Sök:

Sökresultat:

18 Uppsatser om Downtime - Sida 1 av 2

Skapa ett equalized underhålls/planeringsprogram samt minimera driftstopp

This report is a thesis on requests from Sandvik Mining and Construction (SMC) in autumn of 2012. The goal of this work was to study the feasibility of creating and implementing an Equalized preventive maintenance program in SMC maintenance operations and reduce Downtime for preventive maintenance (PM). To investigate whether this was possible, the authors studied the current procedures for the PM. The authors have collected and analyzed all relevant information within the maintenance department reporting system as well as through interviews determined whether it is practical to introduce a Equalized PM programs. The authors had also studied the possibilities to entrust part of the maintenance work to the operators of the machine cells.

Stopptids- och avvikelseuppfo?ljning vid la?nga takttider : Fra?n avvikelse till info?rd fo?rba?ttring

High quality within a Lean production system begins with standardised work, which creates stable processes able to generate predictable output. If nonconformity from the standard procedures occurs, routines are needed to analyse, correct and prevent the nonconformity from occurring again. In that way, the nonconformity can be a trigger for continuous improvements toward more stable processes. In takted production lines, where the operator follows a standard sequence with tasks set to be completed within the takt time, a nonconformity leads to Downtime in the operator?s sequence, and no value is added.

Undersökning av fosfatsbegränsningseffekter på Escherichia coli AF1000 för bättre förståelse av 3-hydroxybutyratproduktion

High quality within a Lean production system begins with standardised work, which creates stable processes able to generate predictable output. If nonconformity from the standard procedures occurs, routines are needed to analyse, correct and prevent the nonconformity from occurring again. In that way, the nonconformity can be a trigger for continuous improvements toward more stable processes. In takted production lines, where the operator follows a standard sequence with tasks set to be completed within the takt time, a nonconformity leads to Downtime in the operator?s sequence, and no value is added.

Marknadsundersökning av grisplättlysat för att ersätta serum i cellodling

High quality within a Lean production system begins with standardised work, which creates stable processes able to generate predictable output. If nonconformity from the standard procedures occurs, routines are needed to analyse, correct and prevent the nonconformity from occurring again. In that way, the nonconformity can be a trigger for continuous improvements toward more stable processes. In takted production lines, where the operator follows a standard sequence with tasks set to be completed within the takt time, a nonconformity leads to Downtime in the operator?s sequence, and no value is added.

Anpassning och optimering av checkprogram för AW139

Presently Sjöfartsverket do their maintenance according to a standard program, which means that every maintenance task will be done when the task limit occurs. This leads to a very long Downtime for the aircraft in some occasions and very short Downtime in others. The goal with this work is to reach a higher regularity of the aircraft operation. To reach a higher regularity for the operational needs, this work will present a hypothetic better maintenance concept for Swedish Maritime Administration. The concept is based on equalized maintenance structure, which means that every maintenance occasions are meant to take the same time to perform.

Besparingsmodell för produktivitetshöjande arbete inom skärande bearbetningsteknik

The market is developing and a growing competition increases pressure on companies to maintain their competitive advantage. Working with cost savings is a way to enhance earnings in a short term but also in a longer perspective. Volvo Powertrain Production Köping has an overall goal; to reduce costs by nine percentages in three years. To achieve the goal, Volvo Powertrain Production Köping works with World Class Manufacturing where the Department of Processing Technology constitutes an important part.Volvo Powertrain Production Köping lacks a standard for how savings within the metal cutting tool area are to be calculated. This makes it difficult to control and monitor their business outcome but it also causes difficulties in controlling the tool suppliers? outcome.

Maskinskydd på rullriktverk

ESAB is a world leader in production of welding consumables and equipment. The company manufactures, among other things, welding electrodes. A roller straightening unit is used in the cutting process to straighten the wire, which the welding electrode consists of, by adjusting some of the rollers during operation. According to ESAB?s standard and the European machinery directives, moving parts of machinery, such as rollers of the roller straightening unit, must be out of the operator?s reach.

Maskinskydd på rullriktverk

ESAB is a world leader in production of welding consumables and equipment. The company manufactures, among other things, welding electrodes. A roller straightening unit is used in the cutting process to straighten the wire, which the welding electrode consists of, by adjusting some of the rollers during operation. According to ESAB?s standard and the European machinery directives, moving parts of machinery, such as rollers of the roller straightening unit, must be out of the operator?s reach.

