Sök:

Sökresultat:

1968 Uppsatser om Cost-effectiveness - Sida 30 av 132

Utredning och implementering av en prototyp för integration av Prevas FOCS och ABB 800xA

ABB and Prevas have initiated a collaboration to sell a system to optimize steel industry furnaces, called FOCS. The purpose of this thesis is to investigate possibilities for integrating Prevas FOCS and ABB 800xA.The result of the investigation is used for an implementation of a prototype of the integrated system. The study shows a general method that can be used when implementing two software systems. The prototype of the integrated systems is made with usability principles in mind. This is a very important aspect in order to create a good working environment for the operators of a steel plant.

Modellering och verifikation av hjulupphängning för ett ultralätt elfordon

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Fastighetsmäklartjänster på nätet : en fallstudie av Adirekta, A-mäklarna och HemOnline

To purchase a house or an apartment is often one of the major personal financial commitments for a person. In 2005, 84% of the homeowners sold their homes using a estate agency. During 2006 several new opportunities appeared on the market, giving the homeowners more of a choice in what way to sell their homes. Media describes the alternatives in general ?as the agents on the Internet?.

Beslutsfattande vid anbudsgivning hos svenska byggentreprenörer

This thesis examines the tendering process from the point of view of Swedish building contractors. The purpose with the study is to chart the decision process for the contractors during the tendering process. The study is designed as a survey study. This made it possible to reach a wide base of respondents, not letting such factors as geography being an issue. The survey itself was characterised by a very high response rate compared to other similar studies. The result from this study shows that former experience from similar projects, current workload and the clients economic condition are very important factors for both whether or not the contractor will bid for a project as well as the cost estimation and tendering price. Former experience from similar projects is also an important factor for the determination of the indirect costs.

Stölder och förebyggande åtgärder : en studie hos Holmen skogs entreprenörer och egna maskinlag

This master thesis was performed as a mission from Holmen Skog with the purpose to investigate to which extent their own machine teams and engaged contractors were exposed to theft and vandalism, and most common preventive measures used. With the help of collected data the study should lead to proposals of preventive measures that can help the machine teams in their struggle to minimise theft and vandalism. Theft and vandalism are a big problem for Swedish forest contractors. In a scarce economic situation thefts and vandalism rapidly decrease the profit for the contractors. However, the last years have resulted in a positive awareness of thefts, and more and better preventive measures have been developed. With the initiative of this master thesis, Holmen Skog show that they are aware of the situation and that they wish to take control of the problem. A total amount of 108 questionnaires was sent out to Holmen?s own machine teams and engaged contractors.

En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hur skiljer sig investeringsbedömningen mellan kommunala och privata fastighetsbolag?

This dissertation aims to explore how an investment appraisal differs depending on if it is conducted by a municipal or a private real estate company. Municipal and private real estate companies are not performing on totally equal terms in the property market. A municipal company in Sweden has a public service mission. The consequence due to that mission is that they have limited yield potential but on the other hand the right to certain subsidies. They are also limited by the law of public purchasing (in Swedish: Lag om offentlig upphandling) in the investment process.

Gröna backar

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Total Cost of Ownership : Skillnader i kostnader mellan leverantörer

Inköpsorganisationen har varit och är föremål för förändring. Vid sidan av denna förändring har Total Cost of Ownership (TCO) utvecklats. TCO sträcker sig bortom inköpspriset och innefattar enligt Degraeve et al. (2005a) alla kostnader relaterade till anskaffningen och kostnaderna användningen av en vara eller tjänst medför genom ett företags hela värdekedja. Utifrån en tillhandahållen förståelse för kostnaderna ett företag ådrar sig utifrån etablerade leverantörsrelationer kan TCO fördelaktigt användas vid valet av leverantörer och till att utvärdera prestandan av leverantörer.

Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 30 Nästa sida ->