Solceller som energikälla och solskydd för tält

This degree project is an investigation of solar cells and their ability to deliver electric power as well as reducing the need for cooling. The main object of interest is a BASE-X shelter. The shelter is purchased by the Swedish Defence Materiel Administration, FMV to be used for command and camp in the new force called Nordic Battlegroup, NBG. The demand on the equipment is firstly that it should have a small weight to be easy to transport and handle and secondly to be easy to bring up fast. Therefore the choice of solar cell technology fell on thin film cells.

Anslutning av givare och ett dSPACE-system till en hydraulisk kran

Det här rapporten är en del av mitt examensarbete för högskoleingenjörsexamen i elektroteknik vid Växjö Universitet, MSI. Arbetet är en del av ett större projekt kallat Kranstyrningsprojektet som bedrivs av Växjö Universitet, Rottne Industri med flera, vars syfte är att underlätta för förare att kontrollera den kran som finns på Rottnes skotare. För projektet har det använts en laborationskran och nu har önskemålet varit att det till kranen ska installeras ett nytt styrsystem från dSPACE. Dessutom vill man att nya givare ska sättas på kranen och kopplas till dSPACE. Man vill även ha en manual för att nya studenter ska kunna använda systemet.

Design av en ejektorspädare samt ett system för partikelmassmätning av dieselavgaser

This master thesis was a subtask of a project called EMIR-1. The goal with the thesis was tobuild a system for particulate mass measurements in one of the engine test cells at KTH. Theparticulate mass measurements are planned to be measured with a TEOM.The exhaust gases must first be diluted with air before the sample is sent to the TEOM.Therefore an ejector diluter for this matter also was designed and evaluated in the thesis.Emissions measurements have been done both with and without dilution to determine thedilution ratio. Tests have been done for different speeds and loads.Problems with stability of the dilution ratio have been an issue throughout the process andpressure pulsations in the exhaust pipe are believed to be the cause. More tests have to be done tomake sure that this is the problem.One idea is to make the inner diameter of the diluter nozzle smaller and see if it changes thedilution ratio stability.

Hjälpkraftsystem med två lågspänningsnivåer

Because of increasing demand of power on Malmbanan the capacity of the existing wires which supply the trains must be increased. This increases the stress on the existing poles and for this reason the system for supplying the loads along the railway is to be removed from the poles and be replaced by some other system. This thesis is a study on a two-level low voltage (1 kV and 0.4 kV) electrical system with the aim to investigate if it can be an alternative to the system used today taking into account the voltages, fault currents and costs.In this thesis the following tasks have been performed:? Gathering of data? Description of basic theory? Loadow and fault current calculations of the system with MATLAB? Life Cycle Cost estimate of the system? Analysis and conclusions from the resultsThe results show that the new system can be an alternative to replace today's system. The simulations and calculations show that the voltage drop is at an acceptable level and that the fault currents are large enough to supply a safe disconnection if a fault occurs at the far end of the system..

Överföring av och beräkning med timmätta värden ? från MT2000 till Xpower

New technology makes it possible to remotely measure all consumers in a power network onan hourly basis and store the values in a database.This thesis work describes the conversion process between automatic meter reading systemMActor and calculation software Xpower.Then the possible differences between calculations of power networks using load curves incombination with a yearly estimate of consumption and calculations using hourly measuredvalues is examined.The result of the comparison shows that, for the power network under inspection, nosignificant difference could be noticed. This does not mean that calculations using hourlymeasured values would be unnecessary. I believe that in a near future calculations using hourmeasurements will be the primary choice for many power companies to whom technology isavailable.Also some basic calculations of fundamental power network parameters, such as power factorand loses, are presented using hourly measured distribution transformers in combinations withits hourly measured loads.The report is written in Swedish.

Spetsbärförmåga hos betongpålar slagna i friktionsjord

The purpose of this study was to build a database for point-bearing piles in dense noncohesive soil, predominantly moraine. Further, the database was analysed and areas with difficult geotechnical conditions was identified.The database includes for point-bearing piles driven to refusal in moraine. Piles with mainly shaft friction have been excluded. Only concrete piles have been included. Geographically the database covers almost all geotechnical conditions of Sweden.

Realisering av en modulär skogsmaskin - En skalmodell

Wood for commercial use is harvested from forests using forest machines like harvesters which folds, branches and cuts trees and forwarders which transports logs to a landing area for further transport to a processing facility. Future forest machines have to be much gentler to the machine operators and forest soil than today's machines. Hence new machine solutions must be developed and tested. A practical way is to develop a physical scale model which can be used as a test-bed to incorporate different types of solutions for suspensions, cabin damping, tires and tracks, crane and overall architecture. The aim of this project was to develop such a 1:5 scale model of a forest machine, named as ?Skogbil.A scaling strategy was employed to arrive at important scale dimensions and specifications ofSkogbil which would be comparable to the full scale model.

Produktivitet vid stubbskörd :

Stump harvest could be found in the late 1970?s and the early 1980?s. And now when the prices on energy are high it has become an interesting topic again. This work has been conducted within Holmen Skog?s stump harvest testing in Norrköping.

Rundstyrning i lokalnät : En förstudie i tekniska och ekonomiska konsekvenser för Värnamo Elnät AB

Värnamo Elnät owns and operates a ripple control system which is used to control loadsespecially when the grid is heavily loaded and for control of street lighting. This report aims atclarifying technical and economic aspects of the ripple control system?s future. The system wasinstalled from 1975 and onwards and its use was greater in those days when the controllableloads where greater then today, the current controllable load level is about 3 MW. The reporthighlights three different aspects of the ripple control system?s future ? retain the currentsystem, reinvest in a newer system or discontinue the system.In the report the author also discusses relevant connections to Smart Grids and future meteringsystems and tariffs.

Optimering av tippram : tillhörande lastväxlarvagn Parator LX10-20

Norrborns Industri AB in Bollnäs manufactures truck trailers with the brand Parator. One of their trailers is Parator LX 10-20. The trailer is designed to transport hooklift containers with the option to tip loose goods such as gravel, asphalt and seed. The container is mounted on a frame which is placed on the chassis. To reduce weight a redesign of the trailer is needed.

Eurokoder : en jämförelse mot BKR

In Sweden there are currently two separate guidelines you may use whenperforming calculations on frameworks, BKR and the Eurocodes. Although at theend of 2010 you are not allowed to use BKR any longer and only the Eurocodeswill be viable. The aim of this thesis is to explain how the Eurocodes and EKS work and alsohow they compare to the current guideline BKR. Similarities and differencesbetween these guidelines are also discussed so that the reader will get a betterunderstanding of how the Eurocodes are applied. The areas discussed are asfollows:Principles and adviceSafety ClassesSymbols and IndexesLifespanLoads and partial coefficientThe thesis also deals with the impact that this transition into a new guideline willhave on corporations, guideline costs, education and computer software. As anexample a rough estimate on what costs this transition will create on a companywith 20 employees is also included. Calculations have been performed in order to investigate how the design valuesdiffer between the two guidelines, the Eurocodes and BKR.

Dygnsvariation av metanemission från en anlagd våtmark

The aim of the study was to investigate if methane emission in a constructed wetland changed in a diurnal pattern correlating to temperature, humidity or light conditions. The gas measurements were carried out with a static chamber technique. The wetland (in Nykvarn outside of Linköping, Sweden) takes care of wastewater to reduce the nitrogen loads. Measurements were carried out at three different occasions in the summer of 1998 on two sites in the wetland. One site was close to the inflow, inhabited by Lemnaceae, and another site was located further downstream inhabited by the emergent macrophyte Typha latifolia.

Modellering av manövercylindern för Nosstället på JAS39 Gripen

When models are used to describe physical phenomenon during development or modification of a technical system, it is often possible to reduce both the time needed and the overall development cost. With the use of models it is also possible to investigate the potential of the selected solution, without the need for any expensive details and testrigs. In many cases it is also not possible to test all the aspects regarding the functionality that are desired from the system, without using the complete and final product.In this case a model based approach has been used to optimize the different parameters in the new snubbing mechanism for the Nose Landing Gear Retract Actuator on the JAS39 Gripen.During the simulations, upper and lower boundaries were calculated for the length of the spring and the diameter for the restrictor. The governing constraints were given by the requirements for the retraction time during cold conditions and that the amplitude of the alternating loads in the uplock mechanism were brought to an acceptable level.The most promising results from the simulations were then used in a limited number of trials in the hydraulic rig to verify that the configurations comply with the requirements.The final parameters for the snubbing mechanism were chosen to 35±1mm for the spring and 0.4-0.5 mm diameter for the restrictor..

DESIGN AV ALUTON 38? FRAKTBÅT FÖR KUSTNÄRA TRANSPORTER

This master thesis is about designing and dimensioning a boat for transport of caravan, car, trailer or ATV. Buoyancy and stability are important properties as the pontoonboat should also be able to serve as a workboat. Many of the vessels on the market today that is being used for similar purpose are stable enough, but their hull is often similar with barges and thus too slow. This work has been to construct a boat that has good stability but also has a hull that enables it to move faster, is more maneuverable and having a more attracting design than today?s barges.

TOMO Hugglink

Tomo Hugglink (TOMO Skog) is an innovation for harvest and transport of biofuels. The system consists of a truck, a chipping unit and crane mounted on a link and a wood chip trailer. The system works in such a way that the chipping unit is disconnected and placed on the site and wood chips are loaded directly into the wood chip trailer.The aim of this study was:- To examine the performance of the TOMO Hugglink system under different conditions such as the size, placement and quality of the pile.- To calculate the cost per raw ton for two vehicle combinations at different transport distances and to examine the effect of a reduction in set-up time and an increase in load weight.- To identify possible improvements with the TOMO Hugglink system.A time study was conducted within the thesis work to make it possible to determine production and time consumption. In the subsequent economic analysis the cost per tone at different transport distances was calculated for two different lorry concepts. Furthermore the effect of a reduction in set-up time and an increase in load weight was calculated.Under current conditions the utilization of the chipper is low and only 29 % of the total system time is occupied by chipping.