2637 Uppsatser om Construction projects - Sida 1 av 176
Värdering av anbud vid kommunala upphandlingar av byggprojekt
The thesis deals with evaluation of tenders for communal construction procurement. Each year the public procurement equals the value of millions of Swedish kronors, of which Construction projects makes up a large proportion. These projects tend to often exceed their budgets. The aim with the thesis is to investigate if there are faults in the tender evaluation process. The theoretical framework for the study partly consists of a review on how the communal evaluation work is described in law and practice.
Ta bort tidstjuvarna! : Om tidsbesparande effektiviseringsåtgärder inom det kommunala bostadsföretaget Gavlegårdarnas byggprojekt
AbstractThe development of the construction industry is slower compared to other industries. This implies that there must be improvements in this field. One step to increased effectiveness in Construction projects is making the construction process more efficient, therefore resulting in a positive result for both the actual construction project and for the overall branch. The purpose of this study is to identify areas for improvement within the municipal housing company Gavlegårdarna completed construction project, who will then contribute to increased efficiency in their upcoming projects. The work has been performed with the help of two case studies examine Construction projects "Fullriggaren" and "The three nursing homes." Opinions about what could have improved the efficiency of these Construction projects further have been collected with the help of an interview study among some of the project participants involved in both projects.There have been many studies addressing the topic of how the construction process can be streamlined and similar studies that have been previously conducted.
Handledning vid framtagande av handlingar för Generalentreprenad
This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..
Byggprojektstyrning med hjälp av dator -Studie utförd vid byggföretaget NCC
Styr is a computer program that the construction company NCC use in their Construction projects. The program is used to keep the economy of their projects in a good order and things for the best in an early phase. The problem is a low extent of utilization. During the latest decade NCC has put a lot of job and money trying to develop the program. The question is how to get the employees to use the program in a greater extent.
Upprättande av mall för fuktsäkerhetsbeskrivning : Genom granskning av projekt ur fuktsäkerhetssynpunkt
During the 1990?s a large number of building projects were revealed where lack of moistsafety precautions during the construction process had led to extensive moisture damage. Alsoresent implemented studies have shown that the problems with moisture damages have ratherincreased than decreased during the past few years. Moist is considered to be one of the mainfactors to cause unhealth due to deficiencies in the indoor-environment and does also causeunnecessary expenses and a reduction of the confidence in the construction industry.In this Bachelor of Science thesis three projects have been reviewed to examine how moistsafetyhas been observed during the construction process. Main focus has been to identify thebuilding components that are the most exposed to moist, and to examine how they have beentaken into account during the period of design and construction.
ÄTA-arbeten på Trafikverket
?ÄTA-work? (Changes, Supplementary and Retiring works) is more or less common in all Construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of ?ÄTA-work?.
Effektivisering av EPC projekt : Fallstudie Johnson Controls
In todays society the demand on companies to deliver better project management is crucial for them to survive. The higher demands from clients make older project management weak and unreliable. In the constructions sector more and more companies are created and the competition is higher than ever. The clients are aware of the higher competition in the construction sector. This has resulted that construction companies must now make their project management more efficient to create better projects and better relationship with clients. The purpose of this thesis arose from this problem in the construction sector.
Uppkomst av materialspill vid nyproduktion av flerbostadshus
Construction waste from the housing industry includes all unnecessary consumption of building materials. The definition of construction waste is construction materials that has not been built in and becomes waste. Constructions waste can be divided into two types of contributions: operational and work site contribution. Some of the common construction materials in housing industry have such low usage level as 75 % and the rest becomes construction waste. Low usage of construction materials creates unnecessary costs and has a major environmental impact.
Byggprojektstyrning med Earned Value Management
AbstractToday, too many Construction projects are delayed and deviates from the budget. Agood project management is the basis for successful construction project. The mostcommon planning methods in the construction industry is currently Gantt chart andCPM. The problem with these is that focus is only at the time of the project anddoesn?t handle the budget.
Riskhantering i vägprojekt : Effekt, nytta och förbättringar
The aim with this thesis is to study the risk management in Construction projects at the Swedish Road Administration, SRA. Furthermore, the aim is to find the effects of the risk management. The theorem of this thesis is that the positive effects of the risk management in Construction projects create additional value to the project. These additional values are that the project itself becomes resilient and that the project goals are achieved without any significant disturbances.This thesis shows that the risk management in Construction projects do not follow the guidelines set out by the SRA. This is due to a lack of education in the method and a difficult method all together.
Trafikverket : Kritiska faktorer i projekt inom avdelningen Nationella Projekt
This study has been made on behalf of the Swedish Transport Administration to study the work of the department National Projects. The Swedish construction industry has for many years been characterized by low productivity. By being the largest purchaser of contracts in the industry the Swedish Transport Administration has a unique opportunity to influence the productivity. In order to improve in productivity The Swedish Transport Administration is adopting a new role in which they will order more turnkey projects. In our study, we will focus on how one department within the Swedish Transport Administration, National Projects, can perform successful turnkey projects.To clarify how the department National Projects can perform successful projects, this study identifies critical factors for projects and their links to different phases of the project.
Projektorganiseringen som drivkraft och hinder för industriell förnyelse i byggindustrin : en fallstudie av Skandionkliniken
Understanding how innovation and renewal occurs in an industry is important for how to manage technical development for individual companies. It is also important for creating a beneficial industrial context for renewal, from both a political and an industrial perspective, in which new solutions can arise and spread through the involvement of several actors of the industry. How innovation and renewal occurs in the construction industry in Sweden is however viewed differently. One challenge that has been pointed to is that most of the work performed in the construction industry is organized in projects, which in turn should affect how innovation and renewal can be achieved. The aim of this thesis is to provide an understanding of how the project organizing in the industry affects innovation and renewal. This is executed through a case study of the construction of Skandionkliniken, a proton therapy clinic, and by using an industrial network theory that challenges the traditional view of how innovation is achieved.
Kommunikations- besluts- och informationsflöden i byggprocessen
Construction projects are organized in different shapes and disturbances in the information flow in these processes can lead to problems, such as delays and/or a lower quality. Therefore, a well-functioning interaction between actors and a well thought out-communication at an early stage is of crucial importance. The main question is "How does the communication of decision and information flow in the building process and what barriers and opportunities can be observed?". This diploma work has been written with guidance from Bjerking AB and to answer this question, a collection of empirical data conducted via semi-structured interviews.
Hur skapar man en funktionell och beständig dörrmiljö? : En närmare studie av ståldörrar
Today?s construction buildings contain more advanced technologies than before. The development of newer and stricter regulations to the construction industry makes the door environment more and more complex.In large Construction projects the door environment is held up as a major challenge to get to in a good way. It turned out after a discussion with one project manager and a site manager at NCC, that the door environment is difficult to get right in major Construction projects and it often causes many error reports in to the aftermarket after that the final inspection is completed.Interviews have been done with key figures in the building process at NCC and Akademiska hus. A study on a university building for around 3500 students and with 300 workplaces was made.
Sensorsystem till hinderhanterande robot
The projects goal is to construct and program a robot that is controlled from a computer but also have an obstacle handling function that allows the robot to navigate around the object by itself.The robot is a simple construction and the number of components and functions is kept at a minimum. A tricycle construction was chosen because it?s the simplest. Communication between the robot and the computer also kept as simple as possible..