Sökresultat:
2096 Uppsatser om Equipment for precision measurements in 3D for underwater applications - Sida 41 av 140
Utveckling av heltäckande gångbord
This thesis work is a 30hp D-level assignment in design as a co-operation between MälardalenUniversity and Scania CV AB in Södertälje. The purpose was to develope a close fitted catwalk.The market has seen an increasing value for these types of applications and have the ambition to keep up with the rest of the competitors. The catwalks of todays standards shall be estetical attractive, have a non slippery surface and be costefficient.While working with this project I have spent a lot of time with the concept proposals and with the evaluation of the concepts, resulting in a final CAD model and a approximation of the cost estimate. The new catwalk fulfils all the new recommendations and rules as sharp edges, ADR, the height of the stepup and a non slippery surface with built in drainage..
Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Smart plombering och märkning
The background for this degree thesis is a need to replace the existing seal used to protect equipment containing secret or sensitive equipment used by Swedish Defence. The target design should satisfy both the need for tamper evidence and reduce Life Cycle Cost. In developing a new design for a seal, additional benefits such as improved logistics support and indication of attack methods such as heat and solvents have been considered.The lack of guiding principles for end users of seals became evident during the interviews. Major concerns for the future are education of users, information about actions if a seal is broken and user liability.The design work was divided into several phases. A feasibility study was performed including investigation of theory of labels, materials and possible technologies.
Landskapsplanering ur ett hållbarhetsperspektiv :
Environmental problems are accelerating with energy consumption and the release of greenhouse gases as the major issues. This affects landscape planning mostly through environmentally hazardous transportation and heating of buildings. In environmental work, the term "Sustainable development" is often used. This term was coined in the Bruntland report in 1987. A number of frameworks have been developed to clarify the term and to remind the user about relevant aspects of sustainability.
Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Standardisering av förpackningar på HABO AB
This thesis project has been written and accomplished in cooperation with HABO AB. The objective of the project was to develop a standard stated packaging system. The background to this is that HABO is not pleased with the system currently in use. The system which HABO is currently using consists of to many sizes. The largest benefit of a standard stated system is that it becomes much easier to organize the packaging with the aid of a computer program.
Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Föroreningstransport med dagvatten - Utveckling av reningsmoduler för modellverktyget Mike Urban SWQ (Storm Water Quality)
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Mätningar och undersökning av elkvaliteten i elnätet på reningsverket GRYAAB, i Göteborg
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Effektivisering av dataflödet mellan anläggningsmodell och maskinstyrning - En översikt av flödet från konsult till entreprenör
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Inventering av bitumenbundna lager med hög stabilitet ?hård asfalt? anpassade för stora hjultryck på industri- och hamnytor
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.