Håller vindkraften vad den lovar?

The purpose of this study is to investigate how much of the estimated annual electric energy production from Swedish wind power that actually was produced, as well as the history of this agreement over time. The aim is to also examine if there are properties that have caused some group of wind power plants to produce more or less, compared to their estimated production. Operational data on wind turbines collected by the Swedish Energy Agency was analyzed. A survey was made among owners of wind power plants with a nominal power of at least 2 MW. Two different methods for normal year correction of production data were used and compared.

Incidenthantering i molnmiljö

Incident response plans are faced with new challenges as organisations expands to the cloud, this thesis aims to highlight these challenges and their potential solutions. Our work has focused on managing the incident response in contrast to earlier work that has been focusing on preventing them.As with any development, security is seldom prioritized. Instead the focus are often aimed towards usability and functionality, which means incident response plans are written, implemented, forgotten and finally becomes obsolete. This could result in an organization losing their ability to produce acceptable forensic images, avoid severe Downtime, or prevent similar incidents in the future, which are all important parts of incident response.Traditional incident response plans does not address incidents in the cloud. Thus, an absence of guidelines for managing incidents in the cloud becomes apparent.

Ökat flöde genom timmersorteringen vid Ala sågverk

Ala sawmill in Ljusne, Hälsingland, has increased its flow through the sawing plant during the last couple of years. The problem now is the sorting plant, as this part of the mill is now slower than the rest. A close analysis of the sorting plant was therefore necessary to be able to increase the flow through. The aim of the project was to find solutions that can lessen Downtime and increase flow. The goal was to increase the flow from 650 to 925 logs through the sorting plant per hour.

Att uppnå varumärkesframgång genom dagens designtrender

The purpose of this thesis is to examine how investments are justified in the Swedish data center industry, with a focus on cooling equipment. This is achieved through semi-structured interviews with 20 different interviewees. These interviewees represent different facets of the industry and facilitate an understanding of which factors, such as: investment costs, operating costs, reliability, environmental impact and the influence of external and internal actors, come into play and to which degree they impact the investment decision-making process. The results show that primarily low operating cost in the form of low energy consumption is the driving factor when it comes to the procurement of new equipment. A lower environmental impact is a positive side-effect of lower energy consumption.

Energismart modulhus med takintegrerade solceller

The purpose of this thesis is to examine how investments are justified in the Swedish data center industry, with a focus on cooling equipment. This is achieved through semi-structured interviews with 20 different interviewees. These interviewees represent different facets of the industry and facilitate an understanding of which factors, such as: investment costs, operating costs, reliability, environmental impact and the influence of external and internal actors, come into play and to which degree they impact the investment decision-making process. The results show that primarily low operating cost in the form of low energy consumption is the driving factor when it comes to the procurement of new equipment. A lower environmental impact is a positive side-effect of lower energy consumption.

Analys av revisionsarbetet på Forsmarks kärnkraftverk

This thesis is the final part of bachelors program of Nuclear Engineering at UppsalaUniversity (program code KKI1). The work has been carried out in cooperation withForsmark Kraftgrupp AB. The topic studied deals with possible improvements ofefficiency at the planning department at block 2 in Forsmark i.e. FMP2.FMP2 plans and coordinates over 3,000 operations which is carried out during theannual overhaul of block 2 in Forsmark. Inspections, fuel replacement and repairs areincluded in the annual overhaul.

Marknadsundersökning inom datacenterbranschen : Undersökning av tekniska inköp, med fokuspå kyllösningar

The purpose of this thesis is to examine how investments are justified in the Swedish data center industry, with a focus on cooling equipment. This is achieved through semi-structured interviews with 20 different interviewees. These interviewees represent different facets of the industry and facilitate an understanding of which factors, such as: investment costs, operating costs, reliability, environmental impact and the influence of external and internal actors, come into play and to which degree they impact the investment decision-making process. The results show that primarily low operating cost in the form of low energy consumption is the driving factor when it comes to the procurement of new equipment. A lower environmental impact is a positive side-effect of lower energy consumption.

1 Nästa sida ->