Sök:

Sökresultat:

10202 Uppsatser om Construction process success - Sida 2 av 681

Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv

This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit. The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes. The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process.

Potentiella armeringsfel inom byggproduktionen : En generell studie

Reinforcement is of great importance to fulfill the dimensioned strength of a concrete construction. This requires that the work needs to be carried out with adequate results that neither endangers the workers or the safety of the construction. Progressive development of the planning phase, construction documents, and construction methods is in constant need since the technology constantly evolves.In order for contractors to be able to get acceptances from their quotations requires that they have to increase their working pace in order to be able to leave a quotation with a lower price than the competition.Due to the increasing pace the different parts involved in the construction process is subjected to time pressure. The design stage, construction documents, work preparation and the execution are all affected when everything has to be finished quickly. To avoid problems, it is required that all parts are able to deliver good quality solutions and results under the influences of time pressure, which is not always easy.

Entrepreneurs? work with Factors for Success in a Start-up Business

The purpose of this study is to examine whether there are any key factors for success to look for in launching a new business that affects the subsequent performance of the venture. Further on, the study will examine if there are any differences between believed and actual factors for success for an entrepreneur and the key factors for success given by existing theory. The purpose of looking in to the assumed gap between existing theory and entrepreneurs? believed and actual factors is to distinguish factors that make start-ups evolve. It is then important to investigate how they have worked with their business start-up and how they have worked with key factors for success in order to understand the impacts of their decisions.

Handledning vid framtagande av handlingar för Generalentreprenad

This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..

Ekonomistyrningens påverkan på MRP-implementering: en fallstudie av ASSA AB

The implementation of a material requirements planning system is a complex and demanding task. There has been much research into what factors are important in such implementations, but seemingly very little about the links between critical success factors and management control systems. This thesis attempts, through a case study, to answer the question of how management control systems affect the implementation of an MRP system in ASSA AB, a Swedish manufacturing firm. Data is primarily collected through interviews. Theory regarding implementation success definitions, critical success factors as well as management control systems is presented.

Uppkomst av materialspill vid nyproduktion av flerbostadshus

Construction waste from the housing industry includes all unnecessary consumption of building materials. The definition of construction waste is construction materials that has not been built in and becomes waste. Constructions waste can be divided into two types of contributions: operational and work site contribution. Some of the common construction materials in housing industry have such low usage level as 75 % and the rest becomes construction waste. Low usage of construction materials creates unnecessary costs and has a major environmental impact.

Kategorisering av faktorer som påverkar flödeseffektivitet - En fallstudie på Capio St Görans Sjukhus

Swedish healthcare is in continuous need of cost savings and efficiency improvements in order to meet the increased demand for care. The theories of lean, developed from the industry, are applied more frequently on healthcare systems to increase effectiveness and reduce waiting times in patient processes. However, some processes seem to be more successful in their lean implementation than others. In this thesis, factors influencing flow efficiency in lean healthcare are examined. Through interviews with the top executive board at Capio St Göran's hospital, data is collected in order to analyze reasons for success.

Building Information Modeling : En möjlig modern arbetsmetod för Sweco Theorells AB

To challenge the competition within the construction business there are requirements ineffectiveness and use of operating computer based programs and work-methods. Thecomputer based programs are continuously improved and can at some point be the start of anew work-method. The work-method of tomorrow can be Building Information Modeling(BIM).This Master of Science Thesis gives an understanding in what BIM is and what therequirements for Sweco Theorells are in a future BIM-use as a consulting-firm. Theunderstanding is presented through a study of theory within the subject. The way of thinkingand acting among different disciplines and individuals within the building process isexplained through an interview study.The term BIM is regularly used.

Riskhantering i vägprojekt : Effekt, nytta och förbättringar

The aim with this thesis is to study the risk management in construction projects at the Swedish Road Administration, SRA. Furthermore, the aim is to find the effects of the risk management. The theorem of this thesis is that the positive effects of the risk management in construction projects create additional value to the project. These additional values are that the project itself becomes resilient and that the project goals are achieved without any significant disturbances.This thesis shows that the risk management in construction projects do not follow the guidelines set out by the SRA. This is due to a lack of education in the method and a difficult method all together.

