Sök:

Sökresultat:

4212 Uppsatser om Energy Systems - Sida 17 av 281

Energibalansen för ett nytt flerbostadshus i Mellansverige : Beräkningar intervjuer och analys av energikraven i Boverkets Byggregler

Abstract   This degree project comprises 30 credits, i.e. 20 weeks of work. The work mainly deals with the energy balance for a multi-family house in Västerås and the requirements for energy conservation in the Swedish building code, BBR. Calculations of the energy balance are supplemented by a number of interviews. Energy conservation in general has become more important in recent years and the subject is in line with increased public awareness. This importance and attention is explained by environmental problems in general and global warming in particular, but also by rising energy prices.

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Solceller pa? Uppsalahems fastigheter : Ekonomisk potential fram till 2030

Uppsalahem is the leading housing corporation in Uppsala with its over 160 real estate properties. Uppsalahem is owned by the municipality of Uppsala, which has a climate and energy goal that aims for 100 MW of solar energy to be installed in Uppsala by 2030. The 100 MW goal, combined with Uppsalahem?s environmental policy, is a strong incentive to investigate the possibility of installing PV modules on the many available roof areas that Uppsalahem possesses. The objective of this thesis is to create a foundation for future decisions regarding PV systems for Uppsalahem.

Application Lifecycle Management: : En studie av två Application Lifecycle Management system och deras stöd för systemutveckling i projektform

Application Lifecycle Management (ALM) is a genre of computerized systems which allows system development corporations to efficiently and more easily manage, maintain and handle the applications lifecycle. These ALM systems have a wide variety of tools which can be integrated to enable and support collaborative work, while they act at the core of the organisation. Todays ALM systems support flexible system development methods throughout the entire development process. This paper focuses on a case-study of a Swedish business- and technology corporation and their use of two ALM systems with an aim to unravel the differences between these systems and their functionality to serve as a basis for decision making regarding their utilization of best practice with their ALM-Systems. Meanwhile we studied their approach to ALM systems to see if they were using them according to the initial idea of ALM systems.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hållbara projekteringsverktyg : Från byggnadsinformationsmodell till simulering ? en utvärdering av Revit och Virtual Environment

This study examines the use of building modeling and energy simulations in the design process  of  a  building.  The  take-off  point  is  the  notion  of  energy  simulations  being needed early and throughout the building design process, and that the lack of energy simulations may be explained by the fact that they are time consuming and therefore often too expensive. A greater interoperability between software tools used by relevant disciplines,  such  as  the  architect  and  the  energy  specialist,  would  create  smoother workflows, which would reduce this cost and open up for more frequent and iterative energy  simulation  processes.  The  study  is  an  assessment  of  the  modeling  tool  Revit and  the  simulation  tool  Virtual  Environment  and  whether  they  can  create  smoother workflows, and make leeway for a more frequent use of energy simulations throughout the  design  process.  It  also  investigates  the  limitations  of  what  can  be  examined  by simulations in Virtual Environment. This will hopefully help clarify the future role of energy  simulations  in  design  processes.  The  method  is  a  trial  by  error  approach  of testing the two software tools by building and simulating a model. The results of these tests  show  that  the  workflow  is  not  optimal  (and  therefore  time  consuming)  for frequent  and  iterative simulations  throughout the  design  process,  but  it  also  reveals some  great  possibilities  of  what  can  be  performed  with  these  two  powerful  tools  at hand.  Further  development  with  regards  on  platform  independency  of  the  building information  model,  including  seamless  exporting  and  importing,  seems  necessary  to strengthen the future role of energy simulations..

Samband mellan lågt tryck i dricksvattenledningar och magbesvär - En utredning av hur lågt tryck på dricksvattenledningsnätet vid lagning av läckor påverkar sjukligheten hos Göteborg Vattens abonnenter.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Värmeåtervinning på förskolan Rymdattacken 1 : En jämförelse av värmeväxlare

In the spring of 2014 Sweco Systems AB were commissioned to design a ventilation system for a newly built preschool in Linköping. Terms from the client was that it cost efficiency would cope with the energy demands that are placed on the building. The unit chosen was a cross-flow heat exchanger, and this work is to compare it with two other heat exchangers to see if a more energy and cost efficient could have been chosen. The heat exchangers that was chosen for the comparison was a rotating- and a counterflow heat exchanger. Simulations have been made to the different heat exchangers by the manufacturers.

