Sökresultat:
1963 Uppsatser om Drain water heat recovery - Sida 7 av 131
Kognitiv återhämtning efter generell anestesi
ABSTRACTBackground: After general anesthesia the cognitive ability is temporarily impaired. Cognitive recovery is necessary for the patient to be able to assimilate the information that she / he gets postoperatively. It also increases the patient safety. There are few methods to estimate and assess the patient's cognitive recovery before and after anesthesia. The purpose of this study is to test the usefulness of the instrument PQRS and to assess the patients cognitive recovery after anesthesia.
Sommargården - Hållbara uppvärmningsalternativ för stugbyn Sommargården, Finnhamn
Finnhamn is a group of islands that are located in the middle north part of Stockholm?s archipelagos. On the main island Stora Jolpan there is a camp called Sommargården, which consists of eleven different buildings in various sizes. The assignment given by the Archipelago foundation (Skärgårdsstiftelsen) is to analyze if it?s benefited to replace Sommargårdens current heating system that consists of electricity radiators, with a more energy efficient heating system. This research is done with help of the literature review and a visit to Finnhamn in order to map Sommargården?s current state and its energy usage.
Kartläggning av material flödesflaskhals i ICA butik.
In the spring of 2014 Sweco Systems AB were commissioned to design a ventilation system for a newly built preschool in Linköping. Terms from the client was that it cost efficiency would cope with the energy demands that are placed on the building. The unit chosen was a cross-flow heat exchanger, and this work is to compare it with two other heat exchangers to see if a more energy and cost efficient could have been chosen. The heat exchangers that was chosen for the comparison was a rotating- and a counterflow heat exchanger. Simulations have been made to the different heat exchangers by the manufacturers.
Datormodellering av en värmelagrande betongväggs inverkan på det termiska klimatet i ett växthus
This report describes the building of a computer model that makes it possible to simulate the thermal climate in a greenhouse. The computer model is built on the physical theory of heat exchange that occur in a greenhouse, such as radiation and convective heat exchange. The model also includes the heat storage that is active in a greenhouse.The computer model is used to simulate the thermal climate in a greenhouse under three periods, winter, spring and summer. It also investigates which effect a concrete wall has on the thermal climate in a greenhouse. The purpose of putting a concrete wall in the greenhouse model is to investigate the possibility to store heat during the day and then use this heat when the temperature drops during the night.The result from the simulations shows that a concrete wall levels the big difference in temperature that normally occurs under a day in a greenhouse.
Värmepumpars inverkan på elkvaliten
Modern technology and fast development of heat pumps, the hunt for savings in energy consumption and the strive for environmentally friendly energy sources, convenience, and financial profit, have made heat pumps a reasonable alternative for the heating of houses.When the heat pump starts it will consume a considerable amount of current, which may result in a short-lived voltage-drop if the power grid is weak compared to the start-up current.The company Fortum Distribution which owns and administrates electrical network is interested in an investigation that deals with heat pumps affect on the quality of electricity.The purpose of this investigation is to study fast electrical fluctuations (flicker) as a result of start-up currents for single as well as multiple heat pumps on the same electrical station and from this evaluate whether there will be any problems installing heat pumps..
Personalens bedömning av tillämpningen av ett återhämtningsperspektiv inom vården
AbstractThe purpose was to investigate whether a recovery perspective, viewed from a psychosocial approach is applied in municipal / private and county related care and rehabilitation. A recovery perspective means that the attending staff ensures that the clients are viewed as holistic individuals, where all aspects of life are considered to ensure adequate care and rehabilitation. A questionnaire was answered by staff in psychiatry, social psychiatry and addiction treatment from different areas of the municipal / private and county related sector.The results show no difference in application of a recovery perspective between these two types of organizations. However, there is a slight tendency (non-significant) to lower-rated general individual competencies for municipal / private. There is also a strong tendency (non-significant) to a general difference between the aspects of the implemented recovery perspective, where the tendency is that the respondents as a whole estimate that the organization to a greater degree creates good conditions for a recovery perspective compared to the degree they are actually working on that basis.
Do not hope for the best, plan for the worst! : En studie kring Service Recovery vid två svenska företag samt en introduktion av en ny modell inom Service Recovery
Denna uppsats kretsar kring två företags återhämtningsarbete vid uppkomsten av respektive skandal. Vidare skapas en djupare förståelse för teorin Service Recovery's betydelse och användning i praktiken. De två fallen där skandaler inträffat är grundade dels i ICA:s köttfärsskandal och dels i IKEA:s fjäderplockningsskandal. Uppsatsen har en deduktiv ansats vilket innebär att uppsatsen utgår från befintliga teorier som sedan testas med det insamlade empiriska materialet. Den teoretiska referensramen innefattar främst Grönroos teorier kring Service Recovery och kompletteras med teorier så som Service Recovery Paradox, kundförväntningar, sociala medier och immateriell påverkan.Uppsatsens forskningsfrågor besvaras främst med hjälp av en fallstudie med två företagsanalyser samt med en enkätundersökning. Studien är av både kvalitativ och kvantitativ karaktär där kvalitativ data samlats in via en e-mail intervju med Ylva Magnusson vid IKEA, och kvantitativt via en enkätundersökning.Uppsatsen har resulterat i kännedom om hur de två företagen arbetat med att återfå kundförtroende.
