2013 Uppsatser om Construction contracts - Sida 5 av 135

Inneluftsventileradekryprumsgrunder : en utvärdering av två tillverkare

This Diploma work investigates internal air ventilated crawl-space in respect to construction and damp. The Diploma work assumes from a general description of crawl-space and general dump problems in ground construction. An internal air ventilated crawl-space is a construction where you take the ventilation air from the building and bring it down to the crawl-space and lets the air circulate before it passes through a retaining aggregate on the way out from the crawl-space. In this matter you get a worm space under the building and a lot less dump problems in form of · Ground damp · Build damp The ground dump reduces through draining around the building, different layer of gravel between the ground and the building and ventilation of the crawl- space. The build dump reduces through ventilation of the crawl-space as fast as possible.

Gynnar Sverige missbruk av visstidsanställning?

In the European Union and in Swedish labor law, permanent employment is the main goal for employment of workers. An exception to that rule is temporary employment. The Swedish rules relating to temporary employment have undergone several changes since the Employment Protection Act was implemented in 1974. The last reform in 2007 has received criticism by respondents for not following the Union directive on fixed-term work, which went into effect in 2001. In 2010 the European Commission opened an infringement case against Sweden, after a complaint from a Swedish employees? organization.

Framtagande av riktlinjer för arbetsplatsbesök enligt nya Plan- och bygglagen

A new site- and construction-law came into effect in May 2011. The new law, PBL2010:900 implies several different changes of the law. These changes concern bothconstructors, people working in municipality and county councils and other peoplethat in some way are related to the building sector. Except from the change in orderof the chapters and the renewed and modernized language, the law has now beenextended with a few new phases.According to the new law a certificate has to be issued to start and finish theconstruction; the construction consulting has changed name into technical consultingand the protocol for the controls has to show what the control is being compared to.This diploma work concerns control visits on construction sites as related to the newlaw. The reason why visits on construction sites are now implemented in the law isbecause the government saw a lack of trustworthiness in the old law.

Sveriges implementering av EU:s visstidsdirektiv 99/70/EG

This paper aims to study, from a legal dogmatic method, the Swedish legislation on fixed-term work related to the EU directive 99/70/EC1. In particular, the directives demand to prevent abuse of frequent temporary employment.An employer may, in agreement with the Swedish legislation combine different types of temporary employment, to prolong the time in the temporary employment. In this proceeding an employer can avoid employing an employee in a permanent position. For example, an employee can be employed in a probationary period of six months, in a general temporary employment for a maximum of 24 months, and thereafter in a temporary position for a maximum of 24 months before the employment turns into a permanent position. This provided that the employments were made by the same employer, and within five years.

Utveckling av handtag till spolarvätska

Title Becoming involved in the planning process - from the construction workers perspective.University/Institution Halmstad UniversityKeywordsEmpowerment through participation, construction workers involvement in decision making in the planning process, knowledge management and communication in the planning process, partnering, human resource managementAimThe aim of this bachelor thesis is to provide knowledge and examine how construction workers perceive involvement in the planning process of partnering projects, what they can contribute and what they get out of the planning process.Methodology The study was conducted with a qualitative approach in the form of semi-structured interviews.          The interview studie consist of 10 interviews with construction workers who are specially educated in participating in the planning process at the company ByggDialog AB.ConclusionAll respondents are positive to be involved in the planning process. The main advantages they can see is that they are able to influence technical solutions and methods that will be used later on in the production. Therefore it is important to consider when construction workers should be involved in the planning process so that they get the chance to influence in this decisions.When it comes to the decision making the construction workers should be involved in the decisions that are related to their tasks in the production such as technical solutions, choice of methods and materials. Their main duties and working hours should be in the production.Involvement in planning does not automatically mean that the construction workers are involved in the decision making, it is up to them how much they participate.

Analys ac konstruktionsprocessen inom FTC

This thesis work was made to optimize the writing of the construction specificationsat FKA. These construction specifications are created before each plant modificationsthat is started because requirements from the Swedish radiation safety authority(SSM) and internally on Forsmarks nuclear group as constructions / implementationdocumentationThe study was done through seven interviews of two people at three different groupsinvolved in the construction specification and an interview from the group accreditedverification. The four selected groups were selected through an extensive analyticalwork resulted in an elimination matrix where these four groups was considered to bemost involved with the construction specification.The questions asked to these individuals were based on the instructions and sampletext that are described in the construction specification. To ensure the quality of thethesis were to limit itself to the chapters that were considered most relevant toimprove. The analysis revealed a number of points that should be improved, partlyinto the routines when writing the construction specification and when ether sampletext or suggestions should be changed and complemented.

En empirisk studie av uppföljning av inköp av tjänster inom Lagen om offentlig upphandling

This thesis examines the verification of the terms and conditions stated in contracts based on the Public Procurement Act. In March 2013 the Swedish state procurement commission released " Good Business - A Strategy for Sustainable Public Procurement " (SOU 2013:12), which found that the proportion of control and verification is relatively low. The thesis examine how verification is carried out and looks for an explanation to why verification is not more oftenly performed. To answer these questions two care studies, based on seven semi-structured interviews, is presented as the empirical material. Network theory has been used to analyse the empirical results, and aspects of commonly used theories such as contract management and "Markets and Hierarchies" by Williamson has also been taken into account.