Strategiska processer : vilka faktorer leder till en lyckad strategiimplementering?

The purpose of this essay is to compare a theoretical strategic process model with the strategic work in a Swedish bank. The reason of the comparison was to identify which key success factors that is essential in strategic implementation processes. To make this study feasible three qualitative interviews were executed and it also presents data from a quantitative survey performed by the bank. The theory of the study examines eight different parts that needs to be looked at attentively when new strategies are formulated. The results points out that the work at large correspond, nevertheless the theoretical framework points out the importance of the business mission to impregnate the whole strategic process.

The role and influence of the Architect in industrialized building

An emerging trend within the construction industry is the expectation of the customer to experience and sense the product, maybe even in a customized manner. The latter trend would extend the necessity of incorporating not only function and aesthetics, but also perception and sensation. To meet this trend while at the same time improve the productivity the use of information technology such as BIM and technical platforms has increased in construction projects. Nevertheless, in spite of large investments, the construction industry has not managed to increase the effectiveness and productivity as much as other industries. Evident is that successful use of information technology depend on the integration and collaboration of various experts in a continuous and dynamic process.

Ledarskap inom ramen för ett systemutvecklingsprojekt : fokus på en arbetsprocess med stöd i Vattenfallsmodellen

Many research reports mention the fact that a huge number of all system development projects never reach a successful ending; with other words never fulfil formulated goals. By identifying and forming success factors (and in some aspect risk factors) that the project manager in practice can use, this study may be seen as a step in the direction towards minimising the high number of failed system development projects. The purpose of this research report is to investigate how a system development project, where the development process is based on a specific development or process model (in this case the Waterfall model), can and should be driven. I aim to clarify what is demanded of a project leader for the specific development process and give an account for which eventual leadership qualities that can be well suited for given situation in relation to the need for technical competence. Among other things the project manager should inspire confidence, drive, be a decision maker, engage and own some form of basic knowledge in the field of system development.

Attityder och värderingars betydelse för ExTes framgång

Purpose: Our purpose is to examine how ExTe works with values and attitudes and if it has any connection to their success.Research questions: Does attitudes and values have anything to with ExTes success? Does ExTes management see their staff as a resource for development and do they deliberately work with it. Does ExTe follow their written Value book and do they continuously and active work with it?Approach: We have used a deductive way of reasoning and a qualitative study to gather the information needed. We have interviewed four staff members at ExTe.Conclusions: ExTes continuously and deliberately work with values and attitudes do have a meaning for their success.

Elektromagnetisk skärmning genom mekanisk omkonstruktion

This is a master degree thesis at Royal Institute of Technology (KTH) betweenÅngpanneföreningen and Programma. KTH is the examiner, Programma is the client andÅngpanneföreningen is mentor for this project.Programma has a product called TM1800 that has problems with EMC; the problem is thatthis product does only pass the CE-check with a small safety margin. This problem can besolved by reducing the radiation from the electric components in the product or by reducing offix base frame. In this degree thesis the focus is only on mechanical redesign.The main problems right now depends on the long distance between the screws, there is anisolating layer on most of the parts and the forces between the joints are too small. The mainfocus is to solve these three problems.The best solutions are when the whole base frame is more or less redesigned instead of onlyredesigning some of the connection points.

?Bollen susade in i bortre gaveln? - En studie i rörelsekonstruktioner och produktivitet

This paper investigates the grammatical construction intransitive motionconstruction with GOAL as it is used in Swedish (Swe. intransitivrörelsekonstruktion med MÅL).I examine in which ways the construction is productive, i.e. thepossibility to use the construction with new verbs as well as withordinary motion verbs with new functions. The notion of productivity isbased on the construction?s type frequency and semantic openness(Goldberg 1995, 2006; Barðdal 2008; Bybee 2010).

<- Föregående sida 2 Nästa sida ->