Sökresultat:
4692 Uppsatser om Cost of quality - Sida 51 av 313
Det lidande djuret: från ett djurvänligt svenskt folk till ett humant samhälle. En diskursanalys av föreställningar om djur i svensk djurskyddspolitik under efterkrigstiden.
Introduction: The health for individuals with intellectual disabilities is asubject that is prioritized by the Swedish Institute for Public Health. Socialsupport has been proven to be important for health and quality of life. Despitethis fact there is no research available regarding the influence social support hason health and quality of life for people with intellectual disabilities in Sweden.Aim: To describe social support and the consequence of social support forhealth and quality of life for individuals with intellectual disabilities. Method:A litterature review of research in a defined area with a descriptive design.Systematic searches for articles were done in several databases and ultimately16 articles were chosen. Themes and categories were created with respect to theaim of this study during the analysis of the articles.
Metodval i projekteringsfasen : Bostadshus Ljusbojen 1
This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.
Återladdning av borrhål i Borås Djurpark. En studie om möjligheter att kombinera solfångare med ett befintligt bergvärmesystem
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Beskrivning av fel och brister på broräcken och förslag till förebyggande åtgärder avseende tillverkning och montering
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Sättningsberäkningar I kalkcementpelarförstärkningar. Jämförelse mellan mätningar och beräkningar enligt Allmän teknisk beskrivning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Besiktningar inom byggbranschen Deras kompletterande verkan
Inspections within the building industry are surrounded by a rigorous set of rules presented in AB 04 and ABT 94. There are several types of inspections but the final inspection has the biggest legal implications and is important in many aspects, since it?s the one that ends the contract time for the contract i.e. when the contract is passed on from contractor to the client. It is also a confirmation on how the contract has been carried out and that the potential guarantee times after the contract will start to apply.
The objective of the following report is to find out what different types of inspections there are as well as a legal understanding about what happens before, during and above all after the final inspection.
Storlommens (Gavia arctica) häckningsframgång relaterad till vattenkvalitet
This work investigates the breeding success of the Black-throated Diver, Gavia arctica, related to the water quality in three lakes located in the Vallentuna area, north of Stockholm, Sweden.For more than 30 years, I have studied the bird life around these three and other nearby lakes, and noticed that the Black-throated Diver breeds in some lakes, but not in others.The results confirm that the deep and clear lakes Tärnan and Stora Harsjön have good water quality regarding pH, alkalinity, aluminium and Secchi disk values. As expected, the Black-throated Diver shows breeding success in those two lakes, but does not breed in the shallow and eutrophic lake Mysslingen. .
Image i förändring : En fallstudie av SAS Sverige AB
During the early 1990´s, the Swedish commercial air traffic was de-regulated and the new market-condition made it possible for low-budget airlines to enter the Swedish market. The former monopolistic airline company, Scandinavian Airline Systems (SAS), was facing a new type of competition which had the advantage of offering much cheaper air trips than SAS. Adding the decrease of profitability that struck SAS as well as other airline companies after the terrorist attacks on the 11th of September, forced them to carry out a mayor reorganization programme. The programme, called ?Turn Around 2005?, was a direct economical measure that begun in 2002 and lasted until 2005 and resulted in a cost saving of 14,5 billion SEK as well as a notice or a transfer of 6000 employees.The purpose of this essay is to investigate if the opinion of the consumer, the image, corresponds with the profile that SAS wishes to mediate today.
Mätningar och undersökning av elkvaliteten i elnätet på reningsverket GRYAAB, i Göteborg
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Inventering av bitumenbundna lager med hög stabilitet ?hård asfalt? anpassade för stora hjultryck på industri- och hamnytor
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Effektivisering av dataflödet mellan anläggningsmodell och maskinstyrning - En översikt av flödet från konsult till entreprenör
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Jämförelse av frånluftsvärmepumpar
In order to reach the environmental targets, set up by the EU, there are many measures taken to make Sweden more energy efficient. In the housing and real estate sector, an installation of an exhaust air heat pump that reuses the heat in the exhaust air in order to lower the amount of acquired energy, is an example of such an action. The recovered energy can then be used for heating of radiators and tap water. This report aims to evaluate and compare three different systems using exhaust air heat pumps regarding COP, degree of coverage and cost savings. This study was delimited to only account for apartment buildings.The theory chapter describes the different conditions and factors that affect a building?s energy balance.
Effektivisering av kvävereduktionen i en konstruerad våtmark avsedd att behandla avloppsvatten
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.