Sök:

Sökresultat:

4449 Uppsatser om Energy survey - Sida 27 av 297

Renovering av miljonprogrammet till Umeå kommuns nybyggnadskrav för energianvändning

A lot of houses built during the Million Homes Programme are in need of major renovation. Today?s technology and materials are better than in the 60?s and 70?s. Both Swedish government and the European Union have set climate goals regarding energy consumption by 2020 and 2050. Achieving these goals would require better standards in buildings than the Building regulations demands, such as Umeå municipality?s construction requirements for new buildings.The report aims to investigate if a renovation of apartment buildings from the Million Homes Programme can reach Umeå municipality?s construction requirements.

Analys av systemfaktorers påverkan på tillförlitligheten i distributionsnät

In this master thesis outage statistics covering tree years from two distribution grids are analyzed with the purpose to deduce which factors yield outages. The statistics are extensive therefore allowing in-depth analysis of both customer and system related factors. From this starting point and as a model of explanation energy not supplied is studied as the consequence and the measurement of the inconvenience caused by outages. Different methods for calculating energy not supplied are developed and studied and put in comparison to the method used in Network Performance Assessment Model, which is the Swedish frame work for regulating electricity distribution.Analysis of the outage statistics show a relation between the type category of customer and outages that can be deduced to the variance and the density associated with that customer category. Prioritization of different customer categories is elevated also in this aspect.

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Miljöbedömning av olika behandlingsmetoder för organiskt hushållsavfall, slakteriavfall och flytgödsel

Organic material used for biogas production can also undergo other treatments. The emissions and impact from the different treatments are evaluated in this environmental assessment, with a focus on energy and climate. The materials included in the study are organic household waste, slaughterhouse waste and liquid manure. Other than biogas production, the possible treatments for organic household waste and slaughterhouse waste are incineration and composting, and for liquid manure storing and spreading. The analysis is based on data and information from current and relevant literature, and relates to the conditions in the Swedish energy system.

Vindkraftens framtida scenarier

In several countries that have been early in the development of wind farms, there is today a second hand market for the used wind turbines. The European Union (EU) has established a waste hierarchy in order to minimize throwaway mentality. The second hand market is a part of this as the steps are to minimize, reuse, recycle, extract energy and landfill.In order to promote the development of renewable energy, there are energy certificates for the producers that provide it, wind power being one type of renewable energy. After 15 years the energy certificates for a specific wind turbine are no longer paid, and after that there are several different scenarios for the wind turbine. The scenarios investigated in this bachelor?s thesis are export of the wind turbine to countries that are not as far along as Sweden in their development towards renewable energy, selling in Sweden to individuals, and recycling of the wind turbine, as it mostly consists of metals and therefore is recyclable.

Elektrisk skorstenständare

Between 1965 and 1974, the Swedish Parliament decided to build one million dwellings, called Million Program. The million program buildings were erected with new, untried design solutions, in a short range of time, and at low cost. The residential buildings from that time are now greatly in need of renovation. The municipal housing company, Gavlega?rdarna, renovates and improves the energy efficiency at some of it?s apartment buildings in the district Sa?tra, Ga?vle.

Från alger till biodiesel - Den italienska drömmen?

This project aims to investigate whether algae can be used for biodiesel production in Italy. Algaes are a good option since they are fast growing and do not occupy arable land. The aspects that have been considered are growing, harvesting, which algae strain that is most suitable, extraction of oil, the production of biodiesel and where in Italy this could be possible due to climate. Cost? and energy calculations have been made to investigate if biodiesel produced from algae would be profitable. During the production of biodiesel there are several residues obtained. When the oil has been extracted from the algae, biogas is produced from the residual biomass by anaerobic digestion and then the electricity that can be produced is supplied to the production of biodiesel.

Effekten av olika andelar grovfoder och kraftfoder i foderstaten på mjölkproduktion, välfärd och hälsa hos mjölkkor

Dairy cows transform grass to milk with help from ruminal microorganisms that can digest indigestible fiber in their feed. The digestive system of the cow is adapted to a diet consisting of forage and disorders like acidosis, laminitis and abomasal displacement can occur if the feed contains too much starch. To achieve the highest production possible the cow has to be given a high amount of concentrate or grain as the difference in milk yield is significant, approximately 1000 kg energy corrected milk per cow and year between conventional and organic cows that are fed a lower versus a higher share of forage. If the cow shall be able to eat the same amount of energy from forage as from grain or concentrate the eating- and rumination time gets longer and she might not be able to eat enough, which will result in a lower milk yield and will make it harder for the cow to recover from the negative energy balance that originate from the beginning of the lactation. Fat and in a sense protein content differs also depending on if the cow is given a high or low share of forage..

Bostadsbyggande i Skövde fram till år 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 27 Nästa sida ->