Åtgärdsförslag och känslighetsanalys vid energieffektivisering ur ett fuktsäkert perspektiv : En fallstudie på timmerhuset Sofiedals herrgård

This thesis investigated the possibilities to resume cultivation of an old manor house built of timber and what this would mean from an energy and moisture perspective. The building in this case study is named Sofiedals mansion and was built in 1858 in Valbo 11 kilometers west of Gävle.The structure of the house was documented and used as a starting-point for carrying out calculations focused on energy and moisture aspects. With the help of a number of computer programs and a conducted air tightness test, the buildings energy consumption were calculated and compared with the current building regulations.In addition, the building was analyzed considering energy retrofitting and what it meant for moisture problems. The energy retrofitting consisted of additional insulation, decreasing the buildings permeability through air sealing; window and door replacements. When a building is equipped with natural ventilation it is difficult to know its precise performance and how an energy retrofitting affects it.

En väg till förbättring : Systemanalys ur ett användarperspektiv

In almost every workplace today IT-systems have strong and significant roll in theeveryday work. It is therefore important that the systems have a good functionalityand that they work as an aid for the users. This thesis aims to study the systems atthe company Telge Nät and to analyse them from a usability perspective. By using thisperspective it has been obvious how difficult it is to make improvements on usability,once the system is in place. Even other larger improvements of the systems aredifficult to make at this stage and this is something that the users are aware of.

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Bergkyla och bergvärmeutredning för industrilokalen Rödbergsmyran 5 i Umeå, Västerbotten.

Grubbe Ventilation AB is a sheet metal and ventilation company who provides design, installation, service, and repair of ventilation. The company is expanding their business by building a new facility in Umeå, Västerbotten. The property is designed to be used for both office and industrial work.Grubbe Ventelation AB has not yet decided upon wish system which is to be established to provide the building with heating and cooling. The consulting firm Umeå Projekt Team has therefore been asked to investigate the possibilities to invest in geothermal- heating and cooling.If the investigation of a geothermal heating- and cooling system would provide favorable results it would be a very appropriate alternative that provides energy at low costs and are an environmentally friendly option as the energy comes from stored solar energy in the ground is provided by stored solar energy in the ground.The facility ´s heating and cooling consumptions are calculated in the program BV2 and the result indicate a heating demand of 185 000 kWh per year due to thermal transmittance, transmission losses, heating of warm water and a cooling requirement of 5500 kWh.Three different systems of geothermal heating and cooling were tested in the computer program Energy Earth Design. The results show no difference in the dimensioning of the drill hole if merely heating were to be used or both heating and cooling were to be established.

Värdet av att bygga grönt för kommunala bostadsbolag

AbstractThe real estate sector is today responsible for 40 per cent of the total amount of energy consumption within the members of the EU. All over the world there are collaborations within research and projects to find ways of reducing the amount of energy consumed by the real estate sector. In Sweden, a directive from the European Union has posed demands on authorities as well as on the private sector to reduce the amount of energy consumed by new building constructions. Together with the directive from the EU there are also new requirements and demands from Boverket for the real estate sector.  These requirements mostly concern the energy consumption of kilowatt-hour per square metre and that the consumed energy also should be renewable.  The aim of this study is to explain what kind of value municipalities experience in using certifications and environmental investments for new and existing buildings. Within the chapter theory, essential areas are described such as; environmental certification systems, economical viability, proceeds connected to building green, difficulties with building green, the performance of green buildings when affected by the behaviour of tenants and customer value.  The following chapter describes the methodology with which we have conducted this study.

Nollenergihus i Borlänge : Är det möjligt med biomassa, solenergi och vindkraft?

This report is of technical character and treats how to plan a small building in Borlänge, Sweden.The technical components that have been treated in the report are the construction, foundation,installations and thermic abilities of the house. In addition to planning this house the report alsocontains a part that deepens in net zero energy buildings. The purpose of the report is toinvestigate if the house in Borlänge can be constructed to meet net zero energy buildingdemands.Energy efficient houses such as passive- and net zero energy houses are showing more frequenton the market in Sweden. Ongoing climate changes and growing consciousness about theenvironment in society have contributed to that the environment is a well discussed topic. Toconsume small amounts of energy and at the same time produce local energy is thereforesomething that lies in the future and future houses.

<- Föregående sida 17 Nästa sida ->