The Swedish building and property management sector are responsible for about 30 % of the total energy use. In order to take environmental consideration, different environmental assessment tools and standards are used. Miljo?byggnad, Svanen, FEBY12 and PHI are some of these. There has been increased interest to certify buildings and therefore it is of interest to evaluate the assessment of the energy field to see if relevant energy aspects are assessed.

Rätt gåva för rätt tillfälle

This master thesis is a study of the Swedish hydropower capacity to balance wind power. The Swedish government has decided that it should be possible to produce 30 TWh from wind power in the year 2020. The Swedish municipalities have to have plans for wind power plants with total yearly generation of 30 TWh. Wind power is an variable energy source that needs to be balanced by other energy sources. In Sweden the Swedish hydropower can be used for balancing a large scale introduction of wind power.

Markering och risning av basvägar inom slutavverkningstrakter : en intervjustudie hos maskinförare och planerare

In an attempt to prevent ground damage and to reduce harvesting costs, StoraEnso's districts Värmbodal and Fryken, selected a number of final felling areas where the base roads have been marked by planners in the districts. The parties involved in the experiment are mainly planners, harvester operators and forwarder operators. The purpose of this paper is to determine the findings of this trial and to find cost savings or lost revenue. This has been done with a sample of interviews from the involved parties who logged the chosen felling areas. Literature about the interview process has been used to facilitate data collection, interpretation and analysis of the material. If we look at profitability based on assumed income and expenditure, revenue per MWh would be 63 SEK.

Balansering av en storskalig vindkraftsutbyggnad i Sverige med hjälp av den svenska vattenkraften

This master thesis is a study of the Swedish hydropower capacity to balance wind power. The Swedish government has decided that it should be possible to produce 30 TWh from wind power in the year 2020. The Swedish municipalities have to have plans for wind power plants with total yearly generation of 30 TWh. Wind power is an variable energy source that needs to be balanced by other energy sources. In Sweden the Swedish hydropower can be used for balancing a large scale introduction of wind power.

Verifiering av beräknad energiprestanda för flerbostadshus byggda år 2007-2009

The building industry consumes approximately 40 % of the total energy consumption in Sweden, where the using stage is dominating with 80 %. There is a lot of work in progress to reduce energy use in the building industry, and the demands from authorities regarding energy use increases. As a part of this work Building and planning department of Sweden has established a requirement that has been applied since 2006, and restricts a maximum energy use for buildings.The requirement includes that an energy simulation must be done in advance to demonstrate that it is possible to meet the demands.Reality is however more complex than an energy simulation program, that frequently underestimates the energy use of buildings. The purpose of this thesisis to study and analyse deviations between estimated and actual energy use in modern apartment buildings. The study includes four apartment buildings in Stockholm, Gothenburg and Jönköping that were built in 2007-2009.

Det tvetydiga beslutsfattandet i styrelsearbete. : En problematiserande studie i beslut rörande energiförluster i värmenät

Syfte: Bakgrunden till detta arbete är att samfälligheten Långbacka där en av författarna bor har haft betydliga problem med värmeförluster. Vår uppsats bygger på att hjälpa styrelsen att lösa denna problematik. Till denna praktiska frågeställning har vi lagt en vetenskapsteoretisk aspekt genom att problematisera beslutsfattande i styrelsearbete.I denna uppsats har vi haft som syfte att ikläda oss styrelsens roll och genom att själva vara en del i processen få känna på den komplexitet som uppstår kring beslut.Metod: Vår teori är insamlad utifrån tre olika synvinklar. Dessa är rationell, icke rationell och en ekonomisk beräkningsmodell. Till dessa teorier har vi empiriskt samlat in information dels genom strukturerade intervjuer men även öppna samtal.

Möjliga alternativ för att ersätta direktverkande el i flerbostadshus

I have in my thesis, examined the possibilities in terms of energy for a condominium association.To have an effective and good energy is becoming increasingly important with today's rising electric and oil prices. In my thesis I have used the condominium association Kärralyckan, which is situated in Falkenberg. The buildings at Kärralyckan are built in the mid-1970s, and are heated by electric radiators. The tap water is heated by an electric boiler.Based on that calculation I can show the various energyststem. The different solutions have been developed by contact manufacturers and installers through phone calls and e-mail.According to the results shows that geothermal heating has been a great solution for Kärralyckan.

Föryngringsresultat och beräknad virkesproduktion i naturligt föryngrade tallbestånd i Västerbotten under mitten av 1990-talet :

According to the Board of Forestry, in Västerbotten, many natural regenerations of Scots pine (Pinus sylvestris) carried out on privately owned forest in the middle of 1990 in Västerbotten have rendered a bad regeneration outcome and will provide a low future forest production. The Board of Forestry believes that the negative result can be explained by the fact that the regeneration has been carried out in wrong locations and that scarification failed to work as planned. In order for an accepted rate of regeneration the guidelines of the Forrest Act require, not less than 10 years after final cutting at natural regeneration, that there should be at least 1300 (site indices 16 m) - 1700 (site indices 20 m) main crop stems per hectare. Main crop stems are defined as stems according to the place of growth and appropriate tree type, in addition with regard to quality, stage of development and damage risk have a prospect of succeeding. In addition main crop stems should be separated by surface so that the proportion sample plots with 3 meters radius, and lack main crop stems, are not more than 10 % of site indices 14 meters or higher.

