Sökresultat:
1980 Uppsatser om Construction moisture - Sida 7 av 132
Arbetsmiljöansvar på en gemensam arbetsplats : En studie över hur arbetsmiljön samordnas på en byggarbetsplats med flera entreprenörer
This essay describes coordination of the work environment on construction sites where many entrepreneurs share workplace. As employer, the entrepreneur has main responsibility for the workers safety on the construction site, the project supervisor is responsible for the work environment, and to coordinate the work environment a coordinator of the construction work environment is appointed. The purpose of this essay is to describe how the work environment is ensured on a shared workplace. In order to answer the essays questions I?ve used a juridical method to interpret the law.
Stress i byggbranschen : Orsak till stress i byggbranschen samt förslag på åtgärder
Stress and burnout are two words that are commonly occurring in many contexts today. More and more people experience that they are stressed and that they does not feel well. The long term sick -leave increases as a consequence of people being burned out. These phenomena prolong over all ages, sexes, classes and professional categories, which probably means that the construction industry would not be spared. In the construction industry, stress and bad health are no new phenomenon, already during the 1970s and big parts of the 1990 s, the construction sector were exposed to the phenomena.A sector that has a large turnover annually cannot presumably be faultless.
Att få tillträde till trädgården: Om konstruktionen av chefskap i coaching
During the last decade executive coaching has become an increasingly popular method of management development. Few studies have been conducted within this area, especially in Sweden, and little has been said about the construction of management in executive coaching. The purpose of this master?s thesis is to study executive coaching from a social constructionist perspective, focusing on the construction of management. The two research questions are: How is management constructed in executive coaching? How can we understand the construction of management in executive coaching? Additionally, we identify gender as a social construction of importance and thus include a gender perspective in our analysis.
Performativitet och bildkonst: eller hur apor verkar i världen
This essay examines the visual art of Helena Blomqvist with theory of performativity from Judith Butler among others, with a focus on the potential of visual art to question and dislocate norms. It consists of an analysis of three works of art from three aspects: the work of art, the viewer and the situation, and eventuates in an analysis of how the works relate to representation and norms. The construction of the works is related to Butler's theory of identity construction..
Implementering av Virtuellt Byggande i byggprocessen : Fallstudie av NCC Construction Sverige AB
Virtual Design and Construction (VDC) is the definition for using BIM in the construction process to simulate and analyse the building. Resulting use of the technology will according to proponents lead to fewer construction errors, a better understanding between stakeholders for the construction project, less communication problems and a smoother construction process. Although BIM has according to researchers a big potential, few companies have succeeded in broad and continues implementation. The study aims to identify the factors affecting the implementation. More precisely identify what factors influencing the decision to adopt VDC and potential barriers in the diffusion process. The empirical findings are based on a case study of NCC Construction Sweden.
Miljöbyggnad i ombyggnadsprocessen : Miljöcertifiering av Jakobsbergsskolan i Kristinehamn
Climate change is an increasingly widely known concept. In the EU the construction sector is responsible for more than a third of the carbon dioxide emissions and 40 % of the total energy use. In Sweden, measures have been taken to prevent this climate change. By 16 targets, three of which can be linked to the construction sector, Sweden will reduce the negative trend. None of the three goals with relation to the construction sector will however be achieved before 2020.
Byggnadsarbetarens syn på att bli involverad i projekteringen : En intervjustudie i byggprojekt
Title Becoming involved in the planning process - from the construction workers perspective.University/Institution Halmstad UniversityKeywordsEmpowerment through participation, construction workers involvement in decision making in the planning process, knowledge management and communication in the planning process, partnering, human resource managementAimThe aim of this bachelor thesis is to provide knowledge and examine how construction workers perceive involvement in the planning process of partnering projects, what they can contribute and what they get out of the planning process.Methodology The study was conducted with a qualitative approach in the form of semi-structured interviews. The interview studie consist of 10 interviews with construction workers who are specially educated in participating in the planning process at the company ByggDialog AB.ConclusionAll respondents are positive to be involved in the planning process. The main advantages they can see is that they are able to influence technical solutions and methods that will be used later on in the production. Therefore it is important to consider when construction workers should be involved in the planning process so that they get the chance to influence in this decisions.When it comes to the decision making the construction workers should be involved in the decisions that are related to their tasks in the production such as technical solutions, choice of methods and materials. Their main duties and working hours should be in the production.Involvement in planning does not automatically mean that the construction workers are involved in the decision making, it is up to them how much they participate.
