashes and hearing from high noise levels. The experience we have from our time as on-board cadets are that there is less information about vibration hazards available compared to the information concerning other hazards on board.There are threshold values that workers, by law, are not allowed to exceed when working with handheld vibrating tools. The purpose of this study is to investigate how common the use of this type of Equipment that can cause damage by vibrations, to the hands and arm amongst the deck crew, and if the crew informed about the risks involved.

Utveckling av nytt koncept för positioneringsslid

A manufacturing machine at the engineering company Sandvik Coromant has a positioning table which task is to move an item linearly. The positioning table has a linear motor capable of high velocity and acceleration. This makes it possible to achieve short cycle times and a more profitable production.The purpose of this thesis is to bring forward a new concept which is more adapted to the requirements of the positioning table. The reason is that the current positioning table provides an unnecessarily positioning accuracy of 0.01 mm, while the requirement for the positioning accuracy is just 0.1 mm. The goal is to reduce manufacturing and component costs.To develop a suitable solution an approach for the concept development process has been performed.

Förstudie -  Nya koncept för ett effektivt flöde

Examensarbetet har genomförts på den produktionstekniska avdelningen på Volvo Construction Equipment i Hallsberg.Syftet varatt ta fram ett nytt koncept för hyttsvetsproduktionen på fabriken;hur produktionsprocessen skulle kunna se ut i framtiden. Man vill göra flödet i linan mer effektivt med avseende på kvalitet, flexibilitet samt eliminera tidsslöseri som idag är ett problem.När fabriken påbörjade sin produktionproducerade man två olika varianter av hyttertill anläggningsmaskiner, idag har man ökat produktionen till fyra varianter. I takt med att varianter samt orderingång ökat har man byggt på befintlig produktionslina istället för att utveckla en ny, anpassadlinafördet nya läget. Resultatet har blivit att maxkapaciteten är nådd och linan klarar inte att hantera en planerad produktionsökning.En grundlig analys av hyttsvetsprocessen, innehållande intervjuer med bland andra platschef, teknisk chef och flera tekniker genfördes för att få förståelse för processen. Övrig information såsom effektivitetsmätningar på utrustning, värdeflödesanalyser och avvikelserapportering har funnits tillgängligt och legat till grund för arbetet.

Geotermisk fjärrvärme i Gunsta

Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW. To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.

Miljöfarliga transporter till sjöss : Kartläggning och riskanalys

An increasing number of chemicals are being transported by ships along the Swedish coastline. Many of these chemicals may pose a threat to the environment. Accidents and spills are luckily rare, but nonetheless it is important to be prepared for a possible chemical spill. The Swedish Coast Guard is responsible for responding to chemical spills at sea, and has both Equipment and trained personnel for the purpose. In order to prepare for a possible accident one also needs to know what is currently being transported at sea.

Projekteffektivitet inom tekniska utvecklingsprojekt : Vilka faktorer påverkar projekteffektivitet och hur kan dessa mätas?

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in Equipment and software is required. This means higher costs for the companies.

Kejsarsnitt på nötkreatur : indikation, frekvens och utförande

The background of this study is an article in the hunting magazine ?Svensk Jakt? where Karl Hedin claims that his sawmills has not noticed any significant moose damages in the timber. The purpose with the study is to find out the causes to the moose explosion and what it has led to in today?s forests. A questionnaire has been sent out to sawmills in the region Dalarna with the purpose of finding out if sawmills receive moose-damaged timber and what they think about how they foresee future development. There were two causes of the moose explosion, that had effects on the moose population. The first cause was that the moose hunters wanted to raise the moose population, and by raising the calf shooting and by saving the cows they succeeded. The second cause was changing methods in Swedish forestry.

<- Föregående sida 29 Nästa sida ->