Nyanlända elever i fritidshem : En kvalitativ intervju om fritidspedagogers arbete med inkludering

The purpose of this study was to examine how pre-school teachers in Montessori inspired and traditional preschools can work with build and construction with the older children, and what views the pre-school teachers might have on the subject.  The study was implemented through qualitative semi-structured interviews with pre-school teachers. The investigational method was chosen due to the fact that I wanted to gain knowledge about the pre-school teachers? views and perspectives on build and construction activities, and how they might work with it. Another reason was to examine how the view on, and the work with build and construction can resemble and differ between Montessori inspired pre-schools and traditional pre-schools.The result shows that there is both similarities and diverseness between the Montessori influenced pre-schools and the traditional pre-schools, when it comes to how the pre-school teachers reason and work with build and construction.

Byggprojektstyrning med Earned Value Management

AbstractToday, too many construction projects are delayed and deviates from the budget. Agood project management is the basis for successful construction project. The mostcommon planning methods in the construction industry is currently Gantt chart andCPM. The problem with these is that focus is only at the time of the project anddoesn?t handle the budget.

Ta bort tidstjuvarna! : Om tidsbesparande effektiviseringsåtgärder inom det kommunala bostadsföretaget Gavlegårdarnas byggprojekt

AbstractThe development of the construction industry is slower compared to other industries. This implies that there must be improvements in this field. One step to increased effectiveness in construction projects is making the construction process more efficient, therefore resulting in a positive result for both the actual construction project and for the overall branch. The purpose of this study is to identify areas for improvement within the municipal housing company Gavlegårdarna completed construction project, who will then contribute to increased efficiency in their upcoming projects. The work has been performed with the help of two case studies examine construction projects "Fullriggaren" and "The three nursing homes." Opinions about what could have improved the efficiency of these construction projects further have been collected with the help of an interview study among some of the project participants involved in both projects.There have been many studies addressing the topic of how the construction process can be streamlined and similar studies that have been previously conducted.

Bygg och konstruktion med de äldre barnen i förskolan : En studie om pedagogers arbete och syn kring bygg och konstruktion i traditionell förskola och montessoriförskola

The purpose of this study was to examine how pre-school teachers in Montessori inspired and traditional preschools can work with build and construction with the older children, and what views the pre-school teachers might have on the subject.  The study was implemented through qualitative semi-structured interviews with pre-school teachers. The investigational method was chosen due to the fact that I wanted to gain knowledge about the pre-school teachers? views and perspectives on build and construction activities, and how they might work with it. Another reason was to examine how the view on, and the work with build and construction can resemble and differ between Montessori inspired pre-schools and traditional pre-schools.The result shows that there is both similarities and diverseness between the Montessori influenced pre-schools and the traditional pre-schools, when it comes to how the pre-school teachers reason and work with build and construction.

Kina i Afrika : En studie av Kinas afrikapolicy

Since the beginning of the new millennium, China has opened itself to the outside world and in an enormous pace increased its contacts and relationships with other countries. The trigger to these dramatic changes of economic and foreign policies is the insight that China can no longer sustain its rapid economic growth, largely based on industrial production, on energy and raw materials from China alone.Good relations with African countries have been of highest priority in China?s strategy of ?Going global?. The new African policy is based on the two principles of mutual benefit and non-interference in internal affairs ? as opposite to the West?s strategy of structural adjustment programmes (SAP), which include massive interference in internal affairs.

Konstruktionslösningar och deformationer i tre Östgötska medeltida sockenkyrkor

The purpose with this report is to illuminate the construction solutions and the deformations that could exist in medieval parish stone churches. But also to increase the writers understanding how activity forces effect the construction of the churches. With help from literature and a practical study, containing three churches the writers have collected the material that the conclusions and discussions are built upon in this report. The construction of the churches consists of three parts, the wall, the roof and the vault. The construction solutions are similar in the churches disregard of the roof, where the roof trusses are different.

Från branschspecifik till generell intäktsredovisning : en studie av hur tre svenska byggbolag påverkas av IASB:s föreslagna förändringar av intäktsredovisningen

Bakgrund och problem: Intäkter är en viktig post i den finansiella rapporteringen för användares beslutsfattande. Dock omgärdas intäktsredovisningen av flera svårigheter gällande bedömningar av när och till vilket belopp intäkter ska redovisas. Detta är speciellt ett problem vid redovisning av uppdrag som löper över flera redovisningsperioder, vilket är vanligt i byggbranschen. IASB har haft ett förslag till en ny standard för intäktsredovisning ute på remiss och IASB:s främsta syfte är att redovisningen ska vara användbar för användare av finansiella rapporter. Införandet av en ny standard kommer att innebära förändringar i byggbolagens redovisning och därmed även användbarheten i redovisningsinformationen.

Vindkraft för uppvärmning

This final thesis contains three major parts, which all have been time demanding:* Designing and construction of a small wind turbine.* Designing and construction of an electrical system.* Thesis with fundamental facts about wind, wind power and design.The thesis contains basic theory in wind power and the energy systems it can be combined with. Different types of wind turbines, which components they consists of and important issues to consider when designing is also mentioned. In the end of this report the technique of our wind turbine will be presented. In the end you can also read about our experiences during the time of designing and construction..