Konstruktion av efterbehandlare
The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.
Chefers identitet och identitetsskapande: en studie av chefer i offentlig verksamhet
The aim of this study was to gain a comprehension of managers experience of their identity and their construction of identity in the work sphere. 14 semi-structured interviews were performed with managers in the public sector. The interviews were analyzed from a hermeneutic approach. The results showed that the managers´ experience of their identity and their construction of identity were full of nuances and was characterized by a being and a becoming. The managers had several social identities at their disposal, which were brought to the fore due to the situation.
Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv
This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit. The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes. The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process.
Sensorsystem till hinderhanterande robot
The projects goal is to construct and program a robot that is controlled from a computer but also have an obstacle handling function that allows the robot to navigate around the object by itself.The robot is a simple construction and the number of components and functions is kept at a minimum. A tricycle construction was chosen because it?s the simplest. Communication between the robot and the computer also kept as simple as possible..
Utvärdering av BeWi Byggsystem
The construction industries are relatively conservative type of business that takes a longtime to adjust for new methods and embrace new ideas. It dose not matter if the newmethod seems to be an improved method as long as it is new and untried. Constructioncompanies are reluctant to change form a longtime working method to a relativelyunknown method.The purpose with our report is to perform an evaluation of BeWi construction method.Our goal are to present the generally opinion about BeWi from the contractors that hasbeen in contact/worked with the method. We also want to know from the contractor?spoint of view if BeWi and the method measure up to the standards that are presented byBeWi and if they believe that improvements need to be done.Our progress up to the final report has consisted of three parts[1]Field studies[2]Interviews[3]Literary studiesWe started out with field studies where we took notes and observed all the includedworking phases on the construction site when using the BeWi method.
Att återställa en naturlig ordning : skogshistoria och restaureringsbränning i Långsidbergets naturreservat
During the late 1800s fire suppression became increasingly effective in northern Sweden which led to decreased areas of fire-disturbed woodland and successive changes in the structure of forests. In the long run this can pose a serious threat to fire-dependent and fire-favored species. Today some fire-prone forest reserves are burned as a nature conservation act. Often partial cuttings are made before burning, with somewhat different motives. The purpose of the study in Långsidberget nature reserve was to give a general picture of forest history and its affect on today?s forest condition, and to show how partial cuttings affect burning conditions and results.
Långsidberget is located close to areas that were colonized during the Middle Ages.
Personsäkerhet vid väderskyddsbyggande : En kartläggning över dagsläget och problematiken med frånvaron av föreskrifter i branschen
This paper, Personal safety when working with weather encapsulation constructions, is focused on weather encapsulation constructions and how the absence of Swedish standards and regulations is affecting the safety for the workers. The usage of weather encapsulation construction is increasing in Sweden therefore the needs for standards and regulations are becoming more and more urgent. The risks involving the rising and the demolition of the weather encapsulation construction and when the construction is transported along its rails are treated in the paper. Since there are no regulations companies have had to solve the safety issues without instructions, the paper regards how the companies have solved this problem without the support of formal institutions..
Anva?ndning av markfuktighetskartor fo?r sta?ndortsanpassad plantering
Digital depth-to-water maps can be produced from a digital elevation model (DEM). Then GIS- based algorithms are used to calculate water flows and the depth-to-water index classes dry, fresh, moist and wet. The purpose of this study was to investigate the possibility to use depth- to-water maps for site adapted planting.The results showed that use of depth-to-water maps for site adapted planting, roughly halved the proportion of improperly planted surfaces from an average of 9 % to 4 %. The variation in the values of proper surface decreased and the result became more even.. In addition, more pine than spruce was incorrectly planted.