Sökresultat:
7184 Uppsatser om Design sewage flow - Sida 5 av 479
Miljösystemanalys av VA-system i omvandlingsområden : fallstudie i Värmdö kommun
Wastewater handling of private sewage systems has become an all increasing matter. In Stockholm region the 90 000 private sewage systems contribute with larger phosphorus flows to the Baltic Sea than the two biggest sewage plants in the area, Henriksdal and Käppala, contribute together, even though these two plants purify wastewater from more than one million inhabitants.
When summer house areas turn into areas for permanent living ? transition areas ? the load on the existing systems increases, systems that already often are unsatisfying. In those areas it is not clear what the best system choice is; On-site systems for single households; Local collective systems or Connection to central systems.
Development of Liquid Cooling for PCs
In recent years, existing solutions for cooling personal computer CPUs have been supplemented by a new product category, factory sealed water cooling loops. These systems, consisting of a water block with an integrated pump, a fan and a radiator, perform well compared to the air cooling solutions but are less effective than larger, custom-built water cooling systems.This project aims to explore the most important aspects of a factory sealed system and to identify possible cost-effective enhancements of the performance.The most significant differences between the different groups of water cooling loops are the block design and the pumping power. The performance of both categories is also largely dependent on the fan power, but increasing fan power has a large negative impact on the noise level.Both radiator size and fan model choice appear, in tests, to be relatively unimportant, presuming that the noise level is kept constant. The position and direction of the fan, however, has significant impact on both the temperature and the sound level.Water blocks can be designed in several different ways, both regarding the heatsink design and the flow direction. In simulation, flow with the inlet centered above the heatsink result in considerably lower pressure drop and slightly higher temperatures than flow through the block, for heatsinks with fin arrays.Creating a competitive product in this product segment certainly seems possible, as there are performance-increasing changes to be made that seemingly has little impact on the production cost.
En rörig historia : en fallstudie över Secorocs processflöde av DTH-rör
Abstract Title: A messy story ? a case study of Secorocs process flow of DTH-pipes Presentation date: 2010-06-02 Course: Bachelor thesis in businessAuthor: Kristoffer ForsmanAdvisor: Kjell GustafssonKeywords: Management control, process control, lean production, process flow analysisPurpose: The purpose of this bachelor thesis is to develop an overview of the process flow for a specific product, and with the help of this mapping based on a lean production philosophy show possible improvement proposals and how these can lead to a more efficient process flow.Methodology: I have used a case study of Secorocs DTH-pipes and my primary data are gathered through interviews and observations. I have used theoretical framework to establish a process flow analysis. This is to obtain data on process activities and whether they are creating value or not. This leads to a current mapping of the situation in Secoroc on DTH-pipes and then analyzed and suggestions for improvement are developed.Conclusions: That by using the above mentioned mapping of process flow of DTH-pipes, problem areas could be illustrated.
Ökat flöde genom timmersorteringen vid Ala sågverk
Ala sawmill in Ljusne, Hälsingland, has increased its flow through the sawing plant during the last couple of years. The problem now is the sorting plant, as this part of the mill is now slower than the rest. A close analysis of the sorting plant was therefore necessary to be able to increase the flow through. The aim of the project was to find solutions that can lessen downtime and increase flow. The goal was to increase the flow from 650 to 925 logs through the sorting plant per hour.
Sammanställning och utvärdering av små avloppsanläggningar utifrån tillförlitligheten hos angivna reningsgrader
The private sewage systems in Sweden releases around 600 tons of phosphorus per year, compared to about 350 tons from municipal sewage treatment plants, and they account for approximately 21% of the total anthropogenic discharge of phosphorus into Swedish waters. About 40% of Sweden's nearly 1 million private sewage systems are inferior with respect to emissions to surface and groundwater. The technology of small sewage plants is under development and knowledge of treatment effects for different solutions is poorly consolidated. Municipal authorities lack resources to keep up with the technologic development and assess the reliability of the treatment performances that suppliers report for their products. The thesis aims to conduct a market review and evaluation of wholly or partially prefabricated small sewage plants, to make it easier for municipalities and property owners to assess different technical solutions. The goal is a compilation of the products on the market, evaluated on the basis of the reliability of specified degrees of reduction.Information on sampling procedures and test results were collected through a questionnaire to all active suppliers and the responses were then used to classify the products.
Arbetsglädje : En kvalitativ intervjustudie om hur fem lärare i grundskolans tidigare år beskriver arbetsglädjens betydelse och påverkan
The goal of this study is to examine what five teacher?s impression of the teacher?s role is in their previous years. How important the ?joy at work? is in relation with the educational progress? And what aspects that contributes to the? joy at work? and what obstacles that stops them. The essay will also go through the concepts of a teacher role, with connection to the theoretical perspectives of Csikszentmihalyi?s Flow and Antonovsky?s Salutogenesis (KASAM).The method I used was interviewing five teachers and I used Larsen?s chapter of ?content analysis? as a basis, I also used Flow and KASAM as theoretical references in my analysis.
Skadliga nollflödespunkter i Fortum Värmes fjärrvärmenät i Stockholm : En analys av dess förekomst och effekter
When several production units provide a district heating network, water is pumped from different directions. When the flows from the plants finally meet in the network, the water can be completely still. These places are called zero flow zones. In district heating networks with several plants, which also have different supply temperatures, large and frequent temperature fluctuations can occur when the zero flow zones move. This may cause wear on the pipes, a phenomenon called low cycle fatigue.For this reason it is important to examine where and when zero flow zones that cause temperature changes occur.