Energimässig jämföelse med investeringskalkyl av två förskolor
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Optimerande av gasanläggning - genom värmeåtervinning och förlustreducering. Gässlösa Reningsverk
The municipality, of Gatukontoret in Local government of Borås has in the long run, a required need to look after the current heating devices (the gas production plant) in sewage treatment plant, called Gässlösa. The practical work of the examination is about, trying to find a better way to take care of the current heat recovery. That may be one way or another, rather easy to implement in the existent construction.Through the work to increase the efficiency of the gas engine, implement of some external cooling system by heating exchange device. That gives an opportunity to heat (primary) the digester, (but even all internal public areas) with its own superfluous heating.The report shows that if the management group may invest 422 704 crown to implement a heat exchanging device, it gives more space to reduce the need to buy expensive external energy. Gatukontoret´s pay off time, for buying machines, is 20 years, with reservation to calculate with 4 percent internal interest, leads to the yearly mount of 31103 crowns.If Gässlösa increases the gas engine time in (effective) duty approximately (correspondingly) 48 hours a month the entire investment will generate a profit in January in year seven after the implementations.
Värmestyrning I Handske
This rapport is result of a project. The purpose of which was to design a circuit that is used in a heat glove. The heat glove is the technical aid which provides heat inside a glove.It is specially suited for old people who have problems with cold hands because of decreased blood circulation.There already was an old circuit in the glove that gives a constant current which develops heat from battery to glove through a circuit. The temperature is between 32 and 34 degrees.The problem with the existing circuit was to regulate the temperature. There is only on/off switch and there is no way to adjust desirable value of the temperature.In order to solve the problem the old circuit was investigated.
Framtidens Hus
The company Sol & Energiteknik wanted to examine the possibility to make a standardhouse totally energy independent. Based upon this I have, during the spring of 2007,examined the possibilities available at the market today through litterature studies, contactwith several companies and reading reports at the internet.The first thing to examine has been to determine the energy consumption for a standardhouse, and find out if there are better technologies to be used for energy conservation.My conclusion in this matter is that there are possibilities today for building a house moreenergy efficient.When I had reached the point at which my design for the house was decided, I also hadto choose the different products to use to produce energy as well as to store that energy.To produce heat and electricity to the house I decided to use a wind turbine and a solarwater heater.The most difficult part of designing a house that is energy independent is that theproduced energy must be stored somehow. Storing the heat is relatively easy beacuse theheat can be stored in a large water tank. The electricity is a bigger problem beacuse itmust be stored in batteries, which today are too expensive to be used in a standard house.In the future producing and storing hydrogen might be used to produce electricity, buttoday that technology is both expensive and not tested enough.My final conclusion is that a standard house can not be built to be totally energyindependent today, unless it is very expensive to connect the house to the electricitynetwork. As an alternative solution I came up with a proposal for a house which isconnected to the electricity network and have some amount of own produced energy.This house prooved to be a good investment if you choose to build it today, and it couldbe a very good investment in the long run beacuse energy prices increase every year..
Low Temperature Waste Heat Solutions : with proposals for energy technological actions based on Scania?s building 64
The report comprises two separate parts:part 1: Temperature needs for district heating in the paint shop for axles in building 210part 2: Energy and low temperature waste heat solutions in heating and cooling systems for building 64 with surroundingsThe paint shop for axles in part 1 has air quality requirements in places for coating of axles. Toachieve desired air properties there are different process ventilation systems, which consist ofventilation coils for heating and cooling, plus air humidifier. The ventilations coils for heating usedistrict heating. Today the ventilation coils use water of 100°C to achieve necessary air demands inthe coating boxes. This part of the report investigates whether the existing system would achievethe air requirements with a water temperature of 75°C instead of 100°C in the ventilation coilsduring the coldest parts of the year.
Robot-Assisterad Gradningscell med Force Control
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Förbättrad tillgång till referensmaterial vid röntgentolkning
This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.
Renovering av flerfamiljsbostäder inom miljonprogrammet ur ett energi- och lönsamhetsperspektiv
Miljonprogram is a Swedish building program from 1964 to 1975. During that time about a million homes were constructed. Now, almost 50 years later, they are in desperate need of renovation. In order to fulfil the Swedish environmental objective to decrease energy consumption 50 per cent until 2050, considerable housing stock built under the Miljonprogram has to be renovated.Focus in this thesis is on the building services and theirs profitability that can decrease energy consumption in households build during the Miljonprogram. Building construction is not considered in this report.