3962 Uppsatser om Cost-of-production - Sida 9 av 265

Planeringsverktyg för ABB Capacitors : Planering av körsekvens

ABB Capacitors is looking to introduce LEAN within their organization. The purpose of this research is to suggest ways to improve the production planning in order to facilitate the company?s production processes. This should be done in accordance with the LEAN concept.Today, ABB will produce two of the customers? orders at the same time.

Håller vindkraften vad den lovar?

The purpose of this study is to investigate how much of the estimated annual electric energy production from Swedish wind power that actually was produced, as well as the history of this agreement over time. The aim is to also examine if there are properties that have caused some group of wind power plants to produce more or less, compared to their estimated production. Operational data on wind turbines collected by the Swedish Energy Agency was analyzed. A survey was made among owners of wind power plants with a nominal power of at least 2 MW. Two different methods for normal year correction of production data were used and compared.

High Orbit Ion Cannon : Går det att skydda sig?

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.

Effektivisering av produktionsgrupp : Improving the efficiency of a production group

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Övergång till helkrossballast : En studie för Strängbetongfabrikerna i Veddige och Herrljunga

This exam report has been developed in association with Strangbetong AB, Sweden.The natural gravel that is being used as fine aggregate for concrete production today is an ending natural recourse and the Swedish government has decided to strongly reduce the extraction from the year of 2020. The only reasonable replacement is aggregates from crushed rocks but this material has other properties than natural aggregates. The concrete manufacturers now have to learn how to use these new fine aggregates in a cost effective way in order to ensure the quality of their concrete production.In this project, crushed aggregates and combination of crushed and natural aggregates have been tested with existing formulas for fresh concrete. The two parameters yield stress and plastic viscosity have been measured which gives a good description of the workability of the fresh concrete. Different methods to make measurements on the dry fine aggregates, has also been tested, to find out if there is any correlations between these parameters and the parameters from the measurement on the fresh concrete..

Utvärdering av tillverkningsmetoder för svarvbommar

On today?s competitive market, it is difficult to achieve profitability trough high prices on manufactured products. Profitability must be obtained through low manufacturing costs, high quality and short lead times. One of the companies on the market is Sandvik Coromant, manufacturer of tools and chips for metal cutting. This master thesis investigates the methods of manufacturing for boring bars at the manufacturing unit GVH4 at Sandvik Coromant in Gimo, Sweden.

Fo?rstudie fo?r automatisering av skateboardtillverkning

This report is based on a thesis that was carried out during spring 2012. The report covers the development of a preliminary study to Performance Sk8. The purpose of the study is to facilitate and contribute inspiration to Performance Sk8 to run an automation project to bring home their production to Sweden from China. The reason is to gain a greater ability to control quality, produce smaller batches and reduce the cycle time to reduce costs.The goal is that the preliminary study shall meet the requirements and wishes Performance Sk8 and other partners defined. The pre study will contain different cost proposals for the automation of selected process and serve as a basis for procurement of the equipment.The pre study has resulted in some proposed solutions to the various steps required to automate Performance Sk8 ?s production.

OTEC-Ett energialternativ för enhållbar ö

Ocean Thermal Energy Conversion (OTEC) is a technology that utilizes the temperaturedifference in oceans between the warm surface water and the cold water at 1000 m depthto produce electricity. The purpose of this report is to investigate if OTEC with its synergiescould become a commercially feasible energy solution for a small island. A literature reviewis conducted to explore the different OTEC technologies and to what extent the threesynergies; fresh water, air conditioning and aquaculture, could be used. In order to calculatethe profitability of these synergies there is also a study conducted on the conventionalmethods and cost of fresh water production, aquaculture and air conditioning. A model is setup using a scenario of a small tropical Island with population of 100 000 people.

Nutrient efficiency in Swedish dairy cows fed total mixed rations or partial mixed rations

The relatively poor economy in European dairy farming might be improved from efficient feeding systems and dietary management. Increasing herd sizes and transition to loose housing systems in Sweden, increases the possibilities for other feeding systems than separate feeding that is the traditional feeding system in Sweden. Other possible feeding systems are partial mixed ration (PMR) and total mixed ration (TMR), where the TMR system sometimes is associated with overfeeding and thereby increased environmental impact and high feed cost. Diets providing nutrients above or below animal requirements are considered as unbalanced, which in turn are associated with reductions in health, fertility and milk production. On the other hand, a balanced feed ration improves feed efficiency, nitrogen utilization and profitability.