Älmhults köping 1901 - 1970 : Från räls till IKEA

In the beginning of the 1860s, an important railway was built between Malmö and Stockholm. The railway became one of the most important projects that would influence the entire southern Sweden. The railway line was located to areas outside the ordinary routes and a number of communities were built up along its way.Älmhult was one of the communities that was built up due to the railway. In the beginning there were only a few farms and a station, but a community developed and the village grew. In 1901 the village became a small market town, which was an important event.

ENERGIEFFEKTIVISERING? Av lamellhus byggt på sextiotalet

TitleEnergy-efficiency ? of slab blocks built in the sixtiesAuthorsRichard Sandahl and Kim SöderbergEducationHalmstad University, Section for economy and technique Construction Engineering 180 ECTSSupervisorMargaretha Borgström, Universitylector construction physics, Halmstad UniversityContact person at HFABUlf Johansson Heating, sanitation and energy co-ordinatorReportExamination paper at the construction engineering program is performed in cooperation with HFAB (Halmstad real estate concern Inc.)AimThis examinations work is done in cooperation with HFAB and there project on the block around the street Maratonvägen. HFAB:s dwelling stock on this area are going through a bigger renovation and in relation to this they are looking on the possibilities to make this building more energy efficient. That is why this examination paper has as purpose to answer the question if it is possible to make slab blocks built in the sixties more energy efficient. This is done by calculate energy efficient measures on a chosen apartment block at Maratonvägen in Halmstad, in an energy and expense perspective.MethodThe examination paper is based on different methods, mainly calculation but also qualitative conversation studies, economic calculations and literature studies.

Energi- och kostnadseffektiva klimatskal : För lager-, industri- och kontorsbyggnader

A study to optimize insulation thickness for stock-, industrial- and office-buildings for external walls and roof in an economical perspective has been conducted on behalf of DynaMate. DynaMate?s role is to maintain all Scania?s buildings. Analysis has also included other parts of the building envelope, such as windows, exterior doors and industrial doors. In this thesis, three different types of exterior wall constructions has been investigated, these are a sandwich design consisting of sheet metal and a another one consisting of concrete, as well as a wall of concrete with a coating of plasters.

Implementering av Patientsimulator för Anestesimaskiner

In order to facilitate testing of anesthesia machines a patient simulator has been required by Maquet Critical Care AB. A patient simulator has been developed to reduce expensive and time consuming animal experiments and temporary lab arrangements. The patient simulator has been developed and designed to simulate human lungs with regards to anesthetic uptake, production of carbon dioxide and heating and moisturizing exhaled air.The system comprises a container and a test lung to simulate the volume and the dynamic of the human lung. The simulation of uptake of anesthetics has been implemented by pumping a fraction of the gas from the container through a bypass circuit with an active charcoal filter that adsorbs volatile anesthetics. The flow through the bypass circuit is generated by a pump and is controlled by a linear valve.The resulting performance of the patient simulator has fulfilled the requirements.

Vattnets väg genom ett romerskt bad. - tekniken bakom marmorn.

This essay focuses on the technical systems and functions behind how a Roman bath operated. I will present a general view by going through each part of the waters path through the bath one by one. Since there is no such thing as a standardised Roman bath I will, under each headline, present the sub subject with a presentation of the workings and then exemplifying through archaeological findings and ancient literary sources.This essay is therefore meant to present a thorough and clear presentation of the technical aspects of a roman bath. The aim is to give the reader an understanding of how a bathhouse worked in general and why. To this I want to present problems that the Romans were faced with and how they solved them..

Brytpunkten mellan två platser : gemenskap, miljö och identitet från S:a Maria sjukhus till Maria Park

The result of a short field work done in Maria Park, a place situated in the north of Helsingborg city. A comparative work, using the old S:a Maria and Maria Park. The same place, once a mental hospital, and now, at the time of the paper being written, it's a richer residential district. Is there anything left of the old mental hospital in the new community and the residents identities?.

Värmeåtervinning ur spillvatten i befintliga flerbostadshus

Drain water heat recovery is an uncommon measure in multi-unit residential buildings. There istechnology available for the purpose but the knowing and experience of the heat recovery systems islittle. The purpose of this thesis is to evaluate the future potential of drain water heat recovery inmulti-unit residential buildings.A major part of the multi-unit residential buildings in Sweden were built during modernismen andrekordåren (1940?1975). Many of the buildings have worn out drain and water supply systems andmany are in need of a general refurbishment.