Sök:

Sökresultat:

10366 Uppsatser om Cost-effectiveness analysis - Sida 43 av 692

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Modellering och verifikation av hjulupphängning för ett ultralätt elfordon

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Sjuksköterskestudenters uppfattning om interprofessionellt lärande

Aim: To evaluate nurse student?s apprehension of an interprofessional seminar as part of training. Method: A descriptive, qualitative study built on the analysis of 43 questionnaires and one group interview with nurse student?s who participated in the seminar. For the analysis of the collected material we used the method of analysis of contents as described by Graneheim and Lundman.

Fastighetsmäklartjänster på nätet : en fallstudie av Adirekta, A-mäklarna och HemOnline

To purchase a house or an apartment is often one of the major personal financial commitments for a person. In 2005, 84% of the homeowners sold their homes using a estate agency. During 2006 several new opportunities appeared on the market, giving the homeowners more of a choice in what way to sell their homes. Media describes the alternatives in general ?as the agents on the Internet?.

Beslutsfattande vid anbudsgivning hos svenska byggentreprenörer

This thesis examines the tendering process from the point of view of Swedish building contractors. The purpose with the study is to chart the decision process for the contractors during the tendering process. The study is designed as a survey study. This made it possible to reach a wide base of respondents, not letting such factors as geography being an issue. The survey itself was characterised by a very high response rate compared to other similar studies. The result from this study shows that former experience from similar projects, current workload and the clients economic condition are very important factors for both whether or not the contractor will bid for a project as well as the cost estimation and tendering price. Former experience from similar projects is also an important factor for the determination of the indirect costs.

Stölder och förebyggande åtgärder : en studie hos Holmen skogs entreprenörer och egna maskinlag

This master thesis was performed as a mission from Holmen Skog with the purpose to investigate to which extent their own machine teams and engaged contractors were exposed to theft and vandalism, and most common preventive measures used. With the help of collected data the study should lead to proposals of preventive measures that can help the machine teams in their struggle to minimise theft and vandalism. Theft and vandalism are a big problem for Swedish forest contractors. In a scarce economic situation thefts and vandalism rapidly decrease the profit for the contractors. However, the last years have resulted in a positive awareness of thefts, and more and better preventive measures have been developed. With the initiative of this master thesis, Holmen Skog show that they are aware of the situation and that they wish to take control of the problem. A total amount of 108 questionnaires was sent out to Holmen?s own machine teams and engaged contractors.

En LCC och LCA analys av olika fasadmaterial - En studie med fördjupning mot Puts, Steni Colour och Tegel

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Provtryckning av passivhus - De kritiska punkterna skall bidra till att minska luftlackagen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

"Man kommer inte särskilt långt om man sitter på sin lilla ö" : En studie om samverkan kring ungdomsarbetslöshet

The aim of this study was to examine the view that officials involved in youth unemployment have on the significance of collaboration between organizations working with unemployed youth. The study was based on nine qualitative interviews with officials from PES offices and from municipalities such as job coaches. The results were analyzed based on qualitative content analysis. The analysis led to two different themes: conditions and the individual. In the analysis two different theories were used, new institutionalism and Lipsky's theory about street-level bureaucrats.

Motivationsbefrämjande åtgärder - En studie på Peab ur ett arbetsledarperspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Gröna backar

The transformation within the swedish infrastructure has been a slow process from thebeginning of time. For almost a decade, the traditional form of contracting regardingbuildings and foremost infrastructure has evolved contracting involving the owner to definethe outcome of the product, regardless involvement from the supposed contractor. As forthe swedish market, the traditional design-bid-build (DBB) have been the primary choice ofcontracting. Although changes have been made over time regarding contracting formswithin the road administration, the railway sector has not improved or justified changesregarding choice of contracting, they have conducted same contracting relationshipsbetween them and the contractor.This bachelor thesis, conducted at the Swedish railway administration with supervision ofprofessor Kristian Widén at Lunds University, explores the forces behind the new era ofcontracting within the railway administration. This bachelor thesis focuses mainly oncontracting regarding design-build-operate-main (DBOM), the new contracting formulabetween the owner and the contractor.

Total Cost of Ownership : Skillnader i kostnader mellan leverantörer

Inköpsorganisationen har varit och är föremål för förändring. Vid sidan av denna förändring har Total Cost of Ownership (TCO) utvecklats. TCO sträcker sig bortom inköpspriset och innefattar enligt Degraeve et al. (2005a) alla kostnader relaterade till anskaffningen och kostnaderna användningen av en vara eller tjänst medför genom ett företags hela värdekedja. Utifrån en tillhandahållen förståelse för kostnaderna ett företag ådrar sig utifrån etablerade leverantörsrelationer kan TCO fördelaktigt användas vid valet av leverantörer och till att utvärdera prestandan av leverantörer.

Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 43 Nästa sida ->