Testing and optimization of Unicorn Fluid-Structure Interaction solver for simulating an industrial problem
In industry applications, such as power supply plants, the issue of interaction between fluid and structure is always presented. More precisely, the fluid flow affects the structure by applying force(s) on it and vice versa. As a result, the structure can move (vibrate) or deform. A good understanding of this problem can help to design the system in term of safety, stability and efficiency.This project aims to optimize and test the Unicorn FSI solver from the FEniCS project [1] to simulate the interaction of fluid and structure in an experiment, which was carried out at Vattenfall Research and Development. The target is to improve the Unicorn FSI solver to cope with a real industrial problem.
Simulering av ett värmesystem i COMSOL Multiphysics : Pipe Flow Module
Syftet med detta arbete är att simulera ett värmesystem i COMSOL Multiphysics, Pipe Flow Module, Non-Isothermal Pipe Flow som innehåller ekvationer och randvillkor för att modellera inkompressibel strömning och värmeöverföring i rör.Data om processen och dess komponenter har samlats in från industrin där arbetet är utfört och i vissa fall modifierats för att bättre beskrivas i programmet.Utifrån insamlad data har en modell byggts upp och två simuleringar har gjorts. En stationär för starten av systemet, den har sedan legat till grund för en dynamisk som simulerar förloppet från start till normaldrift.Tiden det tar för det aktuella fallet att nå drifttemperatur är 16 timmar. En felströmning upptäcktes samt att en av pumparna inte kommer att klara en start från 20 °C..
Leanorienterad flödesutveckling : av kärntillverkningen på Affärsenhet Cylinder ASSA AB
Business unit Cylinder at ASSA AB in Eskilstuna are having problem with frictions in their production process. Changes are occurring and older products along with machineries are phased out and transferred to low-cost countries. This opens up possibilities to at a larger extend customize physical flows after production flows. The authors where given the task to analyze the production and find problem areas to improve and to give suggestion on how Business unit Cylinder can work to optimize their production flow.The aim of the thesis work is to come up with suggestions on how to reduce the lead time in production and how the tied up capital can be reduced. In more detail the task included to find problem areas that are counteracting an effective flow, give solutions on new flows for the production of the cylinder core, give suggestions for new stock points for the production and how the production shall be managed and controlled.During the last twelve months ASSA AB has sold over 700 different types of cylinder cores, and the product range is very wide.
Utvärdering av olika sätt att hantera avloppsslam i Värmdö
Important issues for the local authorities are what to do with the sludge produced insewagetreatment plants. The tax for landfill leads to higher costs with 250 SEK/ton. On the 31December 2004 it will be forbidden to landfill sludge.In Sweden the yearly production of sludge is 240 000 tons, counted as DS. The phosphorouscontent is 3 % in sludge. The total yearly production of sludge gives 6000 tons of phosphorous.
Kassaflöde och Kapitalbindning. En studie av vilka åtgärder och faktorer som vägs in i beslutssituationer i bygg- och anläggningsbranschen.
Background: Today there are high claims on organizations to show a positive economic view. To satisfy the demands and expectations from interested parties it is very important to carefully plan the companies tied up capital and cash flows. Purpose: The purpose with the thesis is to describe what actions organizations take to resolve the conflict between showing a positive cash flow and the need to tie up capital.The purpose is also to explain the different factors that must be considered when making decisions regarding cash flow and capital tied up. Method: A qualitative study of the actions and factors wich must be considered when decisions in swedish construction companies are made regarding cash flow and capital tied up. Results: A model of the factors and actions that affect cash flow and capital tied up in projects.
Kvalitetssäkring av hushållsnära avloppsfraktioner : vad kräver livsmedelsbranschen?
On-site sewage systems are common on the countryside of Sweden with approximately one million on-site systems installed. Due to insufficient function, these contribute significantly to the total discharge of phosphorus to rivers and lakes, causing eutrophication.
In order to reduce eutrophication and to fulfil one of the environmental quality objectives, the decision was taken by the Swedish Government in 2005 that 60 % of phosphorous in sewage sludge is to be recycled to arable land before 2015. To make recycling a reality, new solutions have to be found. Federation of Swedish Farmers (LRF) takes an active interest in this issue and has initiated this study.
One problem is that the food industry is sceptical towards recirculation due to the risks that products from sewage systems may contain pathogens, heavy metals and unwanted chemical compounds, e.g.
Bättre enskilda avlopp i Sigtuna kommun : möjligheter för bebyggelse i Odensala socken
There are around 855 000 on-site sewage systems in Sweden and some 1 800 of these are located in the municipality of Sigtuna. The Sigtuna local authority has set the goal that all sewage systems with insufficient function should be improved before the end of year 2010.
A malfunctioning on-site sewage system may cause three main problems: spreading of diseases, discharge of eutrophicating compounds and wastage of resources. The municipality strives to reduce these problems already at the stage of granting permits for installation of on site sanitation systems. The municipality has recently adopted new guidelines, which demands certain minimum reductions for different compounds. The guidelines also state that it is preferred that neighboring house-owners cooperate in jointly built and operated sewage systems and that the system should be able to recycle plant nutrients.
Flödesanalys av plåtsammansättning : Strävan mot Just-In-Time och minskat slöseri
The Volvo Trucks plant in Umeå is a highy complex manufacturing facility where the same production line handles a variety of different models. This require flexible and agile processes with high quality standards. This thesis studies the flow of material through a production line and how Volvo can use their existing manufacturing monitoring system to optimize the flow of materials.The goal with the thesis is to identify eventual problems with the flow of materials and to deliver a few proposals on how the production line can improve its productivity. The theory of LEAN, Just-In-Time and Supply Chain Management serves as the scientific reference to this project. By analyzing the flow of material, performing interviews and observing the processes a few problems are identified.