Emballage för väggelement i trä : Paketering, hantering, lager och transport

As a company it is required to work with strategies to minimize costs such as packaging and logistic costs. The increased market of industrial produced wooden buildings results that the time and the cost which the packaging of prefabricated building elements consume, is experienced to be in greater need of development than before and demands a better solution. The aim with this dissertation was to discover how the development of the handling of the packaging can improve the packaging process. The goal was to present improvement proposals for a simplified and thereby a more efficient production in time and cost perspective.The packaging process which includes packaging, handling, storage and transport were studied. Interviews were made with participants from the market for manufacturers of wooden houses and a case study was made at the company A-hus.

Livscykelkostnader för vindkraft : En jämförelse av fallstudier

I denna rapport har det utförts två fallstudier från två olika vindkraftsanläggningar och med hjälp av en utarbetad modell har livscykelkostnaderna jämförts för de två fallstudierna.Resultatet visade att livscykelkostnaden per producerad kWh sjunker allteftersom den installerade effekten blir högre.Kostnadsmodellen som utarbetats och tillämpats för resultaten har visat sig ha hög verifierbarhet då resultaten har varit jämförbara med litterära studier..

Toleransproblem vid produktion och montering av prefabricerade betongelement

The idea with constructions made out of prefabricated elements is that it should be quick and easy to build as the demands for lower production costs, increased profitability and shorter production times are constantly increasing. High accuracy in measurements and well-balanced tolerances is required to achieve this. The fact that the concrete-elements doesn?t fit and that damage occurs during assembly is a highly topical issue even though we now have methods and systems that make this high-intensity construction possible. Through this report we want to highlight the problems that cause the dimensional and tolerance problems and give suggestions on how to come to terms with these.

Utvärdering av svensk vindkraft : Skillnaden mellan skogs- och traditionella placeringar

During the last years commercial Wind Power Turbines (WPT) has become larger regardingto the generator sizes and hub heights. Available hub heights around 100 meters is nowcommon, which has led to profitability for WPT located in forests where there normally are tolow wind speeds. The current knowledgement regarding turbulence and the variation in thewind profile for the outcome of the power production for the WPT in forests is limited.In this Master of Science thesis an investigation concerning forest located wind power plantshas been made. The purpose has been to investigate if plants located in forest perform lesscompared to wind power turbines located at more common locations.The analyses are based on statically material for determining the availability,production/generator size, production/hub height, production/swept area and how thetopography affect the production results.The analyses show that the variation in production result for WPT located in forest comparedto turbines located at other locations is small. The availability is high and the productionresults are good..

Kalkylering i flygbranschen: En fallstudie av ett flygbolag

The purpose of this thesis is to analyse and propose improvements to the cost accounting system in use at an airline operating on the Swedish market. The choice of study object is based on the airline?s desire to have its cost accounting system evaluated. During the analysis we have identified a number of points where the current cost accounting system does not correspond to its intended purpose. These points include significant groups of costs not being considered in the current system, potential over capacity is not visible and logic connections between distribution keys and the use of resources are sometimes lacking.

Erfarenhetsåterföring :  

This thesis has been done in collaboration with Peab Stockholm Building 3, which is a region within the Peab Sverige AB. The report is based on a survey and studies of Peab business management systems and production literature. For general information gathering has literature from well-known sources collected in libraries and through the Internet. It shows through the work that Peab has routines for experience feedback in the construction process, but that these procedures work in a small scale and the practical work experience feedback does not work at all. This is also something the construction industry in general also perceived as problematic. The questions in the report are of a wide scale and concerns construction errors cost, how the employees perceive that the company takes advantage of the skills and the mental stress in production line. The goal is to find how Peab Stockholm Building 3 will work on the experience feedback to allow for better productivity. In conclusion, the report author tries to demonstrate what can lead to increased productivity and improved work experience..