Sökresultat:
3861 Uppsatser om Energy power - Sida 26 av 258
Does nuclear power plants affect house prices? : a hedonic price model of Forsmark nuclear power plant
Nuclear power plants existences have been well debated since the 70s (Swedish radiation safety authority, 2014). Accidents, risk and presence connected to nuclear power plants have been part of many studies around the world. Recent studies have shown a connection between prices of houses and the distance and presence of nuclear power plant in a surronding area of the house. This paper uses Hedonic price modelling to investigate the willingness to pay for an increased distance to the Swedish nuclear power plant, Forsmark. For the dependent variable selling price was used and the independent variables were number of rooms, living area, other area, lot size, selling year, building year and distance to Forsmark.
Att genom fiktion skildra en verklighet : En kvalitativ studie i hur maktstruktrurer beskrivs i BBC:s tv-serie The Hour
The objective of this study was to investigate how power relationships between journalists and politicians were shown in the fictional BBC tv-series ?The Hour?. We wanted to investigate how these power structures is narrated by the producers of the series and what impact the narration could have to the audiance of the 21th century.We choose to analyse a total of 12 scenes from all of the six episodes, which are all set in Britain during the beginning of the Suez Canal crisis in the 1950?s, all seen from a BBC editorial point of view.In our analysis we chose to use two different kind of methods, the first one was a situation analysis and the second one a text analysis. The situation method was useful to get a perception of the relations between the participants .The text analysis we used to analyse what was said in the tv-series and to interpret underlying motives.The fictional form necessitated a personalization of power structures, in the sense that each and every power was represented by a single character; political power was for instance represented by the character of Angus McCain.
Utveckling och konstruktion av dämpare och låssystem för vågkraftverk
The division of Electricity at Uppsala University is developing a wave energy converter(WEC) consisting of a linear generator connected to a bouy at the water surfacethrough a wire cable called the connection line.During extreme conditions, the wave power plant will experience forces up to 500kN, which lead to unnecessary wear and will ultimately cause the failure of theconverter. To prevent this there is a need for a damper.The wave energy converter works at a maximum efficiency when the translator?sare centered with respect to the stator. Due to tidal movements the position of thetranslator can deviate. There for a mechanical divice that will compensate for this isneeded.This report describes the further development of an earlier project where a tidalwave compensator for a wave energy converter of Seabased AB was developed.
Balansering av vindkraft och vattenkraft i norra Sverige
This master thesis was initiated with the aim to answer at what level of installed capacity of wind power in the northern parts of Sweden it would be beneficial to improve the transmission capacity from the northern Sweden. During the process of this work the aim has changed to try and create a model that can be used to analyze how well the hydro power installed in the northern Sweden can even out the quick changes in wind power production.To create a good model of all hydro power in northern Sweden is a very large job, unfortunately too large for a master thesis. This report therefore ends with an extensive analysis of the simplifications that have been made and their effects as well as a list of the future work that has to be done.The model that has been created have shown to be effective and produce good results. The conclusions that can be made is that the northern Swedish hydro power have very good possibilities to balance the wind power production. Only a few cases where water have been spilled even though there has been some free capacity has been discovered.
Spillvärmeåtervinning
SAPA´s resource of waste heat is the basis for this thesis to investigate the possibility of energy assets in their cooling water and possible uses for it. The energy in the waste water is greater than the current need which has three uses which are (1) heating the factory, (2) converting liquid propane to propane gas and (3) local domestic heating. The average energy load that is available is 1, 7 MW and the average temperature in the cooling water is 41°C. The total energy load at dimensioning out side temperature is approximately 1,6 MW for the three current uses. The temperature is currently too low to be used directly in the existing systems so an upgrade is needed.
Lärares erfarenheter av arbete med elever som far illa
The purpose of this study was to investigate the association between physical activity and perceived stress, energy and musculoskeletal disorders among office-workers and warehouse-workers and also to see if there were any differences depending on work-place and gender. The method that was used to collect data was three different validated questionnaires that measured stress and energy (the Stress-Energy questionnaire), musculoskeletal disorders (intensity and localization of pain, a Pain Drawing questionnaire with a VAS-scale) and physical activity (IPAQ ? the short version). Eighty-eight workers participated in the study. Forty-seven of them were office-workers and forty-one were warehouse-workers.
Viltbroar i Sverige. En jämförelsestudie på rörbroar av stål som alternativ till traditionella betongbroar vid uppförande av faunapassager
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Utredning av Aktiv designprojektet vid RV40. Inriktning mot utveckling av objektiv kontrollmetod med avseende på framtida funktion
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Undersökning av samband mellan MCV och geotekniska parametrar. Analys utifrån fält- och laboratorieförsök på finkornig jord
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Energieffektivisering av två flerbostadshus i Västerås, byggda 1963 : Enerigbehovsberäkning med programmet VIP+
AbstractThe background for this study is that there were a great amount of buildings constructed in Sweden in the years 1965-1975 in a program designed to create one million apartments in a time-period of ten years. These buildings are now, somewhat forty years later in most cases in very poor condition and the need for renovation is great and urgent. This has become a growing problem and more and more voices are being heard pointing towards the vast and extremely expensive task of renovating these buildings. Lately, it has also been more and more important for buildings to be energy-efficient and sustainable environment friendly.In recent years there has been an atempt to solve these problems by renovating such buildings but at the same time making them very energy-efficient. This is in some cases being done by isolating the shell of the building and changing the ventilation-system and so forth.
Vanmakt och motmakt i personliga assistenters relationer till brukare
The aim of this study was to examine the aspect of power in the relationship between the personal assistant and the disabled person he or she works with (the user). The study was based on interviews with five personal assistants who worked for private companies that provided personal assistance. Seven themes were identified and discussed. These were: the users amount of control over the assistance given, the workplace environment, the working conditions, the organization of personal assistance by private companies, the assistants recourses and usage of power and the users participation in chores. To analyze these themes I used Foucault's theory of power and the perspective of Human Resource.
Lärk eller Impregnerat ? en kvalitativt jämförande livscykelanalys av sibirisk lärk och svensk tryckimpregnerad furu
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Jämförelse av frånluftsvärmepumpar
In order to reach the environmental targets, set up by the EU, there are many measures taken to make Sweden more energy efficient. In the housing and real estate sector, an installation of an exhaust air heat pump that reuses the heat in the exhaust air in order to lower the amount of acquired energy, is an example of such an action. The recovered energy can then be used for heating of radiators and tap water. This report aims to evaluate and compare three different systems using exhaust air heat pumps regarding COP, degree of coverage and cost savings. This study was delimited to only account for apartment buildings.The theory chapter describes the different conditions and factors that affect a building?s energy balance.
Kvalitetskontroll av trafikmätningssystem ? En studie om noggrannheten hos induktiv slinga, slang, KomFram, video och radar i olika trafikmiljöer
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Analys av hur byggnadens höjd påverkar energiförbrukningen i flerbostads- och kontorshus
This diploma work has been carried out in collaboration with the building contractor Sh Bygg Fastighetsutveckling AB in Uppsala with the intention to investigate how the height of a building affects various energy aspects such as transmission losses, infiltration, and the specific energy usage. Three different reference objects have been studied. The reference objects have been simulated for four different heights in the calculation program VIP-Energy.The results show that an increase in floor number can lead to both advantages and disadvantages. As the number of floors increases, transmission losses per square meter floor area decreases. However, as the height of the building increases, the reduction